Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 323 DLF PRIME TOWER PLOT NO 79 80 BLOCK F NEW DELHI TINSUKIA ASSAM 786171 | TINSUKIA | ASSAM | 786171 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹6.7 L
Closing Date
13 Feb 2026, 3:00 pmClosed
EE
SCM SECTION MBA BASIN 4TH FLOOR TECHNOPOLIS KOLKATA
Hiring of One no 3 phase LP Separator AND Mobile ETP for Duration 09 months
2026_ONGC_264632_1
W26WL26001
Limited
Miscellaneous Services
Item Rate
270 days
Ashoknagar
REFER BID DOCUMENT
4 documents required · 4 mandatory
₹0
₹6.7 L
Yes
10 Mar 2026
29 Jan 2026
16 Feb 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
Particulars
Operating rate for separator(R-I)
Standby Rate (R-II) for Separator
Operating Rate of ETP (-------Per/M3*50 Cubic-meter*270days)
Mobilization of services(Separator and ETP)
De-mobilzation of services(Separator and ETP)
Notes as per SCC 1.Price shall be quoted only as per above Price Format. Evaluation will be done as per "Total Amount" . The quantities indicated above are for evaluation purpose only. However payment shall be regulated as per actuals. 2 The rates shall be firm for the entire duration of the contract and no escalation shall be allowed under any circumstances. 3 STANDBY DAY RATE I.E. NON OPERATING DAY RATE (R-II): ONGC shall pay to the contractor standby rate i.e. non-operating rate (R-II) for the period of non-operation of EPS due to reasons not attributable to the Contractor like: i. Interruption in the operation of EPS due to ONGC’s operational constraints. ii. Well operations/ interventions by ONGC leading to non-operation of EPS: iii. No feed or No Off-take due to ONGC operational constraints. iv. The standby day rate (R-II) shall not exceed 50 % of the Operating charges (R1). 4 OPERATING CHARGES: ONGC will pay to the Contractor an operating rate (R-I) for actual number of operating days as per the Scope of work, at the rate as per Price Schedule of Contract. Operating charges should be inclusive of but not limited to: a. Spares & consumables b. Manpower c. Boarding, Lodging and Transportation charges. 5 Mobilization and Demobilization charges: The Bidders are free to quote Mobilization and Demobilization charges separately. However, the amount for Mobilization and Demobilization charges inclusive of GST should not exceed 10% of the total Contract Value. Please refer SCC for details of Mobilization and Demobilization charges. 6 I/ We hereby give our consent that after opening of the price bid, if it is observed that mobilization/demobilization/standby charges/amounts quoted are higher than the limit mentioned in Price Format, the offer shall be evaluated restricting the charges/amounts up-to the specified limit. Contract (in case I/We becomes L-1) shall also be awarded restricting the charges/amounts up-to specified limit as mentioned in above.” Date: Signature of the Bidder Place: Name & Designation Company Seal
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tenderdocument.pdf
Tender Documents • 36.65 MB
BOQ_307237.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .