| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance ACCEPTED |
Tender Value
Refer Docs
Closing Date
10 Sept 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMANDANT B SABARISH
COAST GUARD HEADQUARTERS NO. 1 PORBANDAR
Yearly routine on FM-200 system onboard ICGS C-161 and ICGS C-156
2022_ICG_549642_1
344/161/156/02/22-23
Single
Miscellaneous Services
Turn-key
90 days
COAST GUARD HEADQUARTERS NO. 1 PORBANDAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
12 Sept 2022
2 Sept 2022
12 Sept 2022
2 Sept 2022
10 Sept 2022
2 Sept 2022
Amount
ICGS C-161 E-035 : Major fire fighting system FM-200 (Make – Zeal Marketing Pvt. Ltd., Mumbai) yearly routine will be falling due in Sep 22. The following jobs will be carried out during routine:- (a) Remove nozzle from piping to allow any foreign material to blow clear. (b) Remove all pressure operated control from FM-200 cylinders. (c) Open distributing valve and keep open long enough cleanliness of pipe. (d) Reconnect all control heads. (e) Overhaul the control system, monitoring system and fire detection system. (f) Clean the pipe line system and carry out pressure testing of the system. (g) Weight the cylinder and recharge, if weight loss is more than 10%. (h) Clean discharge nozzles.
ICGS C-156 E-022 :Major fire fighting system FM-200 (Make – Zeal Marketing Pvt. Ltd., Mumbai) yearly routine will be falling due in Oct 22. The following jobs to be carried out during routine:- (a) Remove nozzle from piping to allow any foreign material to blow clear. (b) Remove all pressure operated control from FM-200 cylinders. (c) Open distributing valve and keep open long enough cleanliness of pipe. (d) Reconnect all control heads. (e) Overhaul the control system, monitoring system and fire detection system. (f) Clean the pipe line system and carry out pressure testing of the system. (g) Weight the cylinder and recharge, if weight loss is more than 10%. (h) Clean discharge nozzles.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .