| 1 | L1₹24.4 LAccepted-AOC | ₹24.4 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹24.9 L+₹42,937.05 (1.76%)Rejected-Finance | ₹24.9 L+₹42,937.05 (1.76%) | L2 | Rejected-Finance Not Qualified |
| 3 | L3₹25.6 L+₹1.2 L (4.93%)Rejected-Finance NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | ₹25.6 L+₹1.2 L (4.93%) | L3 | Rejected-Finance Not Qualified |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
28 Nov 2022, 2:00 pmClosed
SE
EDC Tehri
Conversion of HT line from 1Ph2W to 3Ph4W and LT line from 1Ph2W to 3Ph4W LT line, at different vill in Lambgaon and Rajakhet section due to Over loaded 16 KVA S/s in Pratp Nagar and Jakhnidhar Block, under EDSD Pratap Nagar
2022_UPCL4_51876_1
41/EDCT/2022-23
Open Tender
Miscellaneous Services
Item Wise
90 days
Tehri
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
EE ETD
₹75,000
Yes
27 Jul 2023
19 Nov 2022
29 Nov 2022
19 Nov 2022
28 Nov 2022
19 Nov 2022
Safe cartage of following material from ESSC, New Tehri to roadside of work with loading & unloading at both ends dest. 174 Km.
ST Pole, SP -23
ST Pole SP-21
25 KVA T/F
Small line material
Head Load Cartage of following material from roadside to different worksites distance up to 0 to 01Km
ST Pole, SP -23
ST Pole SP-21
25 KVA T/F
Small line material
Head Load Cartage of following material from roadside to different worksites distance up to 1 to 03 Km
ST Pole, SP -23
ST Pole SP-21
25 KVA T/F
Small line material
Fabrication of MS Channal/Angle after cutting in required sige with drealing of holles.
Dismantling of LT line LT XLPE AB Cable 1C*16+25sqmm
Dismantling of LT pole SP-10 with all accessories.
Dismantling of 11KV line from tilted pole structure with ACSR Rabbit Conductor without Earth Wire.
Dismantling of tilted ST Pole SP-23 with all accessories complete.
ST S/P, SP- 23
ST D/P, SP-23
Dismantling of existed channel from existed D/P for required fabrication.
Excavation, Digging & Errection of pit for size 0.9*0.9*1/6 Mtr. following Pole in boulder mixed soil, grouting in 1:4:8 cc in size 0.45*0.45*1/9 Mtr. Including fitting and Errection of all accosseries on pole.
ST S/P, SP- 23
ST D/P, SP-23
ST Pole SP-10
ST Pole SP-21
Fixing of channel after fabrication on existed D/P.
Muffing of Poles with cc 1:3:6 block & 45cm hight from groung level including cost of ballast cement and sands etc.
Digging of pit for New& pulled out stay & erection with grouting 1:4:8 cement & concrete inculiding nozzling and binding complete.
Route clearance by cutting of tree/branches coming in the way of line complete. (Per Tree (LS).
Errection and digging of Earth Rod 20x2500 mm & GI Wire 5 mm 6SWG
Laying, stringing & resagging of 3P4W, 11KV line ACSR Rabbit Conductor inculiding Rejumpring and rebinding complete.
Providing Special Earthing of T/f Neutral Point, Body & L.A. with 5 Nos. Earth Electrods 20x2500 mm & G.I. Strips of 25x3 Sq.mm Complete.
Dismantling of 16 KVA old & used T/F from Double Pole including opening in all connection
Mounting of 25 KVA T/f on D/P Structure with making HT/LT Connection complete.
Mounting & fixing of 11 KV Fuse set & 11 KV G/O switch complete.
Mounting & fixing of L.A. on Double Pole structure including making all conection by G.I. strip size 35x6 mm to eatrh point Complete work(Incuding cost of G.I.Strip)
Back Head Load cartage of old & used 16 KVA T/F from Sub station Site to road side Avg. dist. 3 km.
Safe back cartage of old & used 16 KVA T/F from nearest road side to J.E. store Lambgaon by pvt truck with loading & unloading both ends. Avg. dist. 50 km.
Errection and commissioning of following size of insulated Arial Bunched Cable. --
LT XLPE Cable 1Cx16+25 mm²
LT XLPE Cable 3Cx16+25 mm²
Fixing of following GI Clamps with hooks
Fixing of Dead End Clamps with I-Hook
Fixing of Suspension Clamps with I-Hook
Connector AB Cable 25 Sqr.mm to 25 Sqr.mm
Head load cartage of MS Scrap distt. 0 to 1Km
Head load cartage of MS Scrap distt. 1 to 3Km
Safe back cartage of old & used AB Cable 1c*16+25sqmm from nearest road side to store Rishikesh by pvt truck with loading & unloading both ends. Avg. dist. 150 km.
Providing and fixing of following De-certralized material for the completion of the above Works.
PP Clamp, SP-23 with N&B
F Clamp, SP-23 with N&B
Stay Clamp, SP-23 with N&B
Stay Insulator
Earth Wire Clamp, SP-23 with N&B
Suspention Clamp with 'I' hook (Insulated)
Dead End Clamp with 'I' hook (Insulated)
LT Insulation Piercing Connector for LT section Pole.
Connector AB Cable 25 Sqr.mm to 25 Sqr.mm
Line to Line Jumpring Connector for mid span.
Alu.toAlu. Connector ABCable 25 Sqr.mm to 25 Sqr.mm
Alu.toAlu. Connector AB Cable to LT Service Cable
Stay Clamp, SP-21 with N&B
POWER DESIGN
MS SHYAM SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .