Tender Value
₹7.7 L
EMD Value
₹19,215
Closing Date
10 Jul 2024, 3:30 pmClosed
REGISTRAR
KUHS HQ, THRISSUR
Comprehensive Annual Maintenance Contract (AMC) for HVAC System at the Administration and Pareeksha - Vigyan Bhavan Buildings
2024_KUHS_678433_1
20557/2024/A4/08/Works/KUHS
Open Tender
Loading Works/ Services
Item Wise
365 days
services
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹19,215
7 Aug 2024
29 Jun 2024
12 Jul 2024
29 Jun 2024
10 Jul 2024
29 Jun 2024
29 Jun 2024 - 10 Jul 2024
Amount
Pareeksha-Vigyan Bhavan - First floor Tutorial room(1)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - First floor Class room-AHU(8TR)
Pareeksha-Vigyan Bhavan - First floor Tutorial room(2)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - First floor Tutorial room(3)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - First floor Seminar room(3)-AHU (7 TR)
Pareeksha-Vigyan Bhavan - First floor Associate professor room-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - First floor Head of Unit-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - First floor DR Room-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - First floor AR Room 1-FCU(1 TR)
Pareeksha-Vigyan Bhavan - First floorAR Room 2-FCU(1 TR)
Pareeksha-Vigyan Bhavan - First floorSorting Room -AHU(8 TR)
Pareeksha-Vigyan Bhavan - First floor STORE Room -AHU(8 TR)
Pareeksha-Vigyan Bhavan - Second floor Tutorial room(1)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Second floor Class room-AHU(8TR)
Pareeksha-Vigyan Bhavan - Second floor Tutorial room(2)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Second floor Consulting room(3)-AHU (6 TR)
Pareeksha-Vigyan Bhavan - Second floor Seminar room-AHUU(7 TR)
Pareeksha-Vigyan Bhavan - Second floor Associate professor room-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Second floor Head of Unit-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Second floor DR Room-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Second floor AR Room 1-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Second floor AR Room 2-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Second floor SORTING &Valuation Room 2-AHU(6 TR)
Pareeksha-Vigyan Bhavan - Second floor Valuation Room -AHU(6 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR) Class room-AHU(8TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Tutorial room(2)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Consulting room(3)-AHU (6 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Seminar room-AHUU(7 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Associate professor room-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Head of Unit-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)AR Room 1-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)AR Room 2-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Valuation 3-AHU(4 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Valuation 3-AHU(5 TR)
Pareeksha-Vigyan Bhavan - Third floor Tutorial room(1)-AHU (4 TR)Valuation Room 2 -AHU(6 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Tutorial room(1)-AHU (4 TR)Tutorial room(1)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Class room-AHU(8TR)
Pareeksha-Vigyan Bhavan - Fourth floor Tutorial room(2)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Consulting room-AHU (6 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Seminar room-AHU (7 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Associate professor room-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Head of Unit-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fourth floorDeputy controller Room 1-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fourth floor JR Room -FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fourth floor AR Room 1-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Fourth floor AR Room 2-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Fourth floor Valuation Room 2 -AHU(6 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Tutorial room(1)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Class room-AHU(8TR)
Pareeksha-Vigyan Bhavan - Fifth floor Tutorial room(2)-AHU (4 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Consulting room-AHU (6 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Consulting room-DX (5.5 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Seminar room-AHU(8 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Associate professor room-FCU(1 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Head of Unit-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Deputy controller Room 1-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Scrutinizer Room 1-FCU(1.5 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Committee Room 1 -AHU(4 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Committee Room 1 -DX(5.5 TR)
Pareeksha-Vigyan Bhavan - Fifth floor CE Room -AHU(8 TR)
Pareeksha-Vigyan Bhavan - Fifth floor CE Room -DX (8 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Committee Room 2 -AHU(6 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Committee Room 1 -DX(5.5 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Valuation Room -AHU(7 TR)
Pareeksha-Vigyan Bhavan - Fifth floor Valuation Room -AHU(6 TR)
Pareeksha-Vigyan Bhavan - Plant Room - 130 TR CHILLER
Pareeksha-Vigyan Bhavan - Plant Room - Primary pump
Pareeksha-Vigyan Bhavan - Plant Room - Secondary pump
Pareeksha-Vigyan Bhavan - Plant Room - Condensor pump
Pareeksha-Vigyan Bhavan - Plant Room - Cooling tower
Pareeksha-Vigyan Bhavan - Plant Room - Booster pump
Pareeksha-Vigyan Bhavan - Plant Room - Pressurisation tank
Ball valve(15 mm)
Ball valve(25 mm)
Ball valve(32 mm)
Butterfly valve(40 MM)
Balancing valve(25 MM)
Balancing valve(32 MM)
Balancing valve(40 MM)
2 WAY MIXING VALVE(25 MM)
2 WAY MIXING VALVE(32 MM)
2 WAY MIXING VALVE(40 MM)
Y STAINER(25 MM)
Y STAINER(32 MM)
Y STAINER(40 MM)
Temperature Gauge
Pressure Gauge
Auto Air vent
Butterfly valve(200 MM)
Butterfly valve(125 MM)
Butterfly valve(100 MM)
Butterfly valve(80 MM)
Butterfly valve(50 MM)
Butterfly valve(50 MM)
Balancing valve(80 MM)
Balancing valve(100 MM)
Balancing valve(125 MM)
Balancing valve(200 MM)
Flexible bellow (200 MM)
Flexible bellow (200 MM)
Y Stainer (200 MM)
Y Stainer (125 MM)
NRV(125 MM)
NRV(200 MM)
Flow switch
ADMINISTRATION BUILDING - Screw type WATER CHILLING UNITS with 130TR Model: Blue Star Model LCWX1-0470F.
ADMINISTRATION BUILDING - Primary chilled water pumps Flow rate 312 USGPM Head-14 M
ADMINISTRATION BUILDING - Condenser water pumps Flow rate 520 USGPM,Head-17 M
ADMINISTRATION BUILDING - Secondary Chilled Water Pumps Flow rate 312 USGPM.Head-27M
ADMINISTRATION BUILDING - Variable Frequency Drive Panel
ADMINISTRATION BUILDING - COOLING TOWER INDUCED DRAFT COOLING TOWERS for 130Tr chiller. Flow rate 520 USGPM Make:Paharpur Model: AQ3863
ADMINISTRATION BUILDING - 1st Floor - E LIBRARY AHU 1&2-7630 cfm, 10TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 1st Floor - PROJECTION ROOM-2380 CFM, 6 TR, 20MM ESP, 4 ROW
ADMINISTRATION BUILDING - 1st Floor - Library cassette AC 1.5 TR
ADMINISTRATION BUILDING - 1st Floor - Library cassette AC 2 TR
ADMINISTRATION BUILDING - 1st Floor - Library cassette AC 2.5 TR
ADMINISTRATION BUILDING - 2nd Floor - DEANS OFFICE AHU 1-2540 CFM,7TR, 20MM ESP. 6 ROW
ADMINISTRATION BUILDING - 2nd Floor - DEANS OFFICE AHU 2-3266 CFM.9TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 2nd Floor - VISITING DEANS OFFICE-2900 CFM, 8TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 2nd Floor - MEEETING HALL AHU 1-2638 CFM,7TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 2nd Floor - MEETING HALL AHU2-2262 efin, 6TR, 20MM ESP 6 ROW.
ADMINISTRATION BUILDING - 3rd Floor - REGISTRAR's OFFICE-1847 cfm, STR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 3rd Floor -CONFIDENTIAL ROOM 2111 CFM,6TR, 20MM ESP. 6 ROW
ADMINISTRATION BUILDING - 3rd Floor -MEETING HALL AHUI-2504 CFM,7TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 3rd Floor -MEETING HALL-AHU 2-2146 CFM, 6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 3rd Floor -CE Confidential room-4way cassette unit-1Tr
ADMINISTRATION BUILDING - 3rd Floor -Rm 404-4way cassette unit -1 Tr
ADMINISTRATION BUILDING - 3rd Floor -Rm 404-4way cassette unit -1 Tr
ADMINISTRATION BUILDING - 3rd Floor -Rm 404-4way cassette unit -1 Tr
ADMINISTRATION BUILDING - 3rd Floor -Rm 404-4way cassette unit -1 Tr
ADMINISTRATION BUILDING - 4th Floor -DEAN ACADEMICS 1800 CFM,5TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 4th Floor -JR ACADEMICS FO-1500 CFM,4TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 4th Floor -MEETING HALL AHUI-5000 cfm, 7TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 4th Floor -MEETING HALL AHU2, 6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 4th Floor -PA to Dean Academics room-4way cassette unit
ADMINISTRATION BUILDING - 5th Floor -SYSTEM OFFICE AHUI&2-5263 cfm, 10TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 5th Floor -SYSTEM OFFICE AHU3-4737 efm, 9TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 5th Floor -SYSTEM MANAGER -2200 CFM,6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 5th Floor -MEETING HALL AHU1&2-4543 cfm, 6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -VC CHAMBER-2300 cfm, 6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -CONFERENCE ROOM AHU1&2-4300 cfm, 6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -PVC CHAMBER-2000 CFM,5TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -GC ROOM-AHU 1-2585 CFM, 7TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -GC ROOM-AHU 2 -2216 CFM,6TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -DINING AND WAITING ROOM -2500 CFM,7TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 6th Floor -Rm 704A-4way cassette unit -1 Tr
ADMINISTRATION BUILDING - 6th Floor -Rm 704A-4way cassette unit -3 Tr
ADMINISTRATION BUILDING - 6th Floor -Rm 704A-4way cassette unit -4 Tr
ADMINISTRATION BUILDING - 6th Floor -Rm 704A-4way cassette unit -3 Tr
ADMINISTRATION BUILDING - 6th Floor -PA to Vice Chancellor-4way cassette unit
ADMINISTRATION BUILDING - 6th Floor -PA to Pro Vice Chancellor-4way cassette unit
ADMINISTRATION BUILDING - 7th Floor -VC CHAMBER-2600 cfm, 7TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 7th Floor -SENATE HALL AHU1-6400 cfm, 20TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 7th Floor -SENATE HALL AHU1-6400 cfm, 20TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 7th Floor -MINI CONFERENCE ROOM-2850 cfm, 8TR, 20MM ESP. 6 ROW
ADMINISTRATION BUILDING - 7th Floor -DINING ROOM AHU1-3579 cfm, 10TR, 20MM ESP,6 ROW
ADMINISTRATION BUILDING - 7th Floor -DINING ROOM AHU2-3221 cfm, 9TR, 20MM ESP, 6 ROW
ADMINISTRATION BUILDING - 7th Floor -Green Rooms -4way cassette unit -1 Tr
Ceiling suspended 4 Way 2 TR 600 cfm Cassette type fan coil unit Make: Midea
Maintenance to all chilled water piping , drain piping including insulation.
VOLTAS LIMITED
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1054993.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .