NANDED DIVISION-ENGINEERING/SOUTH CENTRAL RLY
Pending
SWI-Reconditioning of Pit line no.2 & 3 at NED (drainage, water pipeline, and improvement lighting and stores). SWII- Extension of Lalwadi Pit line-1 by 3 coached and (24 coaches) along with balance work of one side catwalk for 3 coach length etc. SWIII- Construction of first floor of TLAC side building at coaching depot Nanded.
Nanded, MaharashtraLast activity 17 Apr 2026
Ireps
Financial Eval
Est
₹9.9 L
EMD
No result yet