GM MECHANICAL
GM MECHANICAL OPPOSITE ORE HANDLING COMPLEX PORT AREA VISAKHAPATNAM
AMC OF LOW SIDE EQUIPMENTS OF A.C PLANT AT NALCO PORT FACILITIES VISAKHAPATNAM
2022_NALCO_681780_1
NALCO/PF/e-TENDER/82/48/869
Limited
Miscellaneous Services
Item Rate
730 days
PORT AREA
2 documents required · 2 mandatory
₹0
Exempted
29 Apr 2022
1 Apr 2022
16 Apr 2022
2 Apr 2022
15 Apr 2022
4 Apr 2022
2 Apr 2022 - 15 Apr 2022
Amount
PART-A Please refer to the scope work for details
Monthly Activities: (i) Cleaning of cooling coils & air filters with water & detergent (ii) Cleaning of water strainers (iii) Checking of “V” Belts of AHU Fan, its tension , replacement of “V” Belt including supply if found damaged (iv) Thorough cleaning of AHU room, grills inside office rooms of each floor
Once in 04 months Activities: (i) Draining out old water from the chilled pipes, refilling fresh water & venting out air if required (ii) Checking of alignment between AHU Motor & Pulley, making it right in case of mis-alignment (iii) Greasing of AHU Wheel/fan Bearings
Servicing /overhauling of AHU motor(Once in two years): Servicing/Overhauling of AHU Motors (4 Nos) including supply of bearings & all consumables (once during the 2-years contract).
Maintenance of Cooling water pump motor & pipe line valves Once in 04 months Activities: (i) To check the gland packing of water pump & changing the same including supply of Gland packing, nuts, bolts, washers, etc. (ii) To check the water pump motor terminations in motor TB & local MCB. Making good the termination, if found defective, including supply of al materials like glands, lugs, TB, MCB & all consumables. (iii) To check the water pipe line butterfly valves for proper closing/opening & greasing of valves
Cooling Water Pumps (Once in a Year): Cooling Water Pump Motor:3-Ph, 7.5KW, 2900rpm, monobloc with pump, Kirloskar make Servicing/overhauling of Motor & Pump including supply of motor bearings, application of red insulating varnish & painting of motor(Once during the contract).(All the materials to Party’s account)
Maintenance of Electrical panel board Once in 04 months Activities: (i) Cleaning of electrical panel board complete & tightening of all terminations (ii) Checking of main switches, DOL Starters, cable terminations, MCBs of AHU rooms/local controls & replacement of the defective components, if any, is including supply.
PART-B ON REQUIREMENT BASIS ONLY IN CASE OF BREAKDOWN):- OPTIONAL WORKS
Rewinding & complete overhauling of motors including supply of bearings, painting, all consumables, etc
Supply & Replacement of AHU Blower Wheel
Supply & replacement of defective butterfly valves of water pipeline including breaking & making of pipe line insulation (Cement plaster, chicken wire mesh, Thermo cool, bitumen, etc)
AMARAVATI ENTERPRISES
MULTI POWER ENTERPRISES
SUNSHINE ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_717501.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .