Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
23 Nov 2026, 2:15 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Single Packet
Normal Tender
No
Not Applicable
Total Value Wise
Lowest to Highest
Please see item details
Not Applicable
120 days
Expenditure
General
P1
2 conditions · 2 needing a document upload
Please refer Clause 17.0 of Eligibility Criteria of attached document named Specification. No.ICF/M&P/DGSet/750 KVA/2023.
As per Public procurement (Preference to Make in India) order 2017, as amended, tendered item is to be procured from Class-I and class-II Local Suppliers and the vendors who do not qualify to be Class-I and class-II Local Suppliers should not quote in the tender as their offers shall not be considered for any ordering.
60 conditions · 4 needing a document upload
In case of indigenous bidders, whether you are Large scale Industry or consortia of MSEs formed by NSIC, if yes, have you indicated quantum of sub contracts given to Micro and Small Enterprises (in percent of order value)?
Have you gone through the Eligibility Criteria and submitted all the documents mentioned therein?
Have you submitted the EMD or claimed exemption duly uploading documentary evidence in support of your claim along with Bid securing declaration as per clause 6.1 of section-I of Instructions to Tenderers of ICF Bid Document.
Have you furnished tender specific letter of authority (if manufacturer has not quoted directly) to bid on behalf of manufacturer as per Annexure-II of ICF bid document.
Have you confirmed for compliance of Public Procurement orders of Department of Expenditure regarding countries sharing land border with India?
Have you submitted the details of location(s) at which local value addition is made/proposed?
In case of non-local/class-II suppliers, have you submitted road map for setting up manufacturing facilities for tendered item along with the offer?(This is applicable only for items which are not restricted to class-I local suppliers).
Have you submitted self-declaration with respect to non debarment under any provisions of DPIIT rules?
Have you submitted translated copy into English, for all documents in language other than English and all such documents should be signed by the authorised translator and notarized in India?
Have you submitted declaration for passing on the input tax credit as per para 2.8 and 2.9 of section-II of ICF Bid Document.
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers?
Have you furnished the statement of deviations (preferably Nil)?
Have you furnished the statement of Equipment & Quality Control?
Have you kept your offer valid for the validity period as mentioned in NIT header?
The bidders should quote the applicable HSN codes and it is the responsibility of the tenderer to quote the correct HSN code and upload the document.
Goods & Services Tax (GST): Will be applicable as per Clause 2.0 and all sub clauses of Section-II of ICF Bid Document.
Passing the benefits of ITC: I hereby confirm following: We hereby declare that in quoting the above price, we have taken into account the full effect of Input Tax Credit available under GST. We, further agree to pass on any financial gain/benefit as may become available in future in respect of all the input tax credit on the date of supply by way of reduction in price and advise the purchaser accordingly. We also undertake that we are aware of the provisions of section 171 of the CGST Act and consequences thereof if we fail to comply with the same.
Public Procurement (Preference to Make in India) policy is applicable as per Clause 16 of Section-I of ICF Bid Document. The procurement shall be done in accordance with the extant instruction of DPIIT (Department of Promotion of Industry and Internal Trade) for Make in India policy.
Guarantee/Warranty : : Warranty starts on the date of commissioning , Warranty period shall be 24 months from the date of commissioning/ Specification whichever is higher. Refer clause no. 12.0 of CCSM&P condition for warranty.
Please submit the details of the location at which the local value addition is being made
(i) In case of MSE firm willing to claim the benefits under Public Procurement Policy (Preference to MSE) order 2012, the firm should upload with their offer, the proof of their being MSE registered with the agency mentioned in clause 13.1 of section-I of ICF Bid document, failing which such offers will not be liable for consideration of benefits detailed in para 13.3 of section-I of ICF Bid document. (ii) As per Gazette notification no. S.O.4926(E) dated 18.10.2022 amending notification no. S.O.2119(E) dated 26.06.2020 circulated vide Railway Board letter no. 2020/RS(G)/363/1 dated 03.11.2022 regarding re-classification of enterprises and Udyam registration, "In case of an upward change in terms of plant and machinery or equipment or turnover or both, and consequent reclassification, an enterprise shall continue to avail of all non-tax benefits of the category it was in before the re- classification, for a period of three years from the date of such upward change." In such cases, the tenderer claiming such benefits shall submit necessary documentary evidence along with offer. (iii) Tenderers shall upload Udyam Registration detail showing that the enterprise is owned by Scheduled Castes (SC)/ Scheduled Tribes (ST)/ women entrepreneurs to claim the benefit under this subclassification.
1. Regarding EMD, please refer to clause 6.1 of section I Instructions to tenderer of ICF Bid Document attached to the tender. Tenderers seeking exemption from payment of EMD must upload the requisite documentary evidence in support of their claim for exemption from payment of EMD along with the offer. 2.Traders/Distributors/sole agent/works contract are not exempted from payment of EMD as they are excluded from the purview of the MSE policy . 3. In reference to conditions No.6.1 (vi) of section I of ICF Bid document, the exemption of EMD is applicable only to the vendors having current and valid registration with PCMM of any zonal Railways/ Production unit for trade group 6 5 7 9 . Firm should submit valid registration certificate for proof.
The tenderers shall indicate the details of their Jurisdictional Assessing Officers (Designation, address & email id) for GST.
Purchaser reserves the right to change the inspection agency or to accept the material based on WTC at post contract stage, in case of extreme emergencies urgencies.
The tenderer has to submit the technical printed literature of the equipment in original describing all the technical and specification details of the equipment along with the offer. The tenderer is also required to submit at least three copies of the working manual, spare parts catalogue, maintenance manual, trouble- shooting guide, operation manual of the machines and the entire electrical circuit diagram including PCB circuits of the equipment along with the consignment.
General Arrangement Drawing: Supplier shall submit General Arrangement drawing of equipment and get approval of ICF before the supply. As per clause 3.0 of GA drawing in CCSM&P attached.
It will be presumed that the firms who have submitted the e-bid have gone through and accepted all the terms and conditions of tender, until and unless firms specify the deviations from those conditions and so indicated specifically, under the headings - "Technical Deviation Statement" and "Commercial Deviation Statements". And if space available is not adequate, tenderers can upload a Statement of Deviations and a reference of uploaded deviation statement shall be given in "Technical or Commercial Deviation Statement". If there is any contradiction between any techno commercial terms and conditions quoted in e-offer and documents attached along with the e-offer, the terms & conditions quoted in e-offer will prevail over that of quoted in attached documents. Tenderers in their own interest are advised not to quote any techno commercial terms & conditions in attached documents.
Firm should quote separately for 5 years comprehensive annual maintenance contract value year wise after warranty period without fail. Break-up of CAMC charges year wise shall be furnished. Evaluation and inter se ranking shall be based on all inclusive rate of supply, installation, commissioning and CAMC charges put together. However CAMC charge will not be part of purchase order. CAMC charges will be mentioned in remarks column of purchase order. If required, after the end of warranty period user department will enter to CAMC agreement with firm at pre defined CAMC charges which are mentioned in remarks column of purchase order.
In the attached document with name of "CALCULATION FOR CAMC CHARGES" AMC to be read as CAMC (Comprehensive annual maintenance contract) in this entire document.
Clause-wise comments for all the clauses of, both the Technical Specification shall be given without fail during Bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 condition
Validity of Offer: No deviation from the offer validity period stipulated in the NIT header of this tender document is permitted. For additional conditions please refer Clause 12.0 of Section -I of ICF Bid Document.
1 location across Tamil Nadu · 1 Numbers total
DG SET 750 KVA As per attached ICF Specification no ICF/M&P/DG Set/750 KVA/2023
01245075C~ICF
01245075C
Open - Indigenous
Mixed (Goods/Service/AMC)
Tamil Nadu
₹0
₹2.4 L
29 Oct 2026
29 Oct 2026
2 items · 1 Numbers total
DG SET 750 KVA As per attached ICF Specification no ICF/M&P/DG Set/750 KVA/2023 ]
| Delivery Location | State | Quantity |
|---|---|---|
| Shell Depot/ICF,Chennai, ICF | Tamil Nadu | 1.00 Numbers |
| Total | 1 Numbers | |
CHARGES FOR COMPREHENSIVE CAMC FOR 5 YEARS AFTER EXPIRY OF WARRANTY PERIOD O F TWO YEAR FROM THE DATE OF COMMISSIONING. [ Warranty Period: 2 years, AMC Period: 5 years, R ate of Discounting: 10 % ] ]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5937024.pdf
ATTACHMENT
5937219.pdf
ATTACHMENT
5937305.pdf
ATTACHMENT
4826308.pdf
ATTACHMENT
4826304.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .