| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.5 LAccepted-Finance HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | L1 | Accepted-Finance FINANCIAL BID ACCEPTED | |
| 2 | L2₹96.7 L+₹18.2 L (23.1%)Accepted-Finance | L2 | Accepted-Finance FINANCIAL BID ACCEPTED | |
| 3 | L3₹1.0 Cr+₹23.3 L (29.7%)Accepted-Finance | L3 | Accepted-Finance FINANCIAL BID ACCEPTED | |
| 4 | Rejected-Technical | - | Rejected-Technical Experiance certificates does not fulfill the minimum qualification criteria of similiar work required as per clause 3 3A and C section 2 ITB of tender document |
Tender Value
₹93.7 L
EMD Value
₹1.9 L
Closing Date
11 Jun 2020, 5:00 pmClosed
Executive Engineer (G), Chilla power House
Executive Engineer (G), Chilla power House
Overhauling of 42.5 MVA, 11/139 KV, BHEL make transformer of Chilla Power House.
2020_UJVN_23404_1
02/EE(G-Chilla)/2019-20
Open Tender
Repair and Maintenance Services
Item Rate
120 days
Executive Engineer (G), Chilla power House
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Dy. General Manager (HGC), UJVN Ltd., Chilla,
₹1.9 L
19 Jun 2020
27 Mar 2020
12 Jun 2020
27 Mar 2020
11 Jun 2020
27 Mar 2020
Amount
Draining transformer oil to the drums & Transportation of transformer and its accessories from Chilla Power House to workshop including packing.
Sampling & DGA (Dissolved Gas Analysis) of oil as per IS 10593-2006.
Removal of top cover plate of transformer and other accessories.
Inspection and testing of core assembly.
Inspection and testing of 3- Phase LV & HV windings.
Replacement of all 3-Phase LV windings including insulation etc.
Replacement of all 3-Phase HV windings (if, required) including insulation etc.
Drying out of complete core- coil assembly to achieve proper IR values and Tan Delta Values and tanking of core coil assembly.
Overhauling of transformer along with replacement of OTI, WTI, LV bushing, Neutral bushing & Breather with silica gel.
Replacement of all gasket alongwith one new HV bushing.
Filtration (Centrifuging) & filling of testing oil & complete testing of transformer.
Painting of complete transformer as per IS 631.
Draining the transformer oil (Testing Oil).
Transportation of repaired transformer to Chilla Power House with filling of required inert gas.
Refilling of transformer oil to the repaired transformer at site.
Erection, Testing of the repaired transformer complete in all respect at Chilla Power House including DGA according to IS: 10593-2006 after dismantling one of the connected transformers as per availability of shutdown.
Shree Abirami Enggineering Works
Vishvas Power Engineering Services Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .