GEMC-511687746786348
Awarded to AJAD SINGH BOHARA
₹1.9 Cr
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Dismantling of Structural steel | AS PER REQUIREMENT | HSN not specified by seller | 36 Metric ton | 63,720 | 2,293,920 |
| Supply of Steel plates | AS PER REQUIREMENT | HSN not specified by seller | 35 Metric ton | 117,174 | 4,101,090 |
| Fabrication of Steel plates | AS PER REQUIREMENT | HSN not specified by seller | 35 Metric ton | 71,980 | 2,519,300 |
| Supply and Fabrication Structural Steel | AS PER REQUIREMENT | HSN not specified by seller | 12 Metric ton | 159,890 | 1,918,680 |
| Supply and Erection Grating | AS PER REQUIREMENT | HSN not specified by seller | 2 Metric ton | 129,800 | 259,600 |
| Supply and Fab Overflow Nozzle 80 NB | AS PER REQUIREMENT | HSN not specified by seller | 2 Each | 53,100 | 106,200 |
| Supply and Fab Inlet Nozzle 80 NB | AS PER REQUIREMENT | HSN not specified by seller | 2 Each | 21,240 | 42,480 |
| Double Scaffolding | AS PER REQUIREMENT | HSN not specified by seller | 6,500 cubic meter | 531 | 3,451,500 |
| Bottom Shell Plate Testing | AS PER REQUIREMENT | HSN not specified by seller | 2 Each | 92,040 | 184,080 |
| Tank Box up | AS PER REQUIREMENT | HSN not specified by seller | 2 Lump Sum | 64,900 | 129,800 |
| Slag Blasting | AS PER REQUIREMENT | HSN not specified by seller | 4,400 square meter | 330.4 | 1,453,760 |
| Zinc Silicate Primer 1 coat | AS PER REQUIREMENT | HSN not specified by seller | 4,400 square meter | 177 | 778,800 |
| Internal Tank Painting | AS PER REQUIREMENT | HSN not specified by seller | 2,250 square meter | 129.8 | 292,050 |
| External Tank Painting | AS PER REQUIREMENT | HSN not specified by seller | 2,150 square meter | 188.8 | 405,920 |
| Painting of HP LOGO | AS PER REQUIREMENT | HSN not specified by seller | 2 Each | 23,600 | 47,200 |
| Letter Painting | AS PER REQUIREMENT | HSN not specified by seller | 2 Each | 17,700 | 35,400 |
| Supply and Install 24 Inch Gate Valve | AS PER REQUIREMENT | HSN not specified by seller | 2 Each | 436,600 | 873,200 |
| Bottom Cleaning | AS PER REQUIREMENT | HSN not specified by seller | 2 Lump Sum | 14,160 | 28,320 |