Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹97.4 L
EMD Value
₹1.9 L
Closing Date
27 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Completion of balance work of Gongyur khul Chulichan Samrah RD 0-650 mtr.
2026_PWD_19733_2
e-Tender 26 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
Works
120 days
KARGIL
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Payable To Executive Engineer I-FC Division Kargil
₹1.9 L
15 Oct 2026
15 Oct 2026
28 Oct 2026
15 Oct 2026
27 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge | |||||
| 1.01 | All Kind of Soil 80% | 163.68 | Cum | 531.04 | ₹86,920.63 |
| 1.02 | Soft Rock 20% | 40.92 | Cum | 842.03 | ₹34,455.87 |
| 2Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 2.01 | All Kind of Soil 80% | 549.5 | Cum | 431.4 | ₹2,37,054.3 |
| 2.02 | Soft Rock 20% | 137.3 | Cum | 954.5 | ₹1,31,052.85 |
| 3 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 course sand and 3 graded crushed stone agg. 20mm nominal size. | 315 | Cum | 10,742.59 | ₹33,83,915.85 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement: 2 coarse sand (zone-III) derioved from natural sources: 4 graded stone aggregate 20mm nominal size derived from natural sources) | 431.55 | Cum | 7,734.55 | ₹33,37,845.05 |
| 5 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. | 3,293.96 | KG | 105.78 | ₹3,48,435.09 |
| 6 | Centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster, buttresses plinth and string coarse ect walls of any thickness | 1,584.8 | Sqm | 614.86 | ₹9,74,430.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_46606.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .