| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹47.7 L+₹9.2 L (23.8%)Rejected-AOC | L2 | Rejected-AOC L2 BIDDER | |
| 3 | L3₹65.4 L+₹26.8 L (69.6%)Rejected-AOC | L3 | Rejected-AOC L3 BIDDER |
Tender Value
Refer Docs
Closing Date
5 Aug 2024, 2:00 pmClosed
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
TURNKEY JOB OF REFRIGERATION PLANT JOBS FOR NAVY VESSELS
2024_CSL_202179_1
CSL/SRM3/ADV088-089_1
Open Tender
Marine Services
Turn-key
180 days
Cochin
Please refer the tender documents
2 documents required · 2 mandatory
₹0
Exempted
3 Nov 2024
23 Jul 2024
6 Aug 2024
23 Jul 2024
5 Aug 2024
23 Jul 2024
23 Jul 2024 - 3 Aug 2024
Amount
Scope 1 - TURNKEY JOB OF REFRIGERATION PLANT for Navy Vessel 1 (RM.0788)
REFRIGERATION PLANT (700 KCAL/HR) ASP PORT STORE/ ASP STBD CANTEEN/ SHIPS GALLEY
RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Service cost)
RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Material cost)
RENEW & CALIBRATE THE EXPANSION VALVE. (Service cost)
RENEW & CALIBRATE THE EXPANSION VALVE. (Material cost)
RENEW SV MOUNTS. (Service cost)
RENEW SV MOUNTS. (Material cost)
RENEW & CALIBRATE ALL INSTRUMENTATION INCLUDING PRESSURE SAFETY VALVES. (Service cost)
RENEW & CALIBRATE ALL INSTRUMENTATION INCLUDING PRESSURE SAFETY VALVES. (Material cost)
RENEW ALL SYSTEM VALVES UNDERTAKE TRIAL (Service cost)
RENEW ALL SYSTEM VALVES UNDERTAKE TRIAL (Material cost)
CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. RENEW BALANCE 50% (Service cost)
CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. RENEW BALANCE 50% (Material cost)
WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Service cost)
WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Material cost)
Scope 2 - TURNKEY JOB OF REFRIGERATION PLANT for Navy Vessel 2 (RM.0789)
RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Service cost)
RENEW BATTONING, DOOR, INTERNAL PANELS AND LAGGING OF REF PLANT UNIT (Material cost)
RENEW & CALIBRATE THE EXPANSION VALVE. (Service cost)
RENEW & CALIBRATE THE EXPANSION VALVE. (Material cost)
REPLACE (WITH NEW) SV MOUNTS. (Service cost)
REPLACE (WITH NEW) SV MOUNTS. (Material cost)
RENEW & CALIBRATE ALL INSTRUMENTATION INCLUDING PRESSURE SAFETY VALVES. (Service cost)
RENEW & CALIBRATE ALL INSTRUMENTATION INCLUDING PRESSURE SAFETY VALVES. (Material cost)
REPLACE (WITH NEW) ALL SYSTEM VALVES UNDERTAKE TRIAL (Service cost)
REPLACE (WITH NEW) ALL SYSTEM VALVES UNDERTAKE TRIAL (Material cost)
CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. REPLACE (WITH NEW) BALANCE 50% (Service cost)
CARRY OUT OVERHAUL OF 50% SYSTEM VALVES. REPLACE (WITH NEW) BALANCE 50% (Material cost)
WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Service cost)
WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN. THEREAFTER PRESSURE TEST WITH DRY NITROGEN AT 30 KG/CM2 G PRESSURE FOR 6 HOURS. ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE DEHYDRATED BY VACUUM PUMP. THEREAFTER CARRY OUT VACUUM TEST FOR 24 HOURS. AND THEREAFTER UNDERTAKE COMPREHENSIVE SYSTEM PERFORMANCE CHECKS AND RECORD PARAMETERS. (Material cost)
UBS REFRIGERATION COMPANY
DCON ENGINEERING INTERNATIONAL LLP
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .