Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Aug 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
ERDD OF IN ASSET
2021_NAVY_460337_1
COM/0994/IN ASSET/ERDD O/L-21/A
Open Tender
Marine Services
Turn-key
90 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE ROOM
17 Sept 2021
16 Jul 2021
6 Aug 2021
16 Jul 2021
5 Aug 2021
23 Jul 2021
16 Jul 2021 - 5 Aug 2021
22 Jul 2021
240 days
SOW- IN ASSET (6X2X1 MTRS) 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock - Jan 19
002 Hull Cleaning Under Water and Boot Top Area (a) HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey.
002 Hull Cleaning Above Water Area (b) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (c) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes.
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 25x25 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 50x50 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
011 Surface preparation Under Water area including Boot top area Sweep blasting on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g)7th Coat:A/F:Seaquantum Ultra(Black)-2x150microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to ST 3 standard under the suprvision of paint OEM.
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to ST 1 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out spot blasting to SA 2.5 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report. Size of eye plate- 230x550x20 mm thick plate,
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1200x350 mm mm- (08 +08 both side) in 6 mtrs length .
022 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm cylindrical type
023 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
023 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) secuing chain for vertical fenders
024 Lifting eye (a) Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
024 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
025 Securing chain Chain and D shackles for securing of twin hull of pontoons damaged/perished to be renewed (a) Securing chain 14 mm dia
025 Securing arrangment D shackles for securing of twin hull of pontoons damaged/perished to be renewed (b) D Shackles
025 Securing arrangment securing eye on manhole covers of pontoons damaged/perished to be renewed (c) D Shackles
SOW- IN ASSET (12.2X2.4X1.2 MTRS ) 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area (a) HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey.
002 Hull Cleaning Above Water Area (b) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (c) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes.
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 25x25 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 50x50 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation Under Water area including Boot top area SPOT blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
011 Surface preparation Under Water area including Boot top area weep blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red)
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g)7th Coat:A/F:Seaquantum Ultra(Black)-2x150microns
013 Surface Preparation Above Water Area Carry out surface preparation on above water area to ST 3 standard under the suprvision of paint OEM.
013 Surface Preparation Above Water Area Carry out surface preparation on above water area to ST 1 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to SA 2.5 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report. Size of eye plate- 230x550x20 mm thick plate,
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover (c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1200x350 mm mm- (08 +08 both side) in 6 mtrs length .
022 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm cylindrical type
023 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
023 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) secuing chain for vertical fenders
024 Lifting eye (a) Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
024 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
025 securing chain Chain and D shackles for securing of twin hull of pontoons damaged/perished to be renewed (a) Securing chain 14 mm dia
025 Securing arrangment D shackles for securing of twin hull of pontoons damaged/perished to be renewed (b) D Shackles
025 Securing arrangment securing eye on manhole covers of pontoons damaged/perished to be renewed (c) D Shackles
DRY DOCK AND ALLIED SERVICES WORK PACKAGE (A) Docking and undocking charges (Both Versions) Firm not to quote. Docking and Undocking will be done by Navy in Navy Permises i.e ND(V) /slipway.
(B) Dock blocks preparation & laying out as per docking plan Firm not to quote. Job will be done by Navy .
Dock hire charges for an estimated duration of 60 Days as per OCR Firm not to quote. Dry Dock facility will provided by Navy in Navy Permises i.e ND(v) /slipway.
Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period) Firm not to quote. Dry Dock facility will will provided by Navy in Navy Permises
Quote for maintenance of two in no. fire lines for the refit duration . Firm to quote.
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less Firm to quote.
Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 2000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote
QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. Firm not to quote. Services will be provided by ND(V)/QC
Patel Engineering Works Vizag
Sadhav Offshore Engineering Company
WINTECH ENGINEERING WORKS
India Maritime Services
MANIMADHAVI ENTERPRISES
SAGAR SHIP REPAIRERS AND MARINE SERVICES
ADHYANTA ENGINEERING PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .