Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC OLD 104 8 NIRUPAMA DEBI ROAD BERHAMPORE DIST MURSHIDABAD W B 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | ₹8.8 L | L1 | Accepted-AOC Successful |
| 2 | L2₹10.1 LRejected-Finance 11 BIPLABI JYOTISH JOARDAR SARANI PARK CIRCUS KOLKATA W B 700017 | KOLKATA | WEST BENGAL | 700017 | ₹10.1 L | L2 | Rejected-Finance Unsuccessful |
| 3 | L3₹10.8 LRejected-Finance | ₹10.8 L | L3 | Rejected-Finance Unsuccessful |
| Sl No | Description | Qty | Unit | NILOY MAJUMDAR L1 | RASEL CONSTRUCTION COMPANY L2 | SATIMATA CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.01 | Day to day sweeping the compound road pathways (mettalled or earthen) and deposited the garbage, plastic or similar identical waste materials in the centre of the formed working zone and removal and disposal of the same in conformity with the Municipal/ Corporation rules as per direction of Engineer-in-charge from 0.00 to 1.00 kmp. on both side on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I in the district of North 24 Parganas for the period of one year.
34675.00 Sq. M/ day
Total Area= [365x34675]÷2 =6328188 Sq. M | 63,28,188 | % Sq.M | 11.94 ₹7.6 L | 13 ₹8.2 L | 13.5 ₹8.5 L |
| 1.02 | Removal of rubbish, earth etc. From the working site and disposal of the same beyond the compound, in conformity with the Municipal/ Corportation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer-in-charge. for the period of one year.
3.4675 Cu. M/ day
Total Volume= [365x3.4675]÷2 =1350.50 Cu. M | 632.82 | Cu.M | 204 ₹1.3 L | 300 ₹1.9 L | 350 ₹2.2 L |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
22 Nov 2025, 1:00 pmClosed
Executive Engineer Barasat Highway Division-I
Office of The Executive Engineer Barasat Highway Division-I, P.W. (Roads) Dte. Purta Bhavan, 3rd Floor, Room No. 305, 306, 307, 308, 309 Salt Lake, Kolkata-700091
Day to day sweeping the main carriageway, service road footpath and removal disposal of waste materials from 2.00-3.15 kmp. from both side of KNI Avenue under Baguihati Highway Sub-Division of Barasat Highway Division No-I for the period of six mnt
2025_WBPWD_937893_2
WBPWRD/EE/BHD-I/eNIQ-07/25-26
Open Tender
Miscellaneous Services
183 days
BAGUIHATI
Please refer Tender documents.
4 documents required · 4 mandatory
₹40,000
9 Jan 2026
4 Nov 2025
24 Nov 2025
4 Nov 2025
22 Nov 2025
7 Nov 2025
Amount
Day to day sweeping the compound road pathways (mettalled or earthen) and deposited the garbage, plastic or similar identical waste materials in the centre of the formed working zone and removal and disposal of the same in conformity with the Municipal/ Corporation rules as per direction of Engineer-in-charge from 0.00 to 1.00 kmp. on both side on KNI Avenue under Baguiati Highway Sub-Division of Barasat Highway Division No-I in the district of North 24 Parganas for the period of one year. 34675.00 Sq. M/ day Total Area= [365x34675]÷2 =6328188 Sq. M
Removal of rubbish, earth etc. From the working site and disposal of the same beyond the compound, in conformity with the Municipal/ Corportation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer-in-charge. for the period of one year. 3.4675 Cu. M/ day Total Volume= [365x3.4675]÷2 =1350.50 Cu. M
RASEL CONSTRUCTION COMPANY (BID ID -7354507)
SATIMATA CONSTRUCTION (BID ID -7354551)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
WBF.pdf
Tender Documents • 1.16 MB
BOQ_2212488.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid