Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹2.5 L (2.42%)Admitted-Finance 2 FRIENDS ENCLAVE SHAH NAGAR DEHRADUN | ₹1.0 Cr+₹2.5 L (2.42%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical RUDRAPRAYAG | RUDRA PRAYAG | UTTARAKHAND | 246141 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Aarna Electrical And Co L1 | UTTARANCHAL FORGINGS INDUSTRY L2 |
|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | |||||
| 2.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 10 | NOS | 2,550 ₹2,550 Lowest | 2,650 ₹2,650 |
| 3.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 9 | NOS | 2,295 ₹2,295 Lowest | 2,385 ₹2,385 |
| 4.00 | PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT | 18 | NOS | 2,790 ₹2,790 Lowest | 2,970 ₹2,970 |
| 5.00 | BRACING CLAMP TOP FOR SP-23 WITH
N/B | 2 | NOS | 520 ₹520 Lowest | 530 ₹530 |
| 6.00 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 2 | NOS | 520 ₹520 Lowest | 540 ₹540 |
| 7.00 | 11 KV CABLE TIES FOR PIN INSULATOR | 315 | NOS | 6,61,500 ₹6,61,500 Lowest | 6,69,375 ₹6,69,375 |
| 8.00 | 11 KV IPC FOR COVERED TO COVERED COND. | 72 | NOS | 1,08,000 ₹1,08,000 Lowest | 1,09,440 ₹1,09,440 |
| 9.00 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR | 81 | NOS | 1,34,460 ₹1,34,460 Lowest | 1,35,270 ₹1,35,270 |
| 10.00 | 11 KV MID SPAN JOINTING KIT | 51 | NOS | 1,27,500 ₹1,27,500 Lowest | 1,29,030 ₹1,29,030 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
29 Jun 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Replacement of 11 KV Bare conductor by AAAC Conductor at Nagjgi, Lwara,Badeth on Semi Turnkey Basis
2026_UPCL4_96531_1
08/EDC(K)/2026-27
Open Tender
Repair and Maintenance Works
Item Rate
90 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹11,800
Yes
EE EDD GOPESHWAR
₹2.0 L
31 Aug 2026
11 Jun 2026
30 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUPPLY OF MATERIAL PORTION | - | - | - | - |
| 2 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 10 | NOS | - | - |
| 3 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 9 | NOS | - | - |
| 4 | PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT | 18 | NOS | - | - |
| 5 | BRACING CLAMP TOP FOR SP-23 WITH
N/B | 2 | NOS | - | - |
| 6 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 2 | NOS | - | - |
| 7 | 11 KV CABLE TIES FOR PIN INSULATOR | 315 | NOS | - | - |
| 8 | 11 KV IPC FOR COVERED TO COVERED COND. | 72 | NOS | - | - |
| 9 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR | 81 | NOS | - | - |
| 10 | 11 KV MID SPAN JOINTING KIT | 51 | NOS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendedocument.pdf
Tender Documents • 1.04 MB
BOQ_114051.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .