| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Shortfall of documents |
Tender Value
₹4.3 L
EMD Value
₹9,000
Closing Date
3 Oct 2022, 3:00 pmClosed
Dy. Director General VTS Gandhidham
Plot no. 17 Sector 8 Gandhidham
Providing and fixing of new light trestle tower (6.00mtr) on top surface of VTS tower at Koteshwar/ Chhachhi/ Navinal/ Balachadi/ Chudeshwar and MCC Kandla VTS Station.
2022_DGLL_711946_1
CMDVTS-03001(01)/1/2020
Open Tender
Civil Works
Works
60 days
All Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,000
Yes
Deep Bhavan Gandhidham
3 Feb 2023
13 Sept 2022
4 Oct 2022
13 Sept 2022
3 Oct 2022
13 Sept 2022
29 Sept 2022
Amount
Dismantling steel work in built up sections in angles, tees, flats and channels, all gusset plates, bolts, nuts, cutting rivets, welding, dismembering and stacking within 50 metres lead. including the cost of all materials, labors, safety belt, scaffolding, tools & plants and all other charges etc. Complete.(265.28 Kg for each Trestle = 265.28 x 6= 1591.68 Kg)
Lifting from 60Meter height of VTS Tower including shifting, taking ,staking on Ground at site including the cost of all materials, labors, safety belt, scaffolding, tools & plants and all other charges etc. Complete. (1 Job for each Trestle = 1.00 x 6 = 6 Job)
Buy back Buy of Dismentaling of RCC debridge 265.28 Kg @ 60% = 159.17 Kg of total Quantity (159.17 Kg for each Trestle = 159.17 x 6= 955.02 Kg)
Structural steel (Angle size 50mm x 50mm x6mm) work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel In gratings, frames, guard bar, ladder, railings, brackets, gates and similar worksincluding the cost of all materials, labors, safety belt, scaffolding, tools & plants and all other charges etc. Complete. (201.66 Kg for each Trestle = 201.66 x 6= 1209.96Kg)(100 micron Galvanized material)
Structural Steel (Plate size 10mm thick & 8mm thick ) work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including the cost of all materials, labors, safety belt, scaffolding, tools & plants and all other charges etc. Complete. plants (63.63 Kg for each Trestle = 63.63 x 6= 381.78 Kg)(100 micron Galvanized material)
Providing and fixing G.I. pipes on the top of trestle tower for supporting of Light complete with G.I. fittings and clamps, i/c cutting and making good the walls etc.40mm dia including the cost of all materials, labors, safety belt, scaffolding, tools & plants and all other charges etc. Complete. plants (2.00 Rmt for each Trestle = 2.00 x 6= 12.00 Rmt)
Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including the cost of all materials, labors, safety belt, scaffolding, tools & plants and all other charges etc. Complete. plants (11.89 Sqm for each Trestle = 11.89 x 6= 71.34 Sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work on steel surface including the cost of all materials, labours,safety belt, scaffolding,tools & plants and all other charges etc.complete. (11.89 Sqm for each Trestle = 11.89 x 6= 71.34 Sqm)
Supplying and fixing/erecting with lighting arrester uninstall and install at the all station on top of arrester trestle light tower on the top surface of VTS tower, drilling and fixing with nuts and bolts and cover-up a directed & as described as per condition at site including the cost of all materials, labours, safety belt, scaffolding, tools & plants and all other charges etc. Complete. (1 Job for each Trestle = 1.00 x 6 = 6 Job)
Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including water proofing , hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20mm nominal size) (1 Job for each Trestle = 1.00 x 6 = 6 Job)
KK ENGINEERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .