| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 2ND FLOOR KALOOR BUSSTAND COMPLEX BUS STAND COMPLEX KALOOR BUSSTAND COMPLEX ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Nov 2021, 11:00 amClosed
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Electrical works on MV Tharangini
2021_HSL_87854_1
20/21999/116/2021-22
Open Tender
Miscellaneous Services
Service
25 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
8 Nov 2021
27 Oct 2021
2 Nov 2021
27 Oct 2021
2 Nov 2021
27 Oct 2021
Amount
Existing Intercom is not functioning. Renewal of Intercom system as per existing system. Satisfactory trials to be shown to SS/HSL
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.1 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 1.1 against third party/OEM invoice.
Electrical steering system to be made operational. Satisfactory trials to be shown to SS/HSL
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.2 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 2.1 against third party/OEM invoice.
Both Auxiliary Engine panel board to be inspected, Necessary Electronic Parameters wiring to be renewed.
Calibration of all safety trips, alarms, cutouts, transmitters and proving of safety alarms & trips of both generators.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.Nos.3 & 3.1 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 3.2 against third party/OEM invoice.
Sea water and fresh water hydrophore tanks pressure switch, pressure guages to be calibrated and 2Nos new pressure switch to be given to vessel staff.
Calibration / Renewal of Pressure Switch
Supply of New Pressure Switch to SS
Calibration / Renewal of Pressure Guages
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.Nos.4, 4.1 & 4.3 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 4.5 against third party/OEM invoice.
SRI VINAYAKA MARINE SERVICES
POSITIVE CONTROLS
SMEC Automation Pvt Ltd
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .