Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.3 CrAdmitted-Finance PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | ₹1.3 Cr | Admitted-Finance |
| 2 | ₹1.5 CrAdmitted-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 UDYAM WB 10 0078972 19CQSPB7095J1Z2 R M MII STATUS AS VERIFIED | KOLKATA | WEST BENGAL | 700060 | ₹1.5 Cr | Admitted-Finance |
| 3 | ₹1.7 CrAdmitted-Finance VILL ADISAPTAGRAM PO MOGRA | ₹1.7 Cr | Admitted-Finance |
| 4 | ₹1.9 CrAdmitted-Finance 18 SANKAR BOSE ROAD KOLKATA | ₹1.9 Cr | Admitted-Finance |
| 5 | ₹19.2 CrAdmitted-Finance ANGUL ODISHA 759147 UDYAM OD 01 0001580 | ANUGUL | ODISHA | 759147 | ₹19.2 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.S. ENTERPRISE | INDIAN CONSTRUCTION | TECHNO ENGINEERING | P C JOSEPH ENGINEERING AND CONTRACTOR | HANSESWARI CORPORATE MANPOWER MANAGEMENT LIMITED |
|---|---|---|---|---|---|---|---|---|
| 1.00Mech Maintenace Work of AHP (Mandatory) | ||||||||
| 1.01 | Mechanical Maintenance Work of AHP
Stage-III for the 24 months. | 24 | Months | 1,80,04,800 ₹1,80,04,800 | 1,30,80,000 ₹1,30,80,000 Lowest | 1,48,82,304 ₹1,48,82,304 | 19,20,00,000 ₹19,20,00,000 | 1,62,65,653.68 ₹1,62,65,653.68 |
| 2.00Safety PPE and Tool Tackles supply | ||||||||
| 2.01 | Safety PPE Supply for first year | 1 | Lot | 1,29,100 ₹1,29,100 | 55,000 ₹55,000 Lowest | 80,000 ₹80,000 | 1,13,185 ₹1,13,185 | 1,13,185.69 ₹1,13,185.69 |
| 2.02 | Safety PPE Supply for Second year | 1 | Lot | 16,200 ₹16,200 | 10,000 ₹10,000 Lowest | 14,000 ₹14,000 | 14,148 ₹14,148 | 14,148.21 ₹14,148.21 |
| 2.03 | Safety Tools and Tackcles Supply | 1 | Lot | 1,61,300 ₹1,61,300 | 72,000 ₹72,000 | 1,30,000 ₹1,30,000 | 14,148 ₹14,148 Lowest | 1,41,482.11 ₹1,41,482.11 |
| 3.00Optional Jobs of mech maint. | ||||||||
| 3.01 | Economizer Hopper ash cleaning by manual | 8 | No | 24,000 ₹24,000 | 12,000 ₹12,000 Lowest | 21,200 ₹21,200 | 20,000 ₹20,000 | 21,656.16 ₹21,656.16 |
| 3.02 | Air-preheater Hopper ash cleaning | 4 | No | 14,800 ₹14,800 | 6,400 ₹6,400 Lowest | 10,000 ₹10,000 | 12,800 ₹12,800 | 13,120.84 ₹13,120.84 |
| 3.03 | Cleaning of clinkers, damaged refractory Inside Bottom Ash Hopper | 2 | No | 8,600 ₹8,600 | 3,500 ₹3,500 Lowest | 6,000 ₹6,000 | 7,500 ₹7,500 | 7,601.44 ₹7,601.44 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
7 Mar 2026, 3:00 pmClosed
The General Manager, SGTPP WBPDCL
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Biennial contract of Mechanical Maintenance of Ash Handling Plant (MBPL make), Stage III, 1x660 MW along with ash water recovery system, SgTPP.
2026_WBPDC_990886_1
WBPDCL/SGTPP/NIT/E3852/25-26/ E-1167335
Open Tender
Support/Maintenance Service
Lump-sum
730 days
Sagardighi Thermal Power Project
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance.
3 documents required · 3 mandatory
₹0
₹3.3 L
Yes
Administrative Building, SgTPP, PO-Manigram, Dist-
20 Jun 2026
30 Jan 2026
11 Mar 2026
30 Jan 2026
7 Mar 2026
31 Jan 2026
13 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].