| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC 76 C INSTITUTIONAL AREA SECTOR 18 GURUGRAM 122 015 HARYANA | GURUGRAM | HARYANA | 122015 | ₹1.8 Cr | 1 | Accepted-AOC 1st lowest bidder |
| 2 | 2₹2.3 CrRejected-AOC 1702 S3 TOWER CLOUD 9 SECTOR 1 VAISHALI GHAZIABAD | ₹2.3 Cr | 2 | Rejected-AOC 2nd lowest bidder |
| 3 | 3₹4.0 CrRejected-AOC 8 2 5 RAVULA RESIDENCY SRINAGAR COLONY MAIN ROAD PUNJAGUTTA HYDERABAD TELANGANA 500082 INDIA | HYDERABAD | TELANGANA | 500082 | ₹4.0 Cr | 3 | Rejected-AOC 3rd lowest bidder |
| Sl No | Description | Qty | Unit | WAPCOS Limited H3 | Aarvee Engineering Consultants Limited H1 | Convolution Engineering Consultancy LLP H2 |
|---|---|---|---|---|---|---|
| 1.00 | Feasibility study and submission of a preliminary report and site plan giving schematic proposal as per directions of engineer-in-charge . | 10 | Km | 3,00,000 ₹30 L | 1,20,000 ₹12 L | 7,00,000 ₹70 L |
| 2.00 | Establishment of different types of Bench Mark (Mysto type & Temporary) of standard specifications (4 Nos Bench mark per Kilometer) including its painting, engraving etc complete including cost of manpower, material, labour, etc. as per directions of engineer-in-charge . | 141.19 | Km | 15,000 ₹21.2 L | 50,000 ₹70.6 L | 3,500 ₹4.9 L |
| 3.00 | Longitudinal and cross sectional Survey of River/cherra with affected/required bank and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. | 141.19 | Km | 30,760.5 ₹43.4 L | 25,000 ₹35.3 L | 45,000 ₹63.5 L |
| 4.10 | Preparation of DPR in/c. report, design, calculation, cost estimates, land requirements, drawings etc. as per all survey data and other related data and supply them in both soft and hard formats complete, including cost of manpower, labour, machineries, stationeries, transportation etc. as per directions of engineer-in-charge.
For Construction of Earthen Embankment for Flood Protection Work.In case of cumulative Length of Embankments Upto 10.00 Km. | 1 | Per Job | 71,00,000 ₹71 L | 1,15,00,000 ₹1.1 Cr | 65,00,000 ₹65 L |
| 4.20 | For Strengthening & raising of Existing Embankments.
In case of cumulative Length of Embankments Upto 10.00 Km. | 1 | Per Job | 15,000 ₹15,000 | 1,40,00,000 ₹1.4 Cr | 20,00,000 ₹20 L |
| 4.30 | In case of cumulative Length of Embankments Beyond 10.00 Km. | 121.19 | Per Km | 20,000 ₹24.2 L | 20,000 ₹24.2 L | 5,000 ₹6.1 L |
Tender Value
Refer Docs
EMD Value
₹4.8 L
Closing Date
11 Nov 2025, 3:00 pmClosed
O/O The Executive Engineer, WRID, Kunjaban
O/O The Executive Engineer, WRID, Kunjaban
Consultancy Services for preparation of DPR for the FMP work Construction of Earthen Embankment and Raising and Strengthening of Existing Embankment in different parts of Tripura under FMBAP
2025_CEWR_66556_1
PNIT_14/EE/WRID/AGT/2025-26
Open Tender
Consultancy
180 days
Different parts of Tripura
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,000
₹4.8 L
O/O The Executive Engineer, WRID, Kunjaban
29 Dec 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
11 Nov 2025
5 Nov 2025
28 Oct 2025 - 5 Nov 2025
5 Nov 2025
Amount
Feasibility study and submission of a preliminary report and site plan giving schematic proposal as per directions of engineer-in-charge .
Establishment of different types of Bench Mark (Mysto type & Temporary) of standard specifications (4 Nos Bench mark per Kilometer) including its painting, engraving etc complete including cost of manpower, material, labour, etc. as per directions of engineer-in-charge .
Longitudinal and cross sectional Survey of River/cherra with affected/required bank and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge.
Preparation of DPR in/c. report, design, calculation, cost estimates, land requirements, drawings etc. as per all survey data and other related data and supply them in both soft and hard formats complete, including cost of manpower, labour, machineries, stationeries, transportation etc. as per directions of engineer-in-charge. For Construction of Earthen Embankment for Flood Protection Work.In case of cumulative Length of Embankments Upto 10.00 Km.
For Strengthening & raising of Existing Embankments. In case of cumulative Length of Embankments Upto 10.00 Km.
In case of cumulative Length of Embankments Beyond 10.00 Km.
Convolution Engineering Consultancy LLP (BID ID -192216)
WAPCOS Limited (BID ID -192167)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 1.17 MB
Tendernotice_3.pdf
PDF • 0.55 MB
BOQ_67733.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid