Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L1 | Accepted-Finance Lowest bid (L1) |
| 2 | L2₹1.8 CrRejected-Finance | ₹1.8 Cr | L2 | Rejected-Finance Highest Bid (L2) |
| Sl No | Description | Qty | Unit | CARITAS INFRA CONSULTING PVT. LTD. L1 | Saptagon Asia Private Limited L2 |
|---|---|---|---|---|---|
| 1.00Preliminary and Detailed Survey work including Conducting Topographic Survey, Geotech Survey, Geological Survey and Hydrological Survey with marking every survey point in ground and Fixing of Bench Marks. Construction of Level Pillars, Reference Pillars and Back Cutting Pillars in every 25m interval with marking, including construction of 0.60m wide trace cut. Preparation Road Alignment in 2 options with all required detail in Alignment sheet and also provide photographs with the coordinates of the alignment at every 100 meter distance. Also preparation of L-section and X- section with all detail (The plan will include road profile, road design data, Muck Disposal Places and other essential requirements.). Also, collection of all the data like Soil investigation data, Geological data, Hydrological data, Traffic Assessment, Existing roads, SSB BOP’s (Existing and Future Proposed), Electric, Water supply and Telephone lines etc., After collection of all data Designing of Road and all Bridges and Culverts (i/c site selection, type of bridge, span arrangement etc.) as per MORT&H Standards. After making all the Designing & Drawings of road, bridges and culverts they will also have to be Vetted by IIT and Preparation of D.P.R. (Detailed Project Report) up to DBM/ BC surface. Also i/c Land acquisition proposal with edge demarcation (Forest and Nap Land) and proposal for Utility shifting.The start point of this project ( Baltari to Jauljibi) will be start point of the existing Baltari to Jauljibi single lane motor road and the end point will be connecting to NH-9 near SSB camp Jauljibi (village Jogura) ,keeping alignment under 150m aerial distance from indo nepal international Border. All the works shall be carried out as per TOR conditions and as per direction of Engineer in charge. | |||||
| 1.01 | For Two Lane Motor Road Work i/c all complete as per above (1) | 36 | Km | 3,52,666.63 ₹1.3 Cr | 1,44,445 ₹52.0 L |
| 1.02 | For Two Lane Motor Bridge Work i/c all complete as per above (1) | 504 | Metre | 7,142.86 ₹36.0 L | 25,000 ₹1.3 Cr |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
17 Nov 2025, 1:00 pmClosed
SE 3rd Circle PWD Pithoragarh
SE 3rd Circle PWD Pithoragarh
Consultancy Services for Preparing of D.P.R. for Construction of Two lane motor road including Two lane Bridges from Baltari to Jouljivi at Indo-Nepal border in Uttarakhand State (App. Length 36.00 Kms)
2025_pwd_88593_1
4656/13PIU-03/2025 Dated 30/10/2025
Open Tender
Consultancy
240 days
Champawat
As per rfp documents
3 documents required · 3 mandatory
₹4,720
EE PIU PWD Thuligarh
₹2.9 L
SE 3rd Circle PWD Pithoragarh
7 Jan 2026
1 Nov 2025
17 Nov 2025
1 Nov 2025
17 Nov 2025
1 Nov 2025
4 Nov 2025
Amount
For Two Lane Motor Road Work i/c all complete as per above (1)
For Two Lane Motor Bridge Work i/c all complete as per above (1)
Saptagon Asia Private Limited (BID ID -406544)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.02 MB
Tender Documents
Tender Documents • 2.72 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid