Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC | ₹4.0 Cr Quoted ₹12.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹18.7 Cr+₹6.6 Cr (54.3%)Rejected-AOC | ₹18.7 Cr+₹6.6 Cr (54.3%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.2 Cr−₹10.0 Cr (82.1%)Rejected-AOC | ₹2.2 Cr−₹10.0 Cr (82.1%) | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
20 Sept 2019, 3:00 pmClosed
Managing Director KSFDC
Managing Director KSFDC Chalachithra Kalabhavan Vazhuthacaud Thiruvananthapuram
Request for Proposal for Selection of PROJECT MANAGEMENT CONSULTANT
2019_KSFDC_293927_1
3320/P1/19/KSFDC
Open Tender
Consultancy
Item Rate
365 days
All Kerala
Please refer Tender documents.
5 documents required · 5 mandatory
₹13,100
Yes
online
₹1.1 L
Yes
12 May 2020
17 Aug 2019
24 Sept 2019
17 Aug 2019
20 Sept 2019
17 Aug 2019
17 Aug 2019 - 7 Sept 2019
Amount
RESIDENT PERSONNEL AND LOCAL COSTS
Remuneration for Resident Professional Personnel (inclusive of all personal allowances)
Remuneration for Resident Support Personnel (inclusive of all personal allowances)
Office Rent
Office Consumables like stationery, communication etc.
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Miscellaneous Expenses
Total RESIDENT PERSONNEL AND LOCAL COSTS
POST REPORT CONSULTATIONS DURING DEFECT LIABILITY PERIOD: 2man days each of:
Project Manager - cum - Team Leader
Structural Engineer
Contract Management Specialist) cum Billing Engineer
Architectural Engineer
Electrical Engineer
Theatre Specialist
HVAC Specialist
Acoustics/AV Specialist
Total of POST REPORT CONSULTATIONS
Total of 2+4
OVERHEAD EXPENSES @..........% of (5)
Total including Overheads (5+6)
ADDITIONAL COSTS (not included in evaluation)
Domestic travel from firm’s office to the Project Office (restricted to three return economy class air fares for each Personnel)
Return journeys from Project Office to Authority’s office to attend meetings held by the Authority (provide indicative amount for three return fares)
Total of Additional Costs (8)
Egis IndiaConsultng Engineers Pvt. Ltd.
PEMS Engineering Consultants Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .