| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 LAccepted-AOC NO 165 VENBAKKAM VILLAGE PANRUTI POST ORAGADAM KANCHIPURAM DISTRICT ORAGADAM KANCHIPURAM TAMIL NADU 631604 | KANCHIPURAM | TAMIL NADU | 631604 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Mayekawa India Pvt. Ltd. L1 |
|---|---|---|---|---|
| 1.00RFQ ITEM NO.00010 Overhauling&troubleshooting of 15KASC003 | ||||
| 2.00 | SOR ITEM '00010:
Service Item no. 10:-
OVERHAULING OF COMPRESSOR
Contractor's Scope of work:-
1. Complete overhauling of compressor
9030-0015-KA-SC-003 is to be carried out at IOCL site, by deputation of atleast 2 nos. of service
engineers on the work bench/table. Overhauling activities shall include:
a.) Taking initial alignment reading before de-coupling of compressor.
b.) Supervision during decoupling.
2. All the checks are to be performed
as per manual.
3. Inspection of removed components /checking of all clearances and measurements / replacement of
components as per requirement.
4. Any other activities required for completion of overhauling.
5. Submission of detailed activity and overhauling report within 10 days of commissioning of compressor.
6. Accommodation, fooding, boarding,
lodging and transportation (outstation and local) will be in scope of the vendor.
IOCL Scope of work:-
1. To provide spares required for compressor overhauling.
2. Removal/ shifting of compressor from
skid to work bench for overhauling and shifting/ placement of compressor on skid from workbench
post overhauling.
3. To provide necessary working conditions such as work bench, lighting, crane, spare parts, electricity, cleaning agents etc. at site.
Note:-
1. No payment in man-days and overtime charges shall be applicable during overhauling of compressor.
2. Supervision Charges during commissioning activities related to compressor after overhauling shall be paid extra in man-days. | 1 | LS | 10,50,000 ₹10,50,000 Lowest |
| 3.00 | SOR ITEM '00020:
EXPERT SUPERVISION CHARGES-NORMAL
DAYS
This item will be applicable under following conditions:
a. Vendor is called at site solely for troubleshooting of compressor.
b. Supervision after overhauling of compressor. Duration will be from completion of overhauling on work bench till the trial run of compressor.
Work schedule:
1 DAY = 8 Hrs. duty time (09.00 hrs - 18.00 hrs) on normal working days (Monday-Saturday) with 1 hr. lunch break for service engineers.Contractor Scope of work:-
1. Supervision of activities after placement of compressor on the skid after overhauling, i.e. alignment, pipeline installation and other installation related activities.
2. Supervision of Oil charging and stabilization of the auxiliary system.
3. Trial run of the compressor.
4. Any other activities related to commissioning of compressor after overhauling.
5. Providing expert services and guidance of supervisory nature to IOCL resources in order to resolve problem of compressor when vendor is
called for troubleshooting activities.
6. Accommodation, fooding, boarding, lodging and transportation (outstation and local) will be in scope
of the vendor.
Note:-
Vendor may be called solely for troubleshooting of compressor as and
when required during the workorder
period with a prior intimation period
of atleast 7 days.
IOCL Scope of work:-
1. To provide spares for compressor.
2. Compressor alignment, installation
and cleaning of every other
auxiliaries including filter and
suction strainer.
3. Replacement of oil.
4. To provide necessary working
conditions such as work bench, lighting,
crane, spare parts, electricity,
cleaning agents etc. at site. | 10 | DAY | 2,40,000 ₹24,00,000 Lowest |
| 4.00 | SOR ITEM '00030:
Service Item no. 30:-
EXPERT SUPERVISION
CHARGES-OVERTIME CHARGES
This item will be applicable under
following conditions:
a. Vendor is called at site solely for
troubleshooting of compressor.
b. Supervision after overhauling of
compressor. Duration will be from
completion of overhauling on work bench
till the trial run of
compressor.
Work schedule:
1Hr. = 1Hr. of duty performed as below:
Overtime charges shall be applicable
for duty performed beyond normal
working hours (0900hrs to 1800hrs) on
normal working days
(Monday-Saturday) and for working on
Sundays or Holidays(as declared by
IOCL, Gujarat Refinery). | 24 | HR | 45,000 ₹10,80,000 Lowest |
Tender Value
Refer Docs
Closing Date
30 Sept 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM C
Gujarat Refinery
JC24MLS217- Overhauling and Troubleshooting of M s Mayekawa make Refrigeration Compressor Tag No 9030-0015-KA-SC-003 installed at MSQU unit of Gujarat Refinery
2024_JR_179374_1
JC24MLS217
Single
Mechanical Services
Works
730 days
Gujarat Refinery
As per NIT
5 documents required · 5 mandatory
Exempted
28 Nov 2025
4 Sept 2024
1 Oct 2024
4 Sept 2024
30 Sept 2024
4 Sept 2024
Amount
RFQ ITEM NO.00010 Overhauling&troubleshooting of 15KASC003
SOR ITEM '00010: Service Item no. 10:- OVERHAULING OF COMPRESSOR Contractor's Scope of work:- 1. Complete overhauling of compressor 9030-0015-KA-SC-003 is to be carried out at IOCL site, by deputation of atleast 2 nos. of service engineers on the work bench/table. Overhauling activities shall include: a.) Taking initial alignment reading before de-coupling of compressor. b.) Supervision during decoupling. 2. All the checks are to be performed as per manual. 3. Inspection of removed components /checking of all clearances and measurements / replacement of components as per requirement. 4. Any other activities required for completion of overhauling. 5. Submission of detailed activity and overhauling report within 10 days of commissioning of compressor. 6. Accommodation, fooding, boarding, lodging and transportation (outstation and local) will be in scope of the vendor. IOCL Scope of work:- 1. To provide spares required for compressor overhauling. 2. Removal/ shifting of compressor from skid to work bench for overhauling and shifting/ placement of compressor on skid from workbench post overhauling. 3. To provide necessary working conditions such as work bench, lighting, crane, spare parts, electricity, cleaning agents etc. at site. Note:- 1. No payment in man-days and overtime charges shall be applicable during overhauling of compressor. 2. Supervision Charges during commissioning activities related to compressor after overhauling shall be paid extra in man-days.
SOR ITEM '00020: EXPERT SUPERVISION CHARGES-NORMAL DAYS This item will be applicable under following conditions: a. Vendor is called at site solely for troubleshooting of compressor. b. Supervision after overhauling of compressor. Duration will be from completion of overhauling on work bench till the trial run of compressor. Work schedule: 1 DAY = 8 Hrs. duty time (09.00 hrs - 18.00 hrs) on normal working days (Monday-Saturday) with 1 hr. lunch break for service engineers.Contractor Scope of work:- 1. Supervision of activities after placement of compressor on the skid after overhauling, i.e. alignment, pipeline installation and other installation related activities. 2. Supervision of Oil charging and stabilization of the auxiliary system. 3. Trial run of the compressor. 4. Any other activities related to commissioning of compressor after overhauling. 5. Providing expert services and guidance of supervisory nature to IOCL resources in order to resolve problem of compressor when vendor is called for troubleshooting activities. 6. Accommodation, fooding, boarding, lodging and transportation (outstation and local) will be in scope of the vendor. Note:- Vendor may be called solely for troubleshooting of compressor as and when required during the workorder period with a prior intimation period of atleast 7 days. IOCL Scope of work:- 1. To provide spares for compressor. 2. Compressor alignment, installation and cleaning of every other auxiliaries including filter and suction strainer. 3. Replacement of oil. 4. To provide necessary working conditions such as work bench, lighting, crane, spare parts, electricity, cleaning agents etc. at site.
SOR ITEM '00030: Service Item no. 30:- EXPERT SUPERVISION CHARGES-OVERTIME CHARGES This item will be applicable under following conditions: a. Vendor is called at site solely for troubleshooting of compressor. b. Supervision after overhauling of compressor. Duration will be from completion of overhauling on work bench till the trial run of compressor. Work schedule: 1Hr. = 1Hr. of duty performed as below: Overtime charges shall be applicable for duty performed beyond normal working hours (0900hrs to 1800hrs) on normal working days (Monday-Saturday) and for working on Sundays or Holidays(as declared by IOCL, Gujarat Refinery).
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .