Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
27 May 2026, 11:30 amClosed
THE COMMANDING OFFICER, ICGS VERAVAL
ICGS VERAVAL POST BOX NO 03 PIN 362265
undertaking defects liquidation of Engineering Electrical and Hull defects onboard ICGS C-149 C-153
2026_ICG_766120_1
VRL/RFP/RM/IB/01/26-27 DATED 18 MAY 26
Limited
Miscellaneous Services
Lump-sum
ICGS VERAVAL
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹0
Exempted
28 May 2026
18 May 2026
28 May 2026
18 May 2026
27 May 2026
19 May 2026
19 May 2026 - 27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | L-41: - Stbd AC compressor tripping frequently due to motor overload and drawing excessive starting current. Motor winding showing low insulation. Defect to be rectified and AC system to be proved for satisfactory operation. | 1 | job | - | - |
| 1.02 | E-59:- Lub Oil leakage observed from Stbd DA view filter body cracked. Same to be repaired/ replaced and proved for satisfactory operation. | 1 | job | - | - |
| 1.03 | L-31: - Telephone command system (Make: M/s Vingtor Steenhans) not working in ward room, works station, EP’s mess and CO’s cabin. DI/DR to be carried and Telephone command system to be proved for satisfactory operation. | 1 | job | - | - |
| 1.04 | H-57: - Ship’s Gemini (Markwel Gemini Craft 4.7 mtr Sr. no. MCG/003) keel found broken, wooden deteriorated and forward chamber air leakage the same to be repaired/ renewed as per sample and gemini to be proved for satisfactory of operation all in way job included. | 1 | job | - | - |
| 1.05 | E-59 Grey water pump is not taking suction from grey water tank. Pump to be overhauled and suction pipeline to be chemically cleaned & pressure testing to be carried out. Pump to be proved for satisfactory operation. All inway jobs included. | 1 | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_858012.xls
BOQ • 0.23 MB
rfp.pdf
Tender Documents • 1.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .