Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
28 Jun 2024, 4:00 pmClosed
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
TURNKEY JOBS OF DD PUMP and DIVING COMP FOR NAVY VESSELS
2024_CSL_198738_1
CSL/SRM3/ADV082-083
Open Tender
Marine Services
Turn-key
180 days
Cochin
Please refer the tender documents
2 documents required · 2 mandatory
₹0
Exempted
22 Jul 2024
19 Jun 2024
29 Jun 2024
19 Jun 2024
28 Jun 2024
19 Jun 2024
19 Jun 2024 - 27 Jun 2024
Amount
Scope 1 - Turnkey Job of DDPUMP, DIVING COMP - (RM.0788)
D/D PORTABLE PUMP (DC-8Y-DE) PORTABLE
LEAKAGE OBSERVED IN EXHAUST MANIFOLD OF DD PUMP . UNDERTAKE OVERHAUL AND MANUFACTURING OF EXHAUST MANIFOLD. (Service Cost)
LEAKAGE OBSERVED IN EXHAUST MANIFOLD OF DD PUMP . UNDERTAKE OVERHAUL AND MANUFACTURING OF EXHAUST MANIFOLD. (Material Cost)
DD PUMP NOT OPERATIONAL VIEW KNOCKING SOUND. UNDERTAKE OVERHAUL OF DD PUMP (Service Cost)
DD PUMP NOT OPERATIONAL VIEW KNOCKING SOUND. UNDERTAKE OVERHAUL OF DD PUMP (Material Cost)
UNDERTAKE MANUFACTURING OF ALUMINUM COVER FOR DD PUMP IN VIEW OF EXCESSIVE CORRODED/DAMAGE (Service cost)
UNDERTAKE MANUFACTURING OF ALUMINUM COVER FOR DD PUMP IN VIEW OF EXCESSIVE CORRODED/DAMAGE (Material cost)
DD PUMP NOT TAKING SUCTION.UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF DD PUMP - (Service Cost)
DD PUMP NOT TAKING SUCTION.UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF DD PUMP - (Material Cost)
MULTIPLE HOLES OBSERVED IN HOSES OF DD PUMP. UNDERTAKE REPLACEMENT OF HOSES OF DD PUMP. (Service Cost)
MULTIPLE HOLES OBSERVED IN HOSES OF DD PUMP. UNDERTAKE REPLACEMENT OF HOSES OF DD PUMP. (Material Cost)
UNDERTAKE MANUFACTURING OF DD PUMP SUCTION HOSE STRAINERS AS PER SAMPLE VIEW EXCESSIVELY CORRODED (MAT- SS , AL) (Service Cost)
UNDERTAKE MANUFACTURING OF DD PUMP SUCTION HOSE STRAINERS AS PER SAMPLE VIEW EXCESSIVELY CORRODED (MAT- SS , AL) (Material Cost)
UNDERTAKE REPAIR AND PROVE SERVICEABILITY CHECKS OF 37 TPH DD PUMP. (Service Cost)
UNDERTAKE REPAIR AND PROVE SERVICEABILITY CHECKS OF 37 TPH DD PUMP. (Material Cost)
REPAIR OF DD PUMP SUCTION STRAINER VIEW SEA WATER LEAKAGES (MAT - SS) (Service Cost)
REPAIR OF DD PUMP SUCTION STRAINER VIEW SEA WATER LEAKAGES (MAT - SS) (Material Cost)
STARTING ASSEMBLY NOT OPERATIONAL. UNDERTAKE REPLACEMENT OF STARTING ASSEMBLY OF DD PUMP (Service Cost)
STARTING ASSEMBLY NOT OPERATIONAL. UNDERTAKE REPLACEMENT OF STARTING ASSEMBLY OF DD PUMP (Material Cost)
DIVING COMPRESSOR SCATTERED
UNDERTAKE REPAIR AND PROVE SERVICEABILITY CHECKS OF DIVING CYLINDER CHARGING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE (Service Cost)
UNDERTAKE REPAIR AND PROVE SERVICEABILITY CHECKS OF DIVING CYLINDER CHARGING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE (Material Cost)
UNDERTAKE OVERHAULING OF DIVING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE. (Service Cost)
UNDERTAKE OVERHAULING OF DIVING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE. (Material Cost)
DIVATOR MK NOT BUILDING PRESSURE. UNDERTAKE OVERHAUL AND PRESSURE TEST OF DIVATOR MK-32Y CYLINDER (Service Cost)
DIVATOR MK NOT BUILDING PRESSURE. UNDERTAKE OVERHAUL AND PRESSURE TEST OF DIVATOR MK-32Y CYLINDER (Material Cost)
BASCCA CHARGING COMPRESSOR - QUATERDECK
REPAIR AND OVERHAULING OF BASCCA CHARGING AIR COMPRESSOR VIEW PRESSURE NOT BUILDING UP MORE THAN 80 BAR (Service Cost)
REPAIR AND OVERHAULING OF BASCCA CHARGING AIR COMPRESSOR VIEW PRESSURE NOT BUILDING UP MORE THAN 80 BAR (Material Cost)
BCD BOTTLE VARIOUS LOCATION
BCD BOTTLE NOT HOLDING PRESSURE. UNDERTAKE REPAIR AND PRESSURE TEST OF BCD BOTTLE CYLINDER (Service Cost)
BCD BOTTLE NOT HOLDING PRESSURE. UNDERTAKE REPAIR AND PRESSURE TEST OF BCD BOTTLE CYLINDER (Material Cost)
Scope 2 - Turnkey Job of DDPUMP, DIVING COMP - (RM.0789)
D/D PORTABLE PUMP (DC-8Y-DE) PORTABLE
LEAKAGE OBSERVED IN EXHAUST MANIFOLD OF DD PUMP . UNDERTAKE OVERHAUL/ MANUFACTURING OF EXHAUST MANIFOLD. (Service Cost)
LEAKAGE OBSERVED IN EXHAUST MANIFOLD OF DD PUMP . UNDERTAKE OVERHAUL/ MANUFACTURING OF EXHAUST MANIFOLD. (Material Cost)
DD PUMP NOT OPERATIONAL VIEW KNOCKING SOUND. UNDERTAKE OVERHAUL OF DD PUMP (Service Cost)
DD PUMP NOT OPERATIONAL VIEW KNOCKING SOUND. UNDERTAKE OVERHAUL OF DD PUMP (Material Cost)
UNDERTAKE MANUFACTURING OF ALUMINUM COVER FOR DD PUMP IN VIEW OF EXCESSIVE CORRODED/DAMAGE (Service Cost)
UNDERTAKE MANUFACTURING OF ALUMINUM COVER FOR DD PUMP IN VIEW OF EXCESSIVE CORRODED/DAMAGE (Material Cost)
DD PUMP NOT TAKING SUCTION.UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF DD PUMP - (Service Cost)
DD PUMP NOT TAKING SUCTION.UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF DD PUMP - (Material Cost)
MULTIPLE HOLES OBSERVED IN HOSES OF DD PUMP. UNDERTAKE REPALCEMENT OF HOSES OF DD PUMP. (Service Cost)
MULTIPLE HOLES OBSERVED IN HOSES OF DD PUMP. UNDERTAKE REPALCEMENT OF HOSES OF DD PUMP. (Material Cost)
UNDERTAKE MANUFACTURING OF DD PUMP SUCTION HOSE STRAINERS AS PER SAMPLE VIEW EXCESSIVELY CORRODED (MAT- SS , AL) (Service Cost)
UNDERTAKE MANUFACTURING OF DD PUMP SUCTION HOSE STRAINERS AS PER SAMPLE VIEW EXCESSIVELY CORRODED (MAT- SS , AL) (Material Cost)
UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF 37 TPH DD PUMP. (Service Cost)
UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF 37 TPH DD PUMP. (Material Cost)
REPAIR OF DD PUMP SUCTION STRAINER VIEW SEA WATER LEAKAGES (MAT - SS) (Service Cost)
REPAIR OF DD PUMP SUCTION STRAINER VIEW SEA WATER LEAKAGES (MAT - SS) (Material Cost)
STARTING ASSEMBLY NOT OPERATIONAL. UNDERTAKE REPLACEMENT OF STARTING ASSEMBLY OF DD PUMP (Service Cost)
STARTING ASSEMBLY NOT OPERATIONAL. UNDERTAKE REPLACEMENT OF STARTING ASSEMBLY OF DD PUMP (Material Cost)
DIVING COMPRESSOR SCATTERED
UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF DIVING CYLINDER CHARGING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE (Service Cost)
UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF DIVING CYLINDER CHARGING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE (Material Cost)
UNDERTAKE OVERHAULING OF DIVING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE. (Service Cost)
UNDERTAKE OVERHAULING OF DIVING COMPRESSOR IN VIEW OF NOT DEVELOPING PRESSURE. (Material Cost)
DIVATOR MK NOT BUILDING PRESSURE. UNDERTAKE OVERHAUL AND PRESSURE TEST OF DIVATOR MK-32Y CYLINDER (Service Cost)
DIVATOR MK NOT BUILDING PRESSURE. UNDERTAKE OVERHAUL AND PRESSURE TEST OF DIVATOR MK-32Y CYLINDER (Material Cost)
BASCCA CHARGING COMPRESSOR QUATERDECK
REPAIR/ OVERHAULING OF BASCCA CHARGING AIR COMPRESSOR VIEW PRESSURE NOT BUILDING UP MORE THAN 80 BAR (Service Cost)
REPAIR/ OVERHAULING OF BASCCA CHARGING AIR COMPRESSOR VIEW PRESSURE NOT BUILDING UP MORE THAN 80 BAR (Material Cost)
CHANDRIKA MARINE SERVICES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .