| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.7 Cr+₹13.5 L (8.92%)Rejected-Finance INDRA NAGAR COLONY DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.7 Cr+₹13.5 L (8.92%) | L2 | Rejected-Finance Reject |
| 3 | Not Admitted-Fee/PreQual/Technical 00 BEHIND CHARCH NAYAGOWAN LAKHERA BEHIND RAMA MANI DAIRY KATNI MADHYA PRADESH 483501 | KATNI | MADHYA PRADESH | 483501 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Due to Tender Document withdrow |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
28 Mar 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Construction of 11KV line releasing NSC for Tarmoli and Purara Pumping Scheme (different Stages) under Jal Jeewan Mission under EDD, Bageshwar on turnkey basis
2023_UPCL9_55415_1
EDD(R)-37/2022-23
Open Tender
Electrical Works
Turn-key
90 days
Bageshwar
As per tender document
3 documents required · 3 mandatory
₹11,800
Executive Engineer
₹3.0 L
23 Sept 2023
24 Feb 2023
29 Mar 2023
24 Feb 2023
28 Mar 2023
24 Feb 2023
Amount
CENTRALIZED ITEM
STP 8.5M-IS 410 SP-23 (Bottom Portion hot dip Galvanized)
11 KV Polymer Disc Insulator (B&S) Type
Disc Fitting B & S Weasel/Rabbit 45 KN
ACSR Weasel
Stay Set GI 16X1800mm
Stay Wire GI 7/3.15mm 7/10SWG
Earthing Rod MS 20X2500mm
GI Wire 5mm/6 SWG
GI Wire 4mm/8mm SWG
MS Channel 100X50 mm
MS Angle 50X50X6 mm
11 KV Polymer Pin Insulator With Pin
11 KV VCB B/C 350 /500MVA
Jointing Kit for 3x120 Sq.mm 11KV XLPE Cable (I/D)
Jointing Kit for 3x120 Sq.mm 11KV XLPE Cable(O/D)
Cable AL 3X120 sq. mm XLPE 11 KV
11 KV Pilfer Resistant Metering Cubical
11 KV Gang Operating 400A GO Switch
9 KV 10KA Light Arrester
LT XLPE Cable 1x 95 sq. mm.
GI Earthing Strip 35x6
LT Pil.resi.MC CTR for all ration (C.T. Accuracy Class-1
NON CENTRILIZED ITEM
PP&Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
Earth Wire Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
Bracing Clamp Top with N&B ST Pole SP-23 (MS flat 50X6mm)
Bracing Clamp Bottom with N&B ST Pole SP-23 (MS flat 50X6mm)
MS Nut&Bolts 12X100mm
Eye Bolt 110X12 mm
Stay Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
PG Clamp Alu Alloy Weasel To Weasel
Lug Alu Alloy Al. Lug 120 mm sq
LABOUR CHARGE
Cartage of ST poles from store centre to constrution site with loading ,unloading at both points and proper stocking. distance 71-100 km
T/F 63 KVA
Head load cartage of following poles from road to site (Average lead 0-1 km )
STP SP-23 Pole
Small material
T/F 63 KVA
Head load cartage of following poles from road to site (Average lead 1-3 km )
STP SP-23 Pole
Small material
T/F 63 KVA
Excavation of earth for pole pit of size 0.9*0.6*1/6 of full length of pole in all type of soil including propoer dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
STP SP-23 Pole
Erection of following support pole in proper level an dalingment alongwith fixing of all accessories , as per RESPO constrution Manual
STP SP-23 Pole
STP DP-23 Pole
Installation/Mounting of new T/f 63 KVA on D/pole structure and fixing of channel/angle etc and making all connection of LT/HT side and its complete commissioning.
Grouting of pole in size 0.45*0.45*1/9 of the support in cc ratio 1:4:8(1cement :4 graded stone 20mm nominal size :8 coarse sand) block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment ,leve;ing as per RESPO constuction Manual.(0.45*0.45*1/9*8.5=0.191 cum per pole
STP SP-23 Pole
Muffing of poles size0.45cm*0.60cm radius with CC 1:3:6(1 cement:3 coarse sand :6 graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement ,stone and sand etc.
Mounting and fixing of fuse sets on double pole structures including making of connections complete work.
Mounting and fixing of TPMO on double pole structures including making of connections complete work.
Mounting and fixing of Lightning arrestor set (3 nos) on double pole structure including making all connection by G.I strip size 35x6 mm to earth point complete work (excluding cost of G.I. strip)
Excavation of earth for stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed coplete work.
Erection of 11 KV stay set
Grouting of stay in size 0.6*0.6*0.3 in CC ratio 1:4:8( 1 cement :4 graded stone 20mm nominal size :8 coarse sand ) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alingment,leveling as per RESPO manual.(0.6*0.6*0.3=0.108cum per stay )
Earthing of support with MS Earth rod of 2.5 meter long by hammaring of MS road to proper depth and connecting the earth electrode with the help of G.I. wire as per RESSPO construction manual.
Laying, spreading, stringing and sagging of 11 KV line in 3 phase(3 phase 4 wire) of the following wire as phase wire with G.I. earth wire complete including fixing of all accessories in 3 nos. conductor in parallel with binding and jumpering as per profite and sagging chart.
weasel conductor
Painting of poles with angle and channel and all steel part by 1 coat of Rod Oxide Primer and 2 coats of aluminum paint and 2 strip of fluorescent altemate red and white paint 30 cm wide upto 1.5 mtrs from ground level.
ST Pole SP-23
Fabrication of cross arms with cutting of MS channel making proper hole cutting of MS angle & making proper hole as per norms complete.
Route clearance by cutting of tree branches/proning, loping and chopping of trees for LT & HT line.
Guarding of line over (telephone/Road/L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channal/angle as per RESSPO manual.
LT/11 KV line
Fixing of danger board including supply of danger board and clamp as per specifications
Erection of 11 KV VCB (O/G or B/C or I/C) Panel in all respect, making connection, testing etc in all respect at erection site.
Laying of U/G 11 KV cable in trench
Fixing of 11 KV XLPE jointing kit
Installation of 11 KV PRMC Complete including grouting and cartage and head load cartage of material
Chemical Earthing : Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm. placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. strip (to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum lenght 6 m treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.
HARIOM CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .