Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.7 L
EMD Value
₹6,000
Closing Date
3 Dec 2026, 1:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE/IGWTP
IGWTP,MANIRAMPUR,BARRACKPORE
RENOVATION OF INSPECTION WALKWAY CUM WOODEN PLATFORM OF THE CLARIFIER BRIDGE NO-1 AND 3 AT 60 MGD PLANT,IGWTP
2026_KMC_1049945_1
KMC/IGWTP/098/26-27, DT-20/11/2026
Open Tender
MECHANICAL
Percentage
20 days
IGWTP, MANIRAMPUR, BARRACKPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
Office of the EE/IGWTP
23 Nov 2026
23 Nov 2026
5 Dec 2026
23 Nov 2026
3 Dec 2026
26 Nov 2026
25 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (G) WOOD AND PVC WORKS C. MISCELLANEOUS WOODWORK 1 A. Wood work in posts, post plates, rafters, battens, truss members, purlins etc.fitted and fixed complete (excluding the cost of bolts, paints, but including the costof nails, screws etc.) (The quantum should be corrected upto three decimals) (ii) Sal : Local. Note: Extra for Lifting Charges:-i) upto 4th floor Rs. 200/- per Cu.m per Floor.ii) Above 4th floor Rs. 250/- per Cu.m per Floor. | 2.25 | cubic meter | 77,735 | ₹1,74,670.54 |
| 2 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) | 87.38 | sq.meter | 38 | ₹3,320.44 |
| 3 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white) | 87.38 | sq.meter | 81 | ₹7,077.78 |
| 4 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 7. Supplying, fitting, fixing bolts with nuts, washer (i) 10 to 16 mm dia: (a) Length up to 75 mm (3rd Corrigenda & addenda dated 04.06.2018) | 12 | Kilogram | 157 | ₹1,884 |
| 5 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 6)Carpenter (Ordinary). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 8 | Each | 296 | ₹2,368 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 7)Carpenter (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 8 | Each | 270 | ₹2,160 |
| 7 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m (3rd Corrigenda & addenda dated 04.06.2018) | 0.26 | Matric Ton | 75,266 | ₹19,569.16 |
| 8 | CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Epoxy' Resin of thickness not less than 160 micron with a lowviscosity,crystallization-resistant epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal,concrete and wood surface to protect from corrosion as well as damagefrom chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [This item will be operated on prior permission from the concerned SE/Dy Chief Engineer] | 27.65 | Sq.Meter | 449 | ₹12,414.85 |
| 9 | Sub Total | - | - | - | - |
| 10 | GST 18% | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
techbid.pdf
Tender Documents • 1.19 MB
BOQ_2569449.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .