Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.1 LAdmitted-Finance VILLAGE SARKANDA P O GONA TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | 248008 | ₹76.1 L | L1 | Admitted-Finance |
| 2 | L2₹80.7 LAdmitted-Finance TEHRI G | DEHRADUN | UTTARAKHAND | 248008 | ₹80.7 L | L2 | Admitted-Finance |
| 3 | L3₹82.1 LAdmitted-Finance NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | ₹82.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS SHYAM SINGH L3 | Sunil Joshi Electrical Contractor L2 | DHARAM SINGH KATHAIT L1 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | Holding Clamp J-I hook for AB cable | 300 | NOS | 90,600 ₹90,600 | 90,000 ₹90,000 | 74,700 ₹74,700 |
| 3.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 5 | NOS | 1,325 ₹1,325 | 1,375 ₹1,375 | 1,245 ₹1,245 |
| 4.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 50 | NOS | 14,250 ₹14,250 | 14,750 ₹14,750 | 12,450 ₹12,450 |
| 5.00 | STAY CLAMP FOR SP-10 WITH NUT & BOLT | 30 | NOS | 8,400 ₹8,400 | 8,850 ₹8,850 | 7,470 ₹7,470 |
| 6.00 | EARTH WIRE CLAMP FOR SP-23 WITH
N/B | 42 | NOS | 12,600 ₹12,600 | 12,390 ₹12,390 | 10,458 ₹10,458 |
| 7.00 | DEAD END CLAMPS WITH I HOOK AND N/B INS | 185 | NOS | 95,275 ₹95,275 | 86,025 ₹86,025 | 83,065 ₹83,065 |
| 8.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 54 | NOS | 22,680 ₹22,680 | 22,410 ₹22,410 | 21,546 ₹21,546 |
| 9.00 | Susp. Clamp With I Hook (Ins.),Clamp,N&B | 280 | NOS | 1,40,560 ₹1.4 L | 1,40,000 ₹1.4 L | 1,25,720 ₹1.3 L |
| 10.00 | BRACING CLAMP TOP FOR SP-23 WITH
N/B | 16 | NOS | 6,640 ₹6,640 | 6,592 ₹6,592 | 5,600 ₹5,600 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
26 Feb 2026, 2:00 pmClosed
SE
EDC TEHRI
Increasing capacity of different DTRs (16KVA to 25KVA and 25KVA to 63KVA) and line strengthening work of 11 KV and LT line in village Semagad, Dhargaon etc. of Chamiyala Section under Electricity Distribution Division Tehri
2026_UPCL4_91904_1
74/EDCT/2025-26
Open Tender
Miscellaneous Services
90 days
Chamiyala
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE TEST
₹1.5 L
Yes
17 Apr 2026
11 Feb 2026
27 Feb 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
Electrical Items :
Holding Clamp J-I hook for AB cable
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-23 WITH NUT & BOLT
STAY CLAMP FOR SP-10 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
DEAD END CLAMPS WITH I HOOK AND N/B INS
PP & CLAMP WITH N&B ST POLE SP-23
Susp. Clamp With I Hook (Ins.),Clamp,N&B
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
Connecting Cable AB Cable to DB 1x25sqmm
Head shrink type end caps for LT ABC
Piercing Connector 70 Sq.mm-70Sq.mm
Piercing Connector 35 Sq.mm-35Sq.mm
INSULATED PIERCING CONNECTOR 50-50 SQ.MM
LT XLPE Cable 1x35 sqmm
LT XLPE AB CABLE 3X95+1X50 SQ.MM.
LT AB Cable 3x70+1x50 sqmm
LT AB Cable 3x35+1x25 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
LT AB CABLE 3CX50+1X35 SQ.MM
LT DISTRIBUTION BOX 1 PHASE
LT DISTRUBITON BOX 3 PHASE
AL CRIMPING TYPE LUGS 25 SQ.mm
LABOUR(SERVIES)
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF SP-10 SINGLE POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF 11 KV LINE(RABBIT)
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
DISMANTLING OF 16 KVA DTR
DISMANTLING OF 25 KVA DTR
INST. OF 63 KVA DTR ON POLE STRUCTURE
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF LIGHTNING ARRESTOR
LAYING OF RABBIT CONDUCTOR IN HT LINE
LOPPING & CHOPPINGOF TREE BRANCHES
CARTAGE SP-10 POLE, 151-200KM
CARTAGE SP-21/23 POLE, 151-200KM
CARTAGE OF PETTY MATERIAL,151-200KM
CARTAGE OF 16/25 KVA DTR, 151-200KM
CARTAGE OF 63 KVA DTR, 151-200KM
HEADLOAD CARTAGE SP-10 POLE(0-1 KM)
HEADLOAD CARTAGE SP-10 POLE(1-3 KM)
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM)
DISCONNECTION & RECONNECTION OF CONsumer
LAYING OF LT AB CABLE 3X70+1X50 SQMM
LAYING OF LT AB CABLE 3X35+1X25 SQMM
INSTALLATION OF LT DB 1 PH FOR LT AB
INSTALLATION OF LT DB 3 PH FOR LT AB CAB
LAYING OF AB CABLE 1X16+25 MM
FIXING OF HEAT SHRINK CAP FOR AB CABLE
BACK CARTAGE OF PETTY MATERIAL,151-200KM
LAYING AND FIXING OF 1X35SQMM XLPE CABLE
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
DISMANTLING OF LT XLPE CABLE 1CX16+25
LAYING OF LT AB CABLE 3CX50+1X35
LAYING OF LT XLPE ABC 3X95+1X70+16 SQ.MM
Please Enable Macros to View BoQ information
PQR PART-1 SHEET For Tender No. 74/EDCT/2025-26
PART -I OPENED ON DATE 27-02-2026 AT 12:00 HRS
Full Postal Address of Tenderers (Head Office)
Works Address
Contact No.
Email:- ID
The Bidder must have valid class A Electrical Contractor license issued by Uttarakhand State Authority.
The Bidders have successfully executed construction of LT/higher voltage line 3 Km. for UPCL/Power Sector Utilities during the last 5 year as on the date of bid opening. Bidder shall provide Certificate for the same issue from UPCL/SEB’s Power Utilities.
Minimum Average Annual Turnover (MAAT) of the bidder for three best of five financial years (i.e. 2020-21, 2021-22, 2022-23, 2023-24 & 2024-25) should not be less than 153.00 Lacs. Bidder shall submit Audited Balance sheet of the same along with the bid.
The bidder must have valid registration in labor department, income tax, EPF, ESI /GST and other related agencies/departments as per prevailing law. Bidder shall provide documentary evidence for the same.
The tenderer must have active GST registration.
An undertaking on Rs 100/- non judicial stamp paper duly notarized by that the bidder has not been blacklisted/ debarred by any Govt. undertaking/Govt. Departments / SEB’s/ Power Sector Utilities. In case same is found then their tender/order shall be treated as cancelled at any stage and EMD/Performance security shall be forfeited.
Bidder must submit validity of offer for 180 days from the date of opening of tender on 100/- stump paper along with Rs1/- revenue stamp (as per sheet enclosed)(hard copy of the same must be submitted).
Completion Period:- The Completion period of the work shall be 3 from issue of Transformer.
Earnest money (Rs.153000.00) in shape of BG/DD/FDR/CDR should be vaild for 180 days from the date of opening of tender + 45 days claim periods.(hard copy of the same must be submitted).
Whether bidder is Registered in MSME
Any other information regarding financial and organization capabilities etc. to ascertain your capacity to complete the project in time.
Any deviation.
Singature of Bidder
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_108837.xls
BOQ • 0.33 MB
s.pdf
Tender Documents • 1.44 MB
74PQR.xls
Other Document • 0.03 MB
Download all tender documents and submit your bid