Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹29.6 L−₹4.5 L (13.1%)Accepted-Finance | ₹29.6 L−₹4.5 L (13.1%) | H2 | Accepted-Finance Rate Quoted below |
| 2 | H1₹34.1 LRejected-Finance | ₹34.1 L | H1 | Rejected-Finance Rate Quoted High |
| Sl No | Description | Qty | Unit | Omsurveying H1 | HILL DESIGN SERVICE H2 |
|---|---|---|---|---|---|
| 1.00Finalisation of Alignment and Preparation of Detailed Project Report of Ring Road | |||||
| 1.01 | Survey work including preliminary and detailed survey. | 11 | km | 17,500 ₹1,92,500 Lowest | 20,000 ₹2,20,000 |
| 1.02 | Construction of 0.60 m wide trace cut. | 11 | km | 39,000 ₹4,29,000 | 30,000 ₹3,30,000 Lowest |
| 1.03 | Construction of Level Pillars. | 11 | km | 25,000 ₹2,75,000 | 22,000 ₹2,42,000 Lowest |
| 1.04 | Edge Demarcation in 9m width, for forest land acquisition. | 11 | km | 18,000 ₹1,98,000 | 16,000 ₹1,76,000 Lowest |
| 1.05 | Preparation of L-Section, Plan and Cross-Section. | 11 | km | 18,000 ₹1,98,000 Lowest | 18,000 ₹1,98,000 Lowest |
| 1.06 | Soil Testing, Geological Survey, Traffic Assessment Etc. | 11 | km | 5,000 ₹55,000 Lowest | 15,000 ₹1,65,000 |
| 1.07 | Preparation of DPR of Ring Road (5 Hard Copies) including relevant Drawing showing horizontal and vertical elements of Ring Road (5 Hard Copies) with dwg files. | 11 | km | 7,500 ₹82,500 | 7,000 ₹77,000 Lowest |
| 1.08 | Utility Shifting | 11 | km | 22,000 ₹2,42,000 | 14,000 ₹1,54,000 Lowest |
| 1.09 | Construction of back cutting line/pillars and job pillars. | 11 | km | 25,000 ₹2,75,000 Lowest | 45,000 ₹4,95,000 |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
28 Oct 2025, 5:00 pmClosed
Project Manager-02, PIU Song Dam, Dehradun
Office of Project Manager-02, PIU Song Dam, UPDCC Ltd. yamuna Colony Dehradun
CONSULTANCY SERVICES FOR PREPARATION OF DPR PREPARATION AND APPROVAL OF FOREST CASE STAGE-I AND STAGE-II FROM MOEFCC IN ALL RESPECTS AND PREPARATION OF PRIVATE LAND COMPENSATION PLAN FORPROPOSED RING ROAD AROUND SONG DAM RESERVOIR, TEHRI GARHWAL UK
2025_UPDC4_87854_1
02/PM-02/2025-26
Open Tender
Consultancy
Item Rate
365 days
Song Dam Project Site
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Yes
General Manager PIU Song Dam UPDCC Ltd. Dehradun
₹70,000
Yamuna Colony Dehradun
4 Nov 2025
6 Oct 2025
29 Oct 2025
8 Oct 2025
28 Oct 2025
10 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_104272.xls
BOQ • 0.29 MB
SBD2.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .