Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 ITI BHAWAN OLD MADRAS ROAD DOORVANI NAGAR BENGALURU KARNATAKA 560016 | BENGALURU URBAN | KARNATAKA | 560016 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically Disqualified |
| 4 | Rejected-Technical | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
12 Mar 2024, 12:00 pmClosed
Chief Electoral Office
Office of Chief Electoral Officer Uttarakhand First Floor Vishwakarma Bhawan Uttarakhand Secretariat Subash Road Dehradun248001
Fixing of GPS with Vehicle Tracking System in FST SST vehicles EVMs VVPATs transportation vehicles Zonal and Sector Magistrate and Polling Parties Vehicles
2024_CEOUK_70808_1
985/XXV-25/2023
Open Tender
Miscellaneous Services
50 days
All 13 District in uttarakhand
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
CEO Uttarakhand
₹10 L
Yes
Office of Chief Electoral Office
18 Mar 2024
4 Mar 2024
12 Mar 2024
4 Mar 2024
12 Mar 2024
7 Mar 2024
5 Mar 2024
Amount
Delivery of VTS Web Application, Mobile Application and Hosting of the VTS Software as per Scope of Work. .(Till the completion of contract)
All FST/SST vehicles to be installed with GPS Tracker and within 24 Hrs. of announcement of Lok Sabha Elections by ECI almost 45 days shall be based on schedule of election and Polling Days Rate of GPS inclusive of Installation, Commission and after poll decommissioning.
Vehicle for Zonal / Sector Magistrate to be installed on all vehicles from P-07 Days so that these officers are in field on P-05 Days at District Headquarter
To be installed in a sequential manner with Polling Parties moving on P-3 Days their vehicles GPS and VTS System installed on P-5
To be installed in a sequential manner with Polling Parties moving on P-2 Days there vehicle also to be ready on P-4 day.
To be installed in a sequential manner with Polling Parties moving on P-1 Day all the vehicles to be installed with VTS and GPS Tracking System by P-2 Day, so that these officers are in field on P-1 Days.
Control Room Set up at CEO and each DEO level as per the Scope of Work inclusive of manpower From the date of announcement Elections by ECI up to P+3 Days with all necessary infrastructure with Help Desk Support/ Onsite-Technical Support
Xenovex Technologies Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid