Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15.8 L
Closing Date
17 Apr 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
18 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All the instructions furnished in the Technical Compliance/ Commercial Compliance/ Custom/ Undertakings/General Instructions/Undertakings are only indicative and not exhaustive. The tenderer shall read the GCC/Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
Tender value is including escalation of (-) 15% (minus Fifteen percent) on CPWD DSR 2023 rates Tenderer should note this before quoting the rates.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the official nominated (i.e.OS/Tenders/Engg/NED Division) within before closing date for submission of bids.(i.e., excluding the last date of submission of Bids).
Provision of Ballast less Track at Nanded station. (Trail of new design of BLT-IFS for speed up to 130kmph- Road2-720m).
T-202526-2-116~SCR
T-202526-2-116
Open
Works - General
12 Months
Nanded, Maharashtra
₹0
₹15.8 L
17 Apr 2026
21 Mar 2026
3 Apr 2026
141 items across 3 schedules · ₹8,38,92,424.75 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| CARRIAGE OF MATERIALS | — | — | — | — | |
| By Mechanical Transport including loading, unloading and stacking | — | — | — | — | |
| 1 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. | cum | 4860 | 494.1 | 24,01,326 |
| EARTH WORK | — | — | — | — | |
| General | — | — | — | — | |
| Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | — | — | — | — | |
| 2 | All kinds of soil | cum | 3240 | 177.5 | 5,75,100 |
| Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | — | — | — | — | |
| 3 | All kinds of soil. | cum | 1638 | 260.3 | 4,26,371.4 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | cum | 810 | 2,123.75 | 17,20,237.5 |
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 5 | 1:1 1/2:3 (1 Cement: 1 1/2 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 648 | 8,340.85 | 54,04,870.8 |
| 6 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | 540 | 7,178.75 | 38,76,525 |
| REINFORCEMENT CEMENT CONCRETE | — | — | — | — | |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 7 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 1440 | 392.15 | 5,64,696 |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | Sqm | 4320 | 842.5 | 36,39,600 |
| STEEL REINFORCEMENT | — | — | — | — | |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | — | — | — | — | |
| 9 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 49870 | 107.85 | 53,78,479.5 |
| DESIGN MIX CONCRETE | — | — | — | — | |
| Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in- charge, for the following grades of concrete.: | — | — | — | — | |
| All works upto plinth level | — | — | — | — | |
| 10 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 432 | 9,504.75 | 41,06,052 |
| 11 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | Quintal | 216 | 733.5 | 1,58,436 |
| MASONRY WORK | — | — | — | — | |
| General | — | — | — | — | |
| Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | — | — | — | — | |
| 12 | Cement mortar 1:4 (1 cement : 4 coarse sand) | cum | 41.4 | 7,370.65 | 3,05,144.91 |
| STEEL WORK | — | — | — | — | |
| General | — | — | — | — | |
| 13 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 16666.67 | 133.7 | 22,28,333.78 |
| FINISHING | — | — | — | — | |
| CEMENT PLASTER (IN COARSE SAND) | — | — | — | — | |
| 12 mm cement plaster of mix : | — | — | — | — | |
| 14 | 1:4 (1 cement: 4 coarse sand) | Sqm | 360 | 357.35 | 1,28,646 |
| EXTERIOR FINISHING | — | — | — | — | |
| Finishing walls with Acrylic Smooth exterior paint of required shade : | — | — | — | — | |
| 15 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | Sqm | 100 | 160.6 | 16,060 |
| Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : | — | — | — | — | |
| 16 | Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | Sqm | 100 | 226.25 | 22,625 |
| DISMANTLING AND DEMOLISHING | — | — | — | — | |
| General | — | — | — | — | |
| Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | — | — | — | — | |
| 17 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | cum | 70 | 2,434.25 | 1,70,397.5 |
| 18 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | cum | 55.56 | 3,551.25 | 1,97,307.45 |
| WATER SUPPLY | — | — | — | — | |
| C.P.V.C. PIPES | — | — | — | — | |
| Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work | — | — | — | — | |
| 19 | 50 mm dia nominal bore | Metre | 89.74 | 762.15 | 68,395.34 |
| RAIN WATER HARVESTING & TUBEWELLS | — | — | — | — | |
| General | — | — | — | — | |
| 20 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. | cum | 756 | 1,509.8 | 11,41,408.8 |
| Schedule total | ₹3,25,30,012.98 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PCEapprovalLrtoDivreg130kmph-BLTwithEncl_compressed1.pdf
ATTACHMENT
Specialcondition-BLTHQNED.pdf
ATTACHMENT
TenderBookletNEDNEW2.pdf
ATTACHMENT
PVC-forthevalueoftheworkdoneincludingvariationinquantities._1.pdf
ATTACHMENT
JCB.pdf
ATTACHMENT
Scaffoldingusages.pdf
ATTACHMENT
RevisedApprovedlistofBrandsorMakes-30.06.2025.pdf
ATTACHMENT
Economydesignmix.pdf
ATTACHMENT
concretemixdesigntender.pdf
ATTACHMENT
BuildingConditions.PDF
ATTACHMENT
TechnicalSpecification-30-8-2024Trackwork.pdf
ATTACHMENT
SiteRecordsforensuringqualityofwork.pdf
ATTACHMENT
Sitelaboratary.pdf
ATTACHMENT
TenderBooklet1NED.pdf
ATTACHMENT
ACS1to6.pdf
ATTACHMENT
AdvanceCorrectioSlip7-10forGCC.pdf
ATTACHMENT
InstructiontoMSE.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .