Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.5 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹19.5 L+₹3.0 L (18.2%)Accepted-Finance E 60 INDUSTRIAL AREA HARIDWAR 249401 | HARIDWAR | HARIDWAR | UTTARAKHAND | 249401 | 2 | Accepted-Finance L2 | |
| 3 | 3₹21.7 L+₹5.2 L (31.3%)Accepted-Finance 1759 SECOND FLOOR SECTOR 28 FARIDABAD 121008 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121008 | 3 | Accepted-Finance L3 |
Tender Value
₹25.9 L
Closing Date
27 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (EM)(SHP), Guptkashi
Executive Engineer (EM) SHP, UJVN Ltd., Kund Guptkashi- 246439
Repair and maintenance of Unit-II and other equipment of Kaliganga-I SHP (4MW) located in Tehsil Ukhimath, District- Rudraprayag, Uttarakhand
2021_UJVN_39326_1
03/EE(EM-SHP)/KG-I/21-22
Open Tender
Electrical Works
Item Wise
90 days
KALIGANGA
As per Tender document
2 documents required · 2 mandatory
₹2,360
GENERAL MANAGER (SHP)
Exempted
2 May 2022
2 Dec 2021
30 Dec 2021
3 Dec 2021
27 Dec 2021
10 Dec 2021
120 days
Butterfly Valve Assembly:- Dismantling of complete BFV, fixing of dummy plates on penstock. Replacement of BFV disc seal, repairing of SS seal locking ring, drilling and tapping, replacement of damaged SS hardware, adjustment of seal, dry testing BFV complete in all respect including all men, material & all T&P required for proper completion of work.
Bypass Valve Assembly: Dismantling of complete Bypass Valve assembly, fixing of dummy plates, repairing of hydraulic bypass valve and mechanical gate valve, adjustment of seating area and dry testing of bypass assembly complete in all respect including all men, material & all T&P required for proper completion of work.
Top cover: Dismantling, removal of damaged portion by deep grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS309MO welding rod on labyrinth ring portion, replacement of damaged grub screw, filling of special material on grub screw as per OEM drawing, complete machining of welded portion, testing complete in all respect including all men, material & all T&P required for proper completion of work.
Bottom cover: Dismantling, removal of damaged portion by deep grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS309MO welding rod on labyrinth ring portion, replacement of damaged grub screw, filling of special material on grub screw as per OEM drawing, complete machining of welded portion, testing complete in all respect including all men, material & all T&P required for proper completion of work.
Guide Vanes: Cleaning, adjustment, replacement of damaged O-rings at housing area, cleaning, checking of housing cover bush at driving and non driving end. Proper setting of all 16 no guide vanes according to the dimension in drawing, link, liver drilling, tapping, replacement of damaged dowel pin, shear pin, replacement of damaged eccentric pin, damaged nut of regulating ring, proper greasing, proper setting of regulating with GV link & liver assembly, final adjustment, dry testing and operation complete in all respect including all men, material & all T&P required for proper completion of work.
Shaft Seal Assembly: Complete dismantling of shaft seal assembly, inspection of damaged labyrinth ring seal, repair and maintenance of shaft seal assembly and replacement of damaged seal, reassembly, arresting of leakage to minimum, testing complete in all respect including all men, material & all T&P required for proper completion of work.
Balancing Pipe System: Complete repair and maintenance of balancing pipe by welding grinding, replacement of damaged hardware complete in all respect including all men, material & all T&P required for proper completion of work.
DE & NDE bearing: Complete dismantling of DE & NDE bearing top housing and inspection of Bearing thrust pads, counter thrust pads, cleaning, scrapping, adjustment and blue matching of pads, complete in all respect including all men, material & all T&P required for proper completion of work.
Synchronous Generator: Complete repair and maintenance of Synchronous Generator braking system. Supply & replacement of brake pads, complete in all respect including all men, material & all T&P required for proper completion of work
Cooling water System: Supply & fixing of cooling water Standby-I & II pump seal and arresting of leakage to minimum, complete in all respect including all men, material & all T&P required for proper completion of work
Complete reassembly of turbine components, replacements of all dummy plug of turbine leveling and alignment of complete turbine and generator assembly, testing and commissioning of machine.
HT & LT Breaker: General Servicing, Repairing, Calibration and testing of 3 Nos HT Breaker (SF6) make ABB and 3 nos LT ACB breaker make Schneider by OEM Authorized person complete in all respect including all men, material & all T&P required for proper completion of work.
Painting by One coat red oxide primer & two coats Synthetic enamel paint of M/S Asian Paints/Berger on outer surfaces of Cooling water filters, cooling water pipe line, Turbine, MIV, Servo Motor, oil pipe line & Penstock pipe inside power house.
GOGOAL HYDRO PVT. LTD.
VM POWER AND INFRATECH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .