Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance 5 29 52 THOKADA 3RD LANE AUTONAGAR VISAKHAPATNAM ANDHRA PRADESH 530012 UDYAM AP 10 0008246 | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | ₹2.4 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Xtechs Testings Private Limited L1 |
|---|---|---|---|---|
| 0.00Stress Relieving of New Fire Pump Foundations Stress relieving of newly fabricated Fire pump foundations shall be carried out to remove residual stresses developed during welding and fabrication. The work includes controlled heating, soaking, and cooling as per applicable standards The contractor shall ensure uniform heating up to 620–640°C (for MS,ISO2062 gradeB) with controlled heating and cooling rates, maintaining required soaking time based on thickness(22 mm). Temperature shall be monitored using calibrated thermocouples, and complete records shall be submitted. All necessary equipment, insulation, and skilled manpower shall be arranged by the contractor, and final acceptance will be based on satisfactory inspection and submission of temperature charts. | ||||
| 1.00 | Stress reliening of new fire man pump foundations as
per Annexure is enclosed | 6 | NOS | 39,510.5 ₹2,37,063 Lowest |
Tender Value
Refer Docs
Closing Date
8 May 2026, 3:30 pmClosed
M(SRC-OS)
HSL
STRESS RELIEVING OF NEW FIRE PUMP FOUNDATIONS ON INS PROJECT
2026_HSL_99437_1
SR COMPLEX/PRODUCTION/OUT SOURCEREQUISITION/2026/63
Open Tender
Miscellaneous Services
Service
5 days
VISAKHAPATNAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
8 May 2026
29 Apr 2026
8 May 2026
29 Apr 2026
8 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Stress Relieving of New Fire Pump Foundations
Stress relieving of newly fabricated Fire pump foundations shall be carried out to remove residual stresses developed during welding and
fabrication. The work includes controlled heating, soaking, and cooling as per applicable standards
The contractor shall ensure uniform heating up to 620–640°C (for MS,ISO2062 gradeB) with controlled heating and cooling rates, maintaining
required soaking time based on thickness(22 mm). Temperature shall be monitored using calibrated thermocouples, and complete records shall be
submitted.
All necessary equipment, insulation, and skilled manpower shall be arranged by the contractor, and final acceptance will be based on satisfactory inspection and submission of temperature charts. | - | - | - | - |
| 1 | Stress reliening of new fire man pump foundations as
per Annexure is enclosed | 6 | NOS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tender_documents.rar
Tender Documents • 0.53 MB
BOQ_109026.xls
BOQ • 0.24 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.17 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.17 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.17 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .