Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 CrAccepted-Finance PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | ₹15.2 Cr | L1 | Accepted-Finance Overall L1 |
| 2 | L2₹16.2 CrRejected-Finance 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹16.2 Cr | L2 | Rejected-Finance Not L1 |
| 3 | L3₹18.5 CrRejected-Finance A 1 1 BKTPP CHP AREA BKTPP BIRBHUM 731104 | BIRBHUM | WEST BENGAL | 731104 | ₹18.5 Cr | L3 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | INDIAN CONSTRUCTION | PROJECT CONSTRUCTION SERVICES | AKA Logistics Private Limited |
|---|---|---|---|---|---|---|
| 1.00Unloading of BOBR & N-BOX, CHP-SGTPP | ||||||
| 1.01 | UNLOADING OF COAL FROM HEALTHY BOBR/NBOX
TYPE WAGONS | 3,82,320 | Number | 11,69,89,920 ₹11.7 Cr | 14,03,11,440 ₹14.0 Cr | 12,25,33,560 ₹12.3 Cr |
| 1.02 | CLEANING OF TRACK HOPPER GRATING AFTER
UNLOADING OF RAKES | 6,480 | Number | 2,68,92,000 ₹2.7 Cr | 3,08,25,360 ₹3.1 Cr | 2,69,56,800 ₹2.7 Cr |
| 1.03 | WEEKLY CLEANING OF RAIL TRACK
OF TRACK HOPPER(INCLUDING 50 METER LENGTH FROM
BOTH END OF TRACK HOPPER) | 192 | Number | 11,17,440 ₹11.2 L | 12,51,840 ₹12.5 L | 10,92,480 ₹10.9 L |
| 1.04 | DAILY CLEANING OF PLATEFORM
BY COMPRESSED AIR | 1,440 | Number | 33,12,000 ₹33.1 L | 37,55,520 ₹37.6 L | 32,68,800 ₹32.7 L |
| 1.05 | REMOVAL OF BLOCKED STONE FROM
PADDLE FEEDER | 4,200 | Number | 1,68,000 ₹1.7 L | 2,73,000 ₹2.7 L | 2,35,200 ₹2.4 L |
| 1.06 | REPAIR OF BOBR TYPE SICK WAGON | 312 | Number | 78,000 ₹78,000 | 1,19,184 ₹1.2 L | 1,03,116 ₹1.0 L |
| 1.07 | OVERSIZED (>250MM) STONE REMOVAL | 1,02,720 | Cubic Meter | 9,24,480 ₹9.2 L | 23,62,560 ₹23.6 L | 20,54,400 ₹20.5 L |
| 1.08 | ARCH BREAKING BY POKING AND OTHER MEANS | 600 | Number | 5,40,000 ₹5.4 L | 12,33,000 ₹12.3 L | 10,74,000 ₹10.7 L |
| 1.09 | MANUAL UNLOADING FROM N-BOX WAGON | 912 | Number | 9,12,000 ₹9.1 L | 37,29,168 ₹37.3 L | 32,56,752 ₹32.6 L |
Tender Value
₹16.8 Cr
EMD Value
₹33.5 L
Closing Date
24 Jan 2026, 3:00 pmClosed
The General Manager, SGTPP WBPDCL
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Rate Contract for unloading of coal from BOBR and N-BOX coal rakes to TH-I,II and Wagon Tippler respectively with other related job at CHP Phase-I, II , III (2X300MW, 2X500MW and 1X660MW) for Two (02) years.
2025_WBPDC_969273_1
WBPDCL/SGTPP/NIT/E3808/25-26
Open Tender
Support/Maintenance Service
SGTPP, WBPDCL.
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance
3 documents required · 3 mandatory
₹0
₹33.5 L
Yes
Contract Cell, SGTPP
11 Apr 2026
11 Dec 2025
27 Jan 2026
18 Dec 2025
24 Jan 2026
18 Dec 2025
8 Jan 2026
stage.html
html • 0.04 MB
techsummary_2355152.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_2355152.xls
BOQ • 0.35 MB
TD3808.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid