| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr Quoted ₹2.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹3.0 Cr+₹18.5 L (6.54%)Rejected-Finance SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹3.0 Cr+₹18.5 L (6.54%) | L2 | Rejected-Finance Second Lowest |
| 3 | L3₹3.1 Cr+₹30.9 L (10.9%)Rejected-Finance | ₹3.1 Cr+₹30.9 L (10.9%) | L3 | Rejected-Finance Third Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹2.8 Cr
EMD Value
₹5.7 L
Closing Date
23 Feb 2023, 5:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER CONSTRUCTION CIRCLE UTTARAKHAND PEYAJAL NIGAM GOPESHWAR
Munna Deval Bastha Thati Badma Dovaliya and Jakhnyal Gaon Water Supply Scheme of Block Jakholi
2023_MDPEY_54871_1
150/Lekha-05/68 Dated 07.02.2023
Open Tender
Civil Works
Item Rate
270 days
Block Jakholi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer Construction Division UKPJN
₹5.7 L
Rudraprayag
14 Sept 2023
10 Feb 2023
25 Feb 2023
10 Feb 2023
23 Feb 2023
13 Feb 2023
13 Feb 2023
Amount
Munna Deval Solar Pumping W/s Scheme of Block Jakholi:- SOURCE WORKS
Construction of Intake chamber (submitted design should be as per type design subject to site condition) to fulfill the requierment of water demand including Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
Construction of Roughening Filter with filling of supporting & filter media including all materials, cartage labour, T&P etc. required for proper completion of work
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MSERW, Jointing by electric welding process with proper grade of eletrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.
From MPS to Top Cwr. MS ERW Pipe 40 mm Dia 3.2 mm Thickness
Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting with existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc complete and make proper functioning, confirming to IS:1239 at site of works. On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.
15 mm dia - GI (M)
20 mm dia - GI (M)
25 mm dia - GI (M)
32 mm dia - GI (M)
40 mm dia - GI (M)
Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
20mm dia
25mm dia
32mm dia
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
Soil mixed with boulder (SMB)
Medium Rock (MR)
Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20 mm dia
40mm dia
Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(0.90x0.90x1.0)
Constructing Wheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
32mm dia (CI Air Valve)
Supply of all materials, labour, T & P etc. and Construction of size Air Valve Chamber as per type design complete(0.90x0.90x1.0)
ACTARIS Bulk Water Meters model Woltex Class B magnetically coupled pre equipped for remote reading
40 mm dia
Supply of all materials, labour, T&P etc. and construction of (0.90x0.90x1.0)m size Bulk Water Meter Chamber with FPS bricks
Supply of all materials, labour, T & P etc. and Construction of R.C.C Anchor Block as per type design complete
Makig 2 M wide Briddle path for rising main including hill side cutting and coolie walling of all materials, labour, T & P etc.
Painting of API Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm)
40 mm dia
Protection Work as per actual
Excavation for foundation in Soil mixed with boulders
RR Dry including supply of all materials, labour, T&P etc. complete
Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation, 0.60 M wide appron with 15 cm PC drain, required sluice valve chamber, MS manhole with locking arrangement, two coat snowcem/distemper/painting including wall writing as per instructions given by E'ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc, complete. (Cap. in KL)
Supply cartage and fixing of Bucket type chlorinator of 25 Liter capacity at top of service raservoirs.
Supply, Cartage of all materials, labours, T&P, etc complete making of ferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per instruction given by Engineer-In-charge.
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:
Provision of 1.5 m high Boundary Wall in brick masonry including supply of all materials, labour, T&P etc. complete
Provision of Barbed Wire Fencing through angle iron posts around the water works site
Provision of M.S. Iron Gate with Pillars of following sizes complete
3.6 m wide
Provision ofPannel Room 1.5 x1.5x2.0 sizes complete
Supply & Fixing of solar Submersible Pump, Control Panel, Solar Panels, wiring, automization and installation including supply of all materials,labour, T&P etc complete as per latest specification and direction as per engineer in charge.
MPS to Top CWR ( 50 LPM discharge and 167 m head)
Solar panel 335 WP x 16 = 5360 watt with GI structure
Control Panel/VFD panel hybrid controller (solar+Grid)
Complete Wiring of all the above system
Earthing of above system
Installation of all the above system
Construction of of electrical Pole and Grouting etc including supply of all materials,labour, T&P etc. complete.
Bastha W/s Scheme of Block Jakholi
SOURCE WORKS
Survey, design and Construction of Intake chamber (submitted design should be as per type design subject to site condition) to fulfill the requierment of water demand including Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
Construction of RCC Gadhera tapping arrangement i.e., 4m wide Cross wall Boulder Filled Gallery with Intake chamber to fulfill the requierment of water demand including Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge.
Construction of Extra length R.C.C Cross wall including supply of all materials, labour, T&P etc. required for proper completion of work
Construction of Roughening Filter with filling of supporting & filter media including all materials, cartage labour, T&P etc. required for proper completion of work
Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting with existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc complete and make proper functioning, confirming to IS:1239 at site of works. On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.
15 mm dia - GI (M)
20 mm dia - GI (M)
25 mm dia - GI (M)
32 mm dia - GI (M)
Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
15mm dia
20mm dia
25mm dia
32mm dia
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
Soil mixed with boulder (SMB)
Medium Rock (MR)
Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20mm dia
25mm dia
32mm dia
Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20mm dia (CI Air Valve)
Constructing Wheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Constructing masonry Air Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Subsoil Investigation, drawing, design and construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation, 0.60 M wide appron with 15 cm PC drain, required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome, MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net, two coat snowcem/distemper/painting including wall writing as per instructions given by E'ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc, complete. (Cap. in KL)
Supply cartage and fixing of Bucket type chlorinator of 25 Liter capacity at top of service raservoirs.
Supply, Cartage of all materials, labours, T&P, etc complete making of ferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per instruction given by Engineer-In-charge.
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
Thati Badma W/s Scheme of Block Jakholi
SOURCE WORKS
Construction of Intake chamber to fulfill the requierment of water demand including Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
Survey, design and Construction of Roughening Filter with filling of supporting & filter media (submitted design should be as per type design subject to site condition) including all materials, cartage labour, T&P etc. required for proper completion of work
Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting with existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc complete and make proper functioning, confirming to IS:1239 at site of works. On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.
15 mm dia - GI (M)
20 mm dia - GI (M)
25 mm dia - GI (M)
32 mm dia - GI (M)
40 mm dia - GI (M)
50 mm dia - GI (M)
Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper completion of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
20mm dia
25mm dia
32mm dia
40mm dia
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
Soil mixed with boulder (SMB)
Medium Rock (MR)
Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20 mm dia
25mm dia
32mm dia
40 mm dia
Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20mm dia (CI Air Valve)
Constructing Wheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Constructing masonry Air Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation, 0.60 M wide appron with 15 cm PC drain, required sluice valve chamber, MS manhole with locking arrangement, two coat snowcem/distemper/painting including wall writing as per instructions given by E'ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc, complete. (Cap. in KL)
Supply cartage and fixing of Bucket type chlorinator of 25 Liter capacity at top of service raservoirs.
Supply, Cartage of all materials, labours, T&P, etc complete making of ferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per instruction given by Engineer-In-charge.
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
Dovaliya W/s Scheme of Block Jakholi
SOURCE WORKS
Survey, design and Construction of Intake chamber to fulfill the requierment of water demand including Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
Construction of Roughening Filter with filling of supporting & filter media including all materials, cartage labour, T&P etc. required for proper completion of work
supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting with existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc complete and make proper functioning, confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of supply main & distribution main for checking of thickness of pipe before ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
15mm dia
20mm dia
25mm dia
32 mm dia
40 mm dia
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
Soil mixed with boulder (SMB)
Medium Rock (MR)
Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
15 mm dia
20 mm dia
25 mm dia
32 mm dia
Supply and fixing Wheel Valve/ Air Valve of the following fittings including cartage of materials, labour, T&P etc. complete
20mm dia
25mm dia
32mm dia
C.I. Air valve (Screwed) 20mm
Supply of all materials, labour, T & P etc. and Construction of Sluice Valve / Scour Valve Chamber as per type design complete (Size 0.6x0.6x0.6 m)
Supply of all materials, labour, T & P etc. and Construction of Air Valve Chamber as per type design complete(Size 0.6x0.6x0.6 m)
construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation, 0.60 M wide appron with 15 cm PC drain, required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome, MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net, two coat snowcem/distemper/painting including wall writing as per instructions given by E'ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc, complete. (Cap. in KL)
Supply and fixing of Bucket type chlorinator of 25 Liter capacity at top of service raservoirs.
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:
Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers from existing w/s scheme including all material, labour, T&P etc. complete excluding water meter & pipe as per instruction given by Engineer - In-charge.
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
Jakhnyal Gaon W/s Scheme of Block Jakholi
SOURCE WORKS
Construction of Intake chamber to fulfill the requierment of water demand including Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
Survey, design and Construction of Roughening Filter with filling of supporting & filter media (submitted design should be as per type design subject to site condition) including all materials, cartage labour, T&P etc. required for proper completion of work
Supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting with existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc complete and make proper functioning, confirming to IS:1239 at site of works. On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.
15 mm dia - GI (M)
20 mm dia - GI (M)
25 mm dia - GI (M)
32 mm dia - GI (M)
Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper completion of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
15 mm dia
20 mm dia
25 mm dia
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
Soil mixed with boulder (SMB)
Medium Rock (MR)
Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20 mm dia
25mm dia
32 mm dia
Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
20mm dia (CI Air Valve)
Constructing Wheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Constructing masonry Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation, 0.60 M wide appron with 15 cm PC drain, required sluice valve chamber, MS manhole with locking arrangement, two coat snowcem/distemper/painting including wall writing as per instructions given by E'ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc, complete. (Cap. in KL)
Supply cartage and fixing of Bucket type chlorinator of 25 Liter capacity at top of service raservoirs.
Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers from existing w/s scheme including all material, labour, T&P etc. complete excluding water meter & pipe as per instruction given by Engineer - In-charge.
Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
unipro techno infrastructure pvt ltd
BIRENDRA SINGH RAWAT
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .