Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹4.5 CrAccepted-Finance | ₹4.5 Cr | H1 | Accepted-Finance AS PER RFP |
| 2 | H2₹4.5 Cr+₹40,240.36 (0.09%)Accepted-Finance | ₹4.5 Cr+₹40,240.36 (0.09%) | H2 | Accepted-Finance AS PER RFP |
| 3 | H3₹5.7 Cr+₹1.2 Cr (27.5%)Accepted-Finance | ₹5.7 Cr+₹1.2 Cr (27.5%) | H3 | Accepted-Finance AS PER RFP |
| 4 | H4₹6.4 Cr+₹1.9 Cr (41.5%)Accepted-Finance 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | ₹6.4 Cr+₹1.9 Cr (41.5%) | H4 | Accepted-Finance AS PER RFP |
| 5 | H5₹6.5 Cr+₹2.0 Cr (44.3%)Accepted-Finance | ₹6.5 Cr+₹2.0 Cr (44.3%) | H5 | Accepted-Finance AS PER RFP |
| Sl No | Description | Qty | Unit | TPF Engineering Pvt Ltd L15 | AICONS Engineering Pvt. Ltd. L5 | PIONEER INRA CONSULTANTS PVT. LTD. L10 | Technocrats Advisory Services Pvt. Ltd. L7 | Spectrum Techno Consultants Pvt Ltd L13 | Artefact Projects Ltd. L9 | L N MALVIYA INFRA PROJECTS PVT LTD L8 | Geo Designs and Reserch Pvt. Ltd. L6 | KAIUS CONSULTING PVT. LTD. L11 | Ishita Info Solutions Private Limited L14 | Manglam Infra & Engineering Limited L4 | EKAM Venture L3 | MSPARK Futuristics & Associates L2 | JAIMAN Construction and Consultants LLP L1 | Marc Technocrats Limited L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10.00Local Consultants | ||||||||||||||||||
| 20.00 | Remuneration for Local Staff | 1 | Nos | 6,15,62,994 ₹6,15,62,994 | 3,49,21,000 ₹3,49,21,000 | 3,79,90,000 ₹3,79,90,000 | 3,62,55,000 ₹3,62,55,000 | 3,92,92,920 ₹3,92,92,920 | 3,45,65,000 ₹3,45,65,000 | 3,39,58,000 ₹3,39,58,000 | 2,97,90,250 ₹2,97,90,250 | 3,38,25,000 ₹3,38,25,000 | 4,78,30,500 ₹4,78,30,500 | 2,84,95,000 ₹2,84,95,000 | 2,44,30,000 ₹2,44,30,000 | 2,35,20,000 ₹2,35,20,000 Lowest | 2,47,40,000 ₹2,47,40,000 | 3,72,66,000 ₹3,72,66,000 |
| 30.00 | Supporting Staff | 1 | Nos | 56,40,096 ₹56,40,096 | 57,12,000 ₹57,12,000 | 46,20,000 ₹46,20,000 Lowest | 75,60,000 ₹75,60,000 | 94,92,000 ₹94,92,000 | 84,00,000 ₹84,00,000 | 67,20,000 ₹67,20,000 | 60,06,000 ₹60,06,000 | 82,32,000 ₹82,32,000 | 74,76,000 ₹74,76,000 | 82,32,000 ₹82,32,000 | 79,80,000 ₹79,80,000 | 65,10,000 ₹65,10,000 | 52,08,000 ₹52,08,000 | 96,09,600 ₹96,09,600 |
| 40.00 | Transportation | 1 | Nos | 98,40,000 ₹98,40,000 | 91,80,000 ₹91,80,000 | 91,80,000 ₹91,80,000 | 87,60,000 ₹87,60,000 | 1,26,00,000 ₹1,26,00,000 | 93,00,000 ₹93,00,000 | 1,01,40,000 ₹1,01,40,000 | 1,19,85,000 ₹1,19,85,000 | 1,28,16,000 ₹1,28,16,000 | 1,21,80,000 ₹1,21,80,000 | 86,40,000 ₹86,40,000 | 96,00,000 ₹96,00,000 | 39,96,000 ₹39,96,000 Lowest | 47,40,000 ₹47,40,000 | 1,20,60,000 ₹1,20,60,000 |
| 50.00 | Duty Travel to Site | 1 | Nos | 2,00,000 ₹2,00,000 | 10,000 ₹10,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 8,000 ₹8,000 | 3,00,000 ₹3,00,000 | 40,000 ₹40,000 | 65,000 ₹65,000 | 80,000 ₹80,000 | 60,000 ₹60,000 | 2,000 ₹2,000 | 3,00,000 ₹3,00,000 | 200 ₹200 Lowest | 20,000 ₹20,000 | 2,000 ₹2,000 |
| 60.00 | Office Rent | 1 | Nos | 13,44,000 ₹13,44,000 Lowest | 21,00,000 ₹21,00,000 | 29,40,000 ₹29,40,000 | 21,00,000 ₹21,00,000 | 33,60,000 ₹33,60,000 | 25,20,000 ₹25,20,000 | 33,60,000 ₹33,60,000 | 26,25,000 ₹26,25,000 | 21,00,000 ₹21,00,000 | 33,60,000 ₹33,60,000 | 37,80,000 ₹37,80,000 | 21,00,000 ₹21,00,000 | 15,12,000 ₹15,12,000 | 16,80,000 ₹16,80,000 | 37,80,000 ₹37,80,000 |
| 70.00 | Office Supplies, Utilities and Communication | 1 | Nos | 8,40,000 ₹8,40,000 | 5,04,000 ₹5,04,000 | 5,04,000 ₹5,04,000 | 1,68,000 ₹1,68,000 | 13,44,000 ₹13,44,000 | 2,94,000 ₹2,94,000 | 10,08,000 ₹10,08,000 | 21,42,000 ₹21,42,000 | 6,72,000 ₹6,72,000 | 10,08,000 ₹10,08,000 | - | 16,80,000 ₹16,80,000 | 3,36,000 ₹3,36,000 | 3,84,468 ₹3,84,468 | 54,600 ₹54,600 Lowest |
| 80.00 | Office Furniture and Equipment (Rental) | 1 | Nos | 10,08,000 ₹10,08,000 | 2,52,000 ₹2,52,000 | 8,40,000 ₹8,40,000 | 2,10,000 ₹2,10,000 | 9,24,000 ₹9,24,000 | 6,72,000 ₹6,72,000 | 8,40,000 ₹8,40,000 | 3,86,400 ₹3,86,400 | 4,20,000 ₹4,20,000 | 12,60,000 ₹12,60,000 | 12,60,000 ₹12,60,000 | 8,40,000 ₹8,40,000 | 3,36,000 ₹3,36,000 | 1,13,400 ₹1,13,400 Lowest | 12,60,000 ₹12,60,000 |
| 90.00 | Reports and Document Printing | 1 | Nos | 7,95,000 ₹7,95,000 | 2,06,500 ₹2,06,500 | 88,500 ₹88,500 | 1,47,500 ₹1,47,500 | 59,080 ₹59,080 | 34,400 ₹34,400 | 1,47,500 ₹1,47,500 | 3,02,250 ₹3,02,250 | 5,47,000 ₹5,47,000 | 97,100 ₹97,100 | 33,900 ₹33,900 | 2,95,000 ₹2,95,000 | 14,750 ₹14,750 Lowest | 1,47,480 ₹1,47,480 | 29,450 ₹29,450 |
| 100.00 | Road and Survey Equipment | 1 | Nos | 33,22,800 ₹33,22,800 | 10,15,000 ₹10,15,000 | 15,00,000 ₹15,00,000 | 3,10,000 ₹3,10,000 | 19,20,000 ₹19,20,000 | 11,85,000 ₹11,85,000 | 10,25,000 ₹10,25,000 | 7,10,000 ₹7,10,000 | 1,75,000 ₹1,75,000 | 22,00,000 ₹22,00,000 | 23,50,000 ₹23,50,000 | 2,76,900 ₹2,76,900 | 8,60,000 ₹8,60,000 | 17,500 ₹17,500 Lowest | 39,000 ₹39,000 |
Tender Value
Refer Docs
Closing Date
16 Aug 2025, 6:00 pmClosed
Regional Officer
MoRTH , Regional Office, Gandhinagar
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane with PS Idar-Badoli bypass section from Design chainage km 81.300 to 95.500 of NH-168G in the state of Gujarat ,Total Length 14.2 Km, on EPC mode
2025_MoRTH_866454_1
RW- AE -2025-26-NH-168G-Pkg-II
Open Tender
Consultancy
EPC Contract
730 days
Idar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Bharatkosh
Exempted
Regional Office, Gandhinagar
29 May 2026
27 Jun 2025
18 Aug 2025
27 Jun 2025
16 Aug 2025
18 Jul 2025
11 Jul 2025
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_910882.xls
BOQ • 0.51 MB
RFP.pdf
Tender Documents • 4.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .