Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹3.8 L Construction of Phase-III Project works (Part-I) of 150 bedded Boys Hostel (G plus 2) including internal water supply, sanitary installations, drainage and internal electrical installation i/c Development works at Tripura University, Suryamaninagar, Agartala. SH: Providing Inspection vehicle in the Office of Assistant Engineer-III under Tripura-I, CPWD, Usha Bazar, Agartala. | Construction of Phase-III Project works (Part-I) of 150 bedded Boys Hostel (G plus 2) including internal water supply, sanitary installations, drainage and internal electrical installation i/c Development works at Tripura University, Suryamaninagar, Agartala. SH: Providing Inspection vehicle in the Office of Assistant Engineer-III under Tripura-I, CPWD, Usha Bazar, Agartala. | L1 | |
| 2 | L2₹3.8 L+₹768.88 (0.20%) Construction of Phase-III Project works (Part-I) of 150 bedded Boys Hostel (G plus 2) including internal water supply, sanitary installations, drainage and internal electrical installation i/c Development works at Tripura University, Suryamaninagar, Agartala. SH: Providing Inspection vehicle in the Office of Assistant Engineer-III under Tripura-I, CPWD, Usha Bazar, Agartala. | Construction of Phase-III Project works (Part-I) of 150 bedded Boys Hostel (G plus 2) including internal water supply, sanitary installations, drainage and internal electrical installation i/c Development works at Tripura University, Suryamaninagar, Agartala. SH: Providing Inspection vehicle in the Office of Assistant Engineer-III under Tripura-I, CPWD, Usha Bazar, Agartala. | L2 |
| Sl No | Description | Qty | Unit | Sumangal Ghosh L1 | Tutan Sengupta L2 |
|---|---|---|---|---|---|
| 1 | Construction of Phase-III Project works (Part-I) of 150 bedded Boys Hostel (G plus 2) including internal water supply, sanitary installations, drainage and internal electrical installation i/c Development works at Tripura University, Suryamaninagar, Agartala. SH: Providing Inspection vehicle in the Office of Assistant Engineer-III under Tripura-I, CPWD, Usha Bazar, Agartala. | - | - | 3.79 ₹3,80,009.44 Lowest | 4 ₹3,80,778.32 |
Tender Value
₹3.7 L
EMD Value
₹7,323
Closing Date
18 Jun 2024, 3:00 pmClosed
AE-TCSD-III
JITENDRA KUMAR
Type-III/74 GPRA GANDHIGRAM
Construction of Phase-III Project works (Part-I) of 150 bedded Boys Hostel (G plus 2) including internal water supply, sanitary installations, drainage and internal electrical installation i/c Development works at Tripura University, Suryamaninagar, Agartala. SH: Providing Inspection vehicle in the Office of Assistant Engineer-III under Tripura-I, CPWD, Usha Bazar, Agartala.
77492
09/EE/AE/TCSD-III/TCD-I/AGT/2024-25
OPEN
Hiring of Vehicles
NCB
6 months
West Tripura, Tripura
6 documents required · 6 mandatory
₹7,323
Not Applicable
18 Jun 2024
11 Jun 2024
18 Jun 2024
18 Jun 2024
18 Jun 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT09VehicleAEIII.pdf
document • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .