Officer-in-Charge, FMU(V)
Fleet Maintenance Unit, C/o Fleet Mail Office, Naval Dockyard, Visakhapatnam 14
Repair Rate Contract of CO2 Fire Fighting System fitted onboard Operational WJFACs
2021_NAVY_421704_1
PC/301/CO2/WJFAC DATED 12 Feb 2021
Single
Marine Services
Buy
1095 days
Fleet Maintenance Unit, Visakhapatnam
As per RFP
4 documents required · 4 mandatory
₹0
Exempted
17 Apr 2021
12 Feb 2021
5 Mar 2021
12 Feb 2021
4 Mar 2021
12 Feb 2021
12 Feb 2021 - 25 Feb 2021
Amount
First Year
Mandatory Services (to be undertaken annually for one ship only)
Weighment of 45Kg CO2 cylinder
Blow through of distribution pipeline and nozzles to ensure nozzles are log free
Check pressure at pilot tubes
Check pneumatic connection, solenoid valves for leakages
Check operation of Main D.V
Check Main control panel and operating stations
Check opeartion of alarms and tripping of ventilation fans
Check function of pressure switches
Anticipatory Services (to be undertaken for both ships considering 50% repair frequency)
Rectification of clogged distribution lines and nozzles
Rectification in case of any leakage from pilot air bottles
Rectify defective Pneumatic connections an Solenoid valves from leakages
Defect Rectification on Main D.V
Defect rectification on Main Control Panel and Operating Station
Rectification of defective alarms and tripping of ventilation fans
Rectification of defective pressure switches
Anticipatory Services (to be undertaken once in three year for both ships)
Filling of CO2 Bottles (removal, transportation, filling, re-fitting)
Filling of N2 Bottles
Spares
HP Flexible Hose (Manifold)
HP Flexible Hose (1/4")
Non Return Valve (Manifod)
Evacuation Hooter with Flashing Lamp
Main Control Panel Push Button
Relays
CO2 cylinder valve
CO2 Discharge Nozzle
CO2 Discharge Nozzle
Control Module (Main Control Panel Card)
Power Supply Module (Main Control Panel)
Solenoid Valve for Pilot line
Pressure Gauge (Manifold)
Push Botton for Release Cabinet
Actuator Lever for Cylinder Valve
Main Ball Valve with Pneumatic & Manual Actuator (1 1/2")
Main Ball Valve with Pneumatic & Manual Actuator (1")
Safety Valve
Pressure Switch
Audio/Visual Alarm
Gong Bell
Pressure Gauge (Master Control Box)
Pressure Switch (Master Control Box)
Second Year
Mandatory Services (to be undertaken annually for one ship only)
Weighment of 45Kg CO2 cylinder
Blow through of distribution pipeline and nozzles to ensure nozzles are log free
Check pressure at pilot tubes
Check pneumatic connection, solenoid valves for leakages
Check operation of Main D.V
Check Main control panel and operating stations
Check opeartion of alarms and tripping of ventilation fans
Check function of pressure switches
Anticipatory Services (to be undertaken for both ships considering 50% repair frequency)
Rectification of clogged distribution lines and nozzles
Rectification in case of any leakage from pilot air bottles
Rectify defective Pneumatic connections an Solenoid valves from leakages
Defect Rectification on Main D.V
Defect rectification on Main Control Panel and Operating Station
Rectification of defective alarms and tripping of ventilation fans
Rectification of defective pressure switches
Anticipatory Services (to be undertaken once in three year for both ships)
Filling of CO2 Bottles (removal, transportation, filling, re-fitting)
Filling of N2 Bottles
Spares
HP Flexible Hose (Manifold)
HP Flexible Hose (1/4")
Non Return Valve (Manifod)
Evacuation Hooter with Flashing Lamp
Main Control Panel Push Button
Relays
CO2 cylinder valve
CO2 Discharge Nozzle
CO2 Discharge Nozzle
Control Module (Main Control Panel Card)
Power Supply Module (Main Control Panel)
Solenoid Valve for Pilot line
Pressure Gauge (Manifold)
Push Botton for Release Cabinet
Actuator Lever for Cylinder Valve
Main Ball Valve with Pneumatic & Manual Actuator (1 1/2")
Main Ball Valve with Pneumatic & Manual Actuator (1")
Safety Valve
Pressure Switch
Audio/Visual Alarm
Gong Bell
Pressure Gauge (Master Control Box)
Pressure Switch (Master Control Box)
Third Year
Mandatory Services (to be undertaken annually for one ship only)
Weighment of 45Kg CO2 cylinder
Blow through of distribution pipeline and nozzles to ensure nozzles are log free
Check pressure at pilot tubes
Check pneumatic connection, solenoid valves for leakages
Check operation of Main D.V
Check Main control panel and operating stations
Check opeartion of alarms and tripping of ventilation fans
Check function of pressure switches
Anticipatory Services (to be undertaken for both ships considering 50% repair frequency)
Rectification of clogged distribution lines and nozzles
Rectification in case of any leakage from pilot air bottles
Rectify defective Pneumatic connections an Solenoid valves from leakages
Defect Rectification on Main D.V
Defect rectification on Main Control Panel and Operating Station
Rectification of defective alarms and tripping of ventilation fans
Rectification of defective pressure switches
Anticipatory Services (to be undertaken once in three year for both ships)
Filling of CO2 Bottles (removal, transportation, filling, re-fitting)
Filling of N2 Bottles
Spares
HP Flexible Hose (Manifold)
HP Flexible Hose (1/4")
Non Return Valve (Manifod)
Evacuation Hooter with Flashing Lamp
Main Control Panel Push Button
Relays
CO2 cylinder valve
CO2 Discharge Nozzle
CO2 Discharge Nozzle
Control Module (Main Control Panel Card)
Power Supply Module (Main Control Panel)
Solenoid Valve for Pilot line
Pressure Gauge (Manifold)
Push Botton for Release Cabinet
Actuator Lever for Cylinder Valve
Main Ball Valve with Pneumatic & Manual Actuator (1 1/2")
Main Ball Valve with Pneumatic & Manual Actuator (1")
Safety Valve
Pressure Switch
Audio/Visual Alarm
Gong Bell
Pressure Gauge (Master Control Box)
Pressure Switch (Master Control Box)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .