Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance ADMINISTRATIVE BUILDING SHIPYARD PREMISES SHIPYARD PREMISES M G ROAD PERUMANOOR ERNAKULAM KERALA ERNAKULAM KERALA 682015 | ERNAKULAM | KERALA | 682015 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹31 L
Closing Date
31 Oct 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
NSRY (Kochi)
Essential Repairs and Dry Docking of INS magar
2022_NAVY_559191_1
PP/02/3480/MAGAR/ERDD/22
Single
Marine Services
Item Rate
60 days
AT KOCHI
The shipyard must have suitable dry dock facility and sufficient infrastructure for undertakingEssential Repairs and Dry Docking of INS magar
4 documents required · 4 mandatory
₹0
₹31 L
Yes
NSRY, Kochi
1 Nov 2022
21 Oct 2022
1 Nov 2022
21 Oct 2022
31 Oct 2022
26 Oct 2022
21 Oct 2022 - 24 Oct 2022
25 Oct 2022
Amount
Sub Heading 1
Cost of Dry Dock hire charges, General Services indicated in the BoQ
Cost of Repair Part:- (a) Total cost of Hull Work Package
(b) Total cost of Engineering work package
(c)Total cost of Electrical work package
GST on Serial 1.01 to 1.04
Budgetary cost of Spares
GST applicable on serial 1.06
Any other taxes and duties on serial 1.06 if any
Miscellaneous (not included in any of the serial above)
GST if any on serial 1.09
Description of Work / Item(s)
Amount
GENERAL SERVICES
PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY AUTHORISED AND REGISTERED THIRD PARTY INSPECTING AGENCIES EX - LRS, IRS, ABS ETC.
ONLINE MONITORING OF REFIT AND PERT CARDINALS TO BE ENABLED WITH MS AZURE ACTIVE DIRECTORY, MS PROJECT AND MS OFFICE 365 WITH SHIPYARD REPS, NSRY(K) REPS AND SHIP STAFF AS USERS
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN SINGLE VERSION, BOTH CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN BOTH VERSION (DURATION 43DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT
DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
SUBSEQUENT DAYS IN DOCK.
ASSISTANCE FOR DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
ARRANGE PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY.QUOTE UNIT RATE PER DAY
MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR 2 OPERATION
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. DREDGING AS REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 45 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT INCLUDING NECESSARY CONNECTION / DISCONNECTION (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER . SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARDMETER/ENERGY METER IN SUPPLY LINE
CONTINUED PROVISIONING OF STABILISED POWER SUPPLY QTY -03 NOS
PROVIDE 02 SEA WATER FIRE MAINS WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES, MANIFOLDS AND INCLUDE NECESSARY CONNECTION / DISCONNECTION. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBERATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED ON START OF REFIT
SHIPYARD IS TO ESTABLISH A SECURITY PERIMETER AROUND THE VESSEL WITHIN 2 SENTRIES ROUND THE CLOCK.CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE KEPT FOR LAST THIRTY DAYS
SHIPYARD TO PROVIDE 02 PORTABLE AC UNITS (TOTAL 45 TR CAPACITY) WITH AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES (MINIMUM)TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
PROVIDE FRESH WATER 02 TONS PER DAY. PAYMENT AT ACTUALS. QUOTE TO INCLUDE NECESSARY CONNECTION / DISCONNECTION
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIP PAYMENT AT ACTUALS
PROVIDE JETTY CRANE 10-15 TON CAPACITY DURING THE REFIT AT THE SHIPYARD (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT AT ACTUALS
PROVIDE MOBILE CRANE 40 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. PAYMENT AT ACTUALS
PROVIDE SERVICES OF ONE LISTER DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT AT ACTUALS
PROVIDE SERVICES OF ONE FORK-LIFT DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT AT ACTUALS
CLEANING OF ALL TANKS, VENTILLATION AND OBTAINING GAS FREE CERTIFICATE IS THE RESPONSIBILITY OF SHIPYARD. 39 TANKS
PROVIDE 15 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS
TEMPORARY LIGHTING AND VENTILLATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKSMUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT AT ACTUALS. PROVISION OF 05 PORTABLE INTAKE/ EXHAUST BLOWERS OF MINIMUM 02 KW RATING WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT AT ACTUALS.
PROVIDE LOAD BANK 100KW FOR LOAD TRIALS OF DA WITH MLOADED TRIAL CAPACITY INCLUDING HIRE CHARGES WITH OPERATED CREW AND NECESSARY CONNECTION / SHIFTING(FOR NAVY ADDITIONAL REQUIREMENT IF ANY ONLY SHIPYARD REQUIREMENT WITH MANDATORY TRIALS POST ROUTINES ARE TO BE CARRIED IN SEPERATALY) PAYMENT AT ACTUALS.
PROVIDE PORTABLE 100 KW DA INCLUDING HIRE CHARGES WITH OPERATOR CREW AND NECESSARY CONNECTION/SHIFTING. (FOR NAVY'S ADDITIONAL REQUIREMENT,IF ANY ONLY. SHIPYARD REQUIREMENTS VIZ. DA REQUIREMENT VIEW NON AVAILABILITY OF SHORE SUPPLY TO BE CATERED SEPERATELY) PAYMENT AT ACTUALS.
SHIP YARD TO TEST LUB OIL/FUEL / COOLANTS/HYDRAULIC OIL /WATER AS PER SHIPS REQUIREMENT FOR NECESSARY PARAMETERS AS INDICATED BY SHIP STAFF AND PROVIDE RESULTS/CERTIFICATE. STANDARD CONTAINERS / SAMPLE BOTTLES CAPACITY 250 ML TO BE PROVIDED FOR SHIPYARD FOR LANDING THE SAMPLES FOR LUB OILS, COOLANTS, HYDRAULIC OIL ETC FOR ANALYSIS
10 NOS PORTABLE VENTILATION BLOWERS NEED TO BE SUPPLIED FOR THE DURATION OF REFIT FOR VENTILATION OF THE COMPARTMENTS AND TANKS (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY)
SHIPYARD TO PROVIDE ASSISTANCE FOR LOADING / UNLOADING OF STEEL PLATES IN TERMS OF MANPOWER (04 MEN), TRAILER, AND MOBILE CRANE (TWO IN NUMBER, 5 TON EACH) FOR MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD . PAYMENT AT ACTUALS
ADMIN SERVICES
SEPARATE SHORE TOILETS AND WASHROOMS FOR SHIP'S OFFICERS AND CREW SUITABLE FOR 06 OFFICERS AND 70 SAILORS NEAR TO SHIPS BERTH / DOCK (WITHIN 100 MTRS).
01 AC DINING HALL WITH LEATHER SOFA SET, DINING TABLE AND CHAIRS, DINING OF 06 OFFICERS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS).
01 AC DINING HALL SUITABLE FOR DINING TABLE AND CHAIRS FOR DINING OF 70 SAILORS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS).
PROVISION OF SHORE GALLEY WITH 04 LPG BURNERS/ELECTRIC HOT PLATES , INCLUDING COST OF GAS/ELECTRICITY AND SINK WITH WATER CONNECTION FOR WASHING OF PLATES, UTENSILS ETC. FRESH WATER RO PURIFIER/ HEAVY DUTY AQUAGUARD TO BE FITTED FOR MEETING GALLEY AND SHIPS CREW WATER REQUIREMENT (AT TWO LOCATIONS VIZ GALLEY AND DINING HALL). PAYMENTS ON ACTUALS
SUPPLY 300 LITRES OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD.
AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE ( INCLUDING OFFICE TABLE, EXECUTIVE CHAIR, VISITORS SOFA, FIRMLY MOUNTED GODREJ SAFE, 01 STRONG LOCKER AND 03 VISITORS CHAIRS AND DINNING TABLE WITH CHAIR) WITH ATTACHED TOILET FOR COMMANDING OFFICER FOR REFIT DURATION
AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (03 ROOMS/CONTAINERS) FOR OFFICERS. INCLUDING 05 TABLE, 05 EXECUTIVE CHAIR, AND 10 VISITORS CHAIRS FOR REFIT DURATION
AC OFFICE SPACE FOR REFIT OFFICE (HALL WITH SEPERATORS/ ROOMS(06)/ CONTAINERS(06) FOR OFFICES VIZ, ENGG OFFICE, ELE OFFICE, HULL OFFICE, GUNNERY/SS OFFICE, SHIPS/REG OFFICE AND REFIT OFFICE, SIX TABLES,20 CHAIRS AND 08 RACKS WITH LOCK FOR FILE KEEPING ARE TO BE PROVIDED FOR REFIT DURATION
PROVIDE 01 AC OFFICE SPACE / CONTAINER WITH REFRIGERATOR FOR SHIPS SICK BAY FOR REFIT DURATION INCLUDING BEDS,TABLES AND STORAGE CUPBOARDS (TWO EACH)
SEPARATE TOILETS FOR SHIP'S OFFICERS AND CREW ARE TO BE PROVIDED WITHIN 50 M OF OFFICE SPACE
PROVIDE ONE STD LAND LINE TELEPHONE CONNECTION FOR SHIP STAFF. SAME TO BE INSTALLED AT OFFICE/SHIP AS INDICATED BY SHIP STAFF FOR REFIT DURATION
ONE FAX MACHINE WITH THREE CATRIDGE TO BE PROVIDED WITH STD FAX LINE FOR REFIT DURATION
PROVIDE SIX PC(NOT OLDER THAN THREE YEARS) WITH VALID WINDOWS AND MS OFFICE FOR REFIT DURATION FOR SHIP STAFF
PROVIDE INTERNET CONNECTION AT ONE LOCATION AS INDICATED BY SHIP STAFF FOR REFIT DURATION
FOUR PRINTERS WITH EIGHT SUITABLE CARTRIDGES AND ONE HEAVY DUTY COPIER/PRINTER WITH TWO SUITABLE TONERS ARETO BE PROVIDED REFIT DURATION
ONE OFFICE ASSISTANT/CLEANING STAFF FOR DAILY MAINTENANCE TO BE AVAILABLE 12 HRS IN A DAY FOR REFIT DURATION
PROVIDE 05 NO.s 40 FT CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF SPARES / ITEMS DURING REFIT TIME.
PROVIDE AC 02 CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF CRITICAL SPARES / ITEMS DURING REFIT TIME.
TWO AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE FOR RMT(PLANNING & COMMERCIAL) OFFICERS OF NSRY EACH WITH ATTACHED TOILET, EXECUTIVE TABLE, EXECUTIVE CHAIR, VISITORS SOFA, TWO CUPBOARDS WITH LOCK/KEY AND 03 VISITORS CHAIRS IN SHIPYARD/NSRY AS REQUIRED
PROVIDE ONE STD LAND LINE TELEPHONE CONNECTION FOR RMT OF NSRY FOR REFIT DURATION
PROVIDE TWO PCs, BRANDED/NOT ASSEMBLED, MINIMUM I5 PROCESSOR, SCREEN SIZE ATLEAST 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE FOR RMT(PLANNING & COMMERCIAL) OF NSRY TO BE PROVIDED IN SHIPYARD/NSRY AS REQUIRED
TWO PRINTERS WITH EIGHT SUITABLE CATRIDGES AND ONE HEAVY DUTY COPIER/PRINTER WITH TWO COMPATIBLE ORIGINAL TONERS ARE TO BE PROVIDED IN SHIPYARD/NSRY AS REQUIRED
ONE OFFICE ASSISTANT/CLEANING STAFF FOR DAILY MAINTENANCE TO BE AVAILABLE 12 HRS IN A DAY FOR REFIT DURATION
STATIONARY IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF RMT OFFICE OF NSRY FOR Rs 60,000/- AS REQUIRED BY RMT(PLANNING & COMMERCIAL)
PROVIDE ONE CHANGING ROOM WITH LOCKERS AND ATTACHED WASH ROOM FOR NSRY(K) WORKERS. PAYMENT AT ACTUALS
PROVIDE ONE(01) OPEN TRUCK/EICHER EQUIVALENT FOR TRANSPORTING MATERIAL/SPARES FROM SHIPYARD TO MO(K)/NSRY(K) FOR 08 HRS/80 KMS PER DAY WHICHEVER IS LESS. REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE. PAYMENT AT ACTUALS
PROVIDE ONE(01) TATA ACE/EQUIVALENT FOR TRANSPORTING MATERIAL/SPARES FROM SHIPYARD TO MO(K)/NSRY(K) FOR 08 HRS/80 KMS PER DAY WHICHEVER IS LESS. REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE. PAYMENT AT ACTUALS
PROVIDE TWO FIVE SEATER AC CARS ONE EACH FOR PROJECT OFFICER AND COMMERCIAL (NSRY) (15 HRS/150 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2018, WHITE COLOUR, FITTED WHITE CLEAN SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR WHITE SHIRT, TROUSER AND SHOES)
PROVIDE ONE 7 SEATER AC CAR FOR PROJECT MONITORING TEAM (NSRY) (15 HRS/150 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2018, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES)
PROVIDE ONE FIVE SEATER AC CAR FOR QA & TRIAL OFFICERS OF NSRY (15 HRS/150 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2018, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES)
PROVIDE ONE AC CAR FOR CO (15 HRS/150 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2017)
TWO AC CAR FOR OFFICERS (15 HRS/150 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2017)
TWO(02) NO.s AC 52 SEATER BUS, ONE EACH FOR SHIP AND NSRY, REGISTRATION NOT OLDER THAN 2018, 15 HRS/150 KMS PER DAY PER BUS. PAYMENT AT ACTUALS
PROVIDE NITROGEN BOTTLES FOR NSRY(KOC) WORK REQUIREMENTS. NOTE :SHIPYARD REQUIREMENT TO BE QUOTED SEPARATELY
PERMANENT WELDING OF BOW AND RAMP DOORS TO BE UNDERTAKEN. POST WELDING DPT AND HOSE TEST TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF FOLLOWING ITEMS OF BOW AND RAMP DOOR (WORK INVOLVES DEGUTTING, SHIP SIDE TECHNICAL WINDOW CUTTING AND REGUTTING, POST WELDING DPT AND HOSE TEST TO BE UNDERTAKEN) HYDRAULIC TANK
HYDRAULIC LINES
HYDRAULIC BOLTS
STEEL WIRE ROPE AND PULLEY
HYDRAULIC CLEATS
CHAIN CABLE
CONTROL PANEL
OPERATING PANEL CONSOLE INCLUDING INDICATION PANEL
EMERGENCY DD PUMP
HYDRAULIC CYLINDER
HYDRAULIC PUMPS
DEGUTTING AND REMOVAL OF FOLLOWING (WORK INVOLVES DEGUTTING, SHIP SIDE TECHNICAL WINDOW CUTTING AND REGUTTING, POST WELDING DPT AND HOSE TEST TO BE UNDERTAKEN) HYDRAULIC TANK
OPERATING PANEL
HYDRAULIC LINES
CONTROL PANEL
STEELWIRE ROPE
HYDRAULIC MOTOR
GEAR BOX
HYDRAULICMOTOR FOR BRAKE
HYDRAULIC VALVES
EMERGENCY DD PUMP
DAVIT ARM OF 04 LCA DAVITS (02 EACH)
HYDRAULIC PUMPS
BLANKING OF EM LOG TO BE UNDERTAKEN. DPT TO BE UNDERTAKEN POST BLANKING.
BLANKING OF ECHO SOUNDER TO BE UNDERTAKEN. DPT TO BE UNDERTAKEN POST BLANKING.
RENEWAL OF SACRIFICIAL ANODES AT FOLLOWING LOCATIONS TO BE UNDERTAKEN I.A.W IHQ MOD(N) POLICY LETTER NC/8333 DATED 12 MAY 22. (WORK INVOLVES DP TEST POST HOTWORK) U/W HULL (MK-I)
BALLAST TANK (MK-II)
RUDDER (MK-III)
SEA CHEST (MK-III)
SEA CHEST (MK-XI)
INSPECT THE INTERNAL COATING OF TANK AND RECOAT AS NECESSARY WITH HIGH GRADE COAL TAR EPOXY.
EXAMINE THE INSPECTION COVER JOINTS FOR SERVICEABILITY AND RENEW IF NECESSARY. REFIT THE JOINTS AND COVERS. SURVEY BY NSRY
CHEMICAL CLEANING OF PIPE LINE OF BOTH AFT STP/EVAC SYSTEM TO BE UNDERTAKEN.
04 IN NO END FLANGE OF VACUUM PUMP OF AFT STP OBSERVED CORRODE THINNED AND HOLED. REPAIR/RENEWAL OF SAME TO BE UNDERTAKEN IN SITU. QTY-04
DEGUTTING, REMOVAL AND EXAMINE FOLLOWING COMPONENTS OF FWD STP'S NON-GEARED STORM VALVES
DISCHARGE VALVES
PLUG COCK VALVES
CONTROL PANEL
HYDROPHORE CONTROL PANEL
HYDROPHORE
MARINER UNIT
DISCHARGE PUMP AND MOTOR
MACERATOR
FIXED H2S SENSOR
OVERBOARD VALVES
SYSTEM PIPELINES
DEGUTTING AND REMOVAL OF BOTH FWD STP TANKS (WORK INVOLVES DEGUTTING, SHIP SIDE TECHNICAL WINDOW CUTTING AND REGUTTING, POST WELDING DPT AND HOSE TEST TO BE UNDERTAKEN)
CALIBRATION OF PORTABLE H2S SENSOR TO BE UNDERTAKEN. QTY-02
CALIBRATION OF FIXED H2S SENSOR TO BE UNDERTAKEN. QTY-04
ALL TANKS, COFFERDAMS AND SEA TUBES WHICH ARE REPAIRED BY BUILD UP/ REMOVAL OR SUBJECTED TO HOT WORK FOR WELDING OF PAD PIECE/ FOUNDATION ON ANY OTHER BOUNDARIES ARE TO BE SUBJECTED TO DP TEST FOLLOWED BY AIR PRESSURE TESTING I.A.W IHQ MOD(N) POLICY LETTER NC/8333 DATED 12 MAY 22
SCHEDULE AND CONDUCT APT WITH YARD ASSISTANCE.
SCHEDULE AND CONDUCT AHT WITH YARD ASSISTANCE.
REMOVE MARINE FOULING FROM THE HULL USING WOODEN SCRAPPER OR HYDRO JETTING WITH MAXIMUM PRESSURE NOT EXCEEDING 3000 PSI.
MAINTENANCE PAINTING UPTO 01 COAT OF A/F PAINT TO BE UNDERTAKEN POST CONDITION BASED ASSESMENT I.A.W IHQ MOD(N) POLICY LETTER NC/8333 DATED 12 MAY 22. HOWEVER PERFOMANCE GUARENTEE OF PAINT SCHEME OF U/W HULL AND INTERNAL TANKS INCLUDING BILGES WILL EXPIRE IN DEC 22 I.A.W NO 53/16. PAYMENT AT ACTUALS
1 INCH HOLE OBSERVED ON BOAT DECK. REPAIR/ STEEL RENEWAL TO BE UNDERTAKEN. POST RENEWAL DPT TO BE UNDERTAKEN
FIXED TRUNKING ON BULKHEAD OF ATU-3 AND SEO CABIN CORRODED THINNED HOLED AT MULTIPLE LOCATIONS. RENEWAL OF TRUNKING TO BE UNDERTAKEN. WORK INVOLVES DEGUTTING, RE-GUTTING OF LAGGING AND PANELING . AREA 1.5 SQR MTR.
LEAKAGE OBSERVED FROM ELEPHANT SHOE OF CENTER FUEL TANK IN CLASS ROOM LOBBY. PERMANENT REPAIRS TO BE UNDERTAKEN.
POST USG SURVEY OF UNDERWATER HULL PLATING DEFECTIVE PLATES TO BE RENEWED VACCUM TEST TOB BE CARRIED OUT OF WELD JOINTS. STEEL RENEWAL INCLUDING HULL, DECK PLACES, MACHINERY FOUNDATIOINS ETC. APPROXIMATE 30 TON STEEL TOBE RENEWED PAYMENT AT ACTUAL (STEEL SUPPLY BY NAVY AND LOADING/UNLOADING/TRANSPORT BY SHIPYARD)
HEAVY UNDULATION OBSERVED ON FOXLE STBD SIDE. STEEL RENEWAL TO BE UNDERTAKEN BASED ON NSRY SURVEY REPORT. QTY- 03 SQ MTR
DECK PIECE OF FRESH WATER POINT ON BOAT DECK BELOW STBD FWD LCA DAVIT CORRODED, THINNED AND HOLED. TO BE RENEWED IN SITU. QTY-01
DECK REPAIRS/ STEEL RENEWAL TO BE UNDERTAKEN ON DECK ADJOINING PORT AFT LCA DAVIT FOUNDATION. POST REPAIR DPT TO BE UNDERTAKEN
BLANKING TO BE UNDERTAKEN AT THE FOLLOWING LOCATIONS: (A) UNDERWATER HULL - 20 SQMTR (B) WEATHER DECK/ SUPERSTRUCTURE - 25 SQMTR
RENEWAL OF TOP COAT PAINT TO BE UNDERTAKEN AT FOLLOWING LOCATIONS. (A) BOOT TOP - 850 SQMTR (B) TOPSIDES - 1250 SQMTR (C) SUPERSTRUCTURES - 2700 SQMTR (D) WEATHER DECK - 2400 SQMTR
VEHICLE RAMP FLEXIBLE RUBBER DURET CRACKED / HOLED AND LEAKING, TO BE RENEWED. MAT FLEXIBLE RUBBER DURRET, DIA- 100MM, LENGTH 1.5M
WELDING OF VEHICLE RAMP TO BE UNDERTAKEN. POST WELDING DPT AND HOSE TEST TO BE UNDERTAKEN.
CHECK DRAUGHT MARKS ARE IN POSITION (BR 3001 CHAP 28 ART 2811, CARRY OUT PAINTING AS PER BR 3939 CHAPTER 7 ART 0580).
SERVICEABILITY CHECKS OF DAN BUOY TO BE CARRIED OUT.
AL STANCHION SHOE ALONG WITH STANCHION OF SHIPS BROW TO BE REPAIRED. QTY- 2 (10 EACH)
ABNORMAL DEFECT OBSERVED FROM GEAR BOX.GEAR BOX TO BE OPENED AND REPAIRS TO BE CARRIED OUT
FOLLOWING WORKS TO BE CARRIED OUT ON GP WINCH:
INSPECT WORM GEAR AND WHEEL FOR WEAR AND DEFECTS.
INSPECT SPUR GEAR AND PINION.
REPLACE HAND BRAKE LINING.
DEGUTTING AND REMOVAL OF PORT AND STBD ACCOMMODATION LADDER (WORK INVOLVES DEGUTTING AND REGUTTING OF LAGGING)
FOOT STEPS OF SS AND JS BATHROOM OBSERVED THINNED CORRODED AND HOLED TO BE RENEWED.
CHEMICAL CLEANING OF ATU FINS AND COILS IS TO BE UNDERTAKEN.
BLOW THROUGH OF TRUNKING WITH COMPRESSED AIR / AUTOMATIC ROBOTIC CLEANING BE UNDERTAKEN TO VENTILATION TRUNKINGS AS INDICATED BY SS.
CLIPS, HINGES OF 10 WT DOORS WORN OUT TO REPAIRED.
CLIPS, HINGES OF 12 WT HATCHES WORN OUT TO REPAIRED.
FULL PAINT SCHEME RESTORATION OF REPAIRED SEA CHESTS TO BE UNDERTAKEN I.A.W NO 53/16
DEGUTTING AND REMOVAL OF FOLLOWING OF PORT & STBD SINGLE ARM DAVIT SLEWING MOTOR
HOISTING MOTOR
STEEL WIRE ROPE
DAVIT ARM
FOUNDATION
GEAR BOX
CONTROL PANEL
OPERATING PANEL
DEGUTTING AND REMOVAL OF TANK HAULING CAPSTAN TO BE UNDERTAKEN
DRAIN LINES AT VARIOUS LOCATIONS THINNED, HOLED DAMAGED. TO BE RENEWED
DEGUTTING AND REMOVAL OF AMMINITION DAVIT.
INDICATED SAFETY NETS WORN OUT, DAMAGED.TO BE RENEWED.
SAFETY NET FRAMES CORRODED,THINNED AND HOLED. TO BE RENEWED
ABNORMAL NOISE OBSERVED FROM ATU-4.TO BE REPAIRED
DEGUTTING AND REMOVAL OF FOLLOWING ITEMS OF HTS PULLEY
MOTOR
STEEL WIRE ROPE
GEAR BOX
TRACK WAY
TRAVERSING EQUIPMENT
PNEUMETIC CYLINDER
JUNCTION BOX
SOFT NEOPRENE SEAL ON BOTTOM STRIP OF HANGER SHUTTER DAMAGED. TO BE RENEWED.
OIL LEAKAGE FROM SEALS OF HOIST GEARBOX. SEALS TO BE RENEWED
DEGUTTING AND REMOVAL OF LANDING GRID. DEGUTTING INVOLVES OPENING/ CUTTING OF NUT BOLTS AND REMOVAL OF GRID . REGUTTING INVOLVES BLANKING OF THE AREA WITH MS FOLLOWED BY DPT. APPROX BLANKING AREA 3 SQMTR.
JERKY MOVEMENT OF HANGER SHUTTER WHILE OPERATION. TO BE REPAIRED
FREE FALL ARRESTER MECHANISM IN MANUAL OPERATION OF HELO HANGER DEFECTIVE. TO BE REPAIRED
INDICATED WT DOOR JAMMED AND MIS-ALIGNED. TO BE REPAIRED
WT DOOR ON BOTH FUNNEL JAMMED AND NOT OPENING.HEATING ASSISTANCE REQUIRED FOR EASING AND OPENING OF DOOR.
AUTO LOCKING ARRANGEMENT OF INDICATED WT DOORS DAMAGED. TO BE REPAIRED
AUTO TENSIONING SPRING MECHANISM OF INDICATED WT HATCHES ON WEATHER DECK DEFECTIVE. TENSIONING OF SPRINGS TO BE UNDERTAKEN
VERTICAL LADDER ON FUNNEL CORRODED,THINNED AND HOLED. TO BE RENEWED
HEAVY CORROSION AND THINNING OBSERVED ON INDICATED LOCATION ON FUNNEL. TO BE REPAIRED
DRAIN LINE OF FUNNEL DECK THINNED AND HOLED.TO BE RENEWED
CARRY OUT SERVICEABILITY CHECKS OF ALL SHIPS HUSBANDARY TOOLS FOR DE-EQUIPPING/ DESTORING
5" ANGLE GRINDER
7" ANGLE GRINDER
VACUUM CLEANER
ELECTRIC GRINDER
CORDLESS DRILLING MACHINE
INDUSTRIAL VACUUM CLEANER
CHIPPING HAMMER KIT
WOODEN PLANNER
CORDLESS IMPACT WRENCH
POWER BIT SET
101 PIECE MECHANIC TOOL SET
HEAVY DUTY CUTTER
HYDRAULIC NUT CRACKER
SMART KIT
DEGUTTING AND REMOVAL OF 108 KIT LOCKERS IN MESSES TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF 108 BUNKS IN SAILORS MESSES TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF 15 OVERHEAD LOCKERS TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF 08 WASH BASINS FITTED AT VARIOUS PLACES TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF STOWAGE RACKS IN MAGAZINE TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF 15 BUNKS IN OFFICERS CABINS TO BE UNDERTAKEN.
DECK COVERING DAMAGED/BULGED AT 12 LOCATIONS, TO BE RENEWED.
TOP COAT OF DECK COVERING DAMAGED AT VARIOUS WET COMPARTMENTS,TO BE RENEWED (APPROX AREA 150 SQM)
SPINDLE OF MUSHROOM HEAD WHEEL JAMMED, TO BE EASED.
RUBBER BEADING OF MUSHROOM HEADS OBSERVED PERISHED TO BE RENEWED.
RUBBER BEADING OF VENTILATION FLAPS OBSERVED DAMAGED TO BE RENEWED.
DEGUTTING AND REMOVAL OF EXHAUST OF TANK SPACE TO BE UNDERAKEN. POST REMOVAL AREA TO BE BLANKED. APPROX AREA FOR BLANK IS 20 SQM EACH
EXHAUST OF EDA OPENING TO BE BLANKED.
RUBBER BEADING OF EMERGENCY ESCAPE OBSERVED DAMAGED TO BE RENEWED. WATER HOSE TEST TO BE UNDERTAKEN POST RENEWALOF RUBBER BEADING.
PVC GUARD RAIL ALONGWITH STAINLESS STEEL TULIP CRIMMPED ON BOTH END OBSERVED DANMAGED AT INDICATED LOCATION TO BE RENEWED. QTY-11, APPROX LENGTH OF EACH PVC GUARD RAIL IS 06 METER.
STANCHION SHOE OF PVC GUARD RAIL OBSERVED DAMAGED AT 08 LOCATION TO BE REPAIRED IN SITU (WORK INVOLVES DEGUTTING AND REGUTTING OF LAGGING)
STANCHION OF FIXED GUARD RAIL OBSERVED DAMAGED AT 08 LOCATION TO BE REPAIRED IN SITU. MAT-MS
DEGUTTING AND REMOVAL OF EXHAUST OF BREATHERS TO BE UNDERAKEN. POST REMOVAL AREA TOBE BLANKED.
LOCKING MECHANISM AND HINGE FLYCO DOOR OBSERVED DEFECTIVE TO BE REPAIRED.
HEAVY CORROSION OBSERVED IN BALLAST TANK 27(S) BETWEEN FR ST. 46 TO 46 ½ NEAR KEEL AREA SUPPORTING FRAME. REPAIR OF SAME TO BE UNDERTAKEN.
HEAVY CORROSION OBSERVED IN MER BETWEEN FR ST 39 ½ TO 40 (P) JUST BELOW WATER LINE. REPAIR OF SAME TO BE UNDERTAKEN.
METALLIC SCUPPERS AT 06 LOCATION ON WEATHER DECK CORRODED AND PERISHED .TO BE RENEWED.
RUBBER SCUPPERS AT SCATTERED LOCATION ON WEATHER DECK OBSERVED PERISHED .TO BE RENEWED.
SPRING MECHANISM OF HATCH OF JIGGER WINCH COMPARTMENT OBSERVED DEFECTIVE TO BE REPAIRED.
ROLLER FAIRLEAD OBSERVED JAMMED AND NOT ROTATING TO BE REPAIRED.
FOLLOWING WORK ON CARGO HATCH TO BE UNDERTAKEN. (WORK INVOLVES DEGUTTING AND RE-GUTTING OF LAGGING) PERMANENT WELDING OF CARGO HATCH TO BE UNDERTAKEN.
POST WELDING DPT TO BE UNDERTAKEN.
DEGUTTING AND REMOVALOF CARGO WINCH TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF CONTROL PANEL CARGO WINCH TO BE UNDERTAKEN.
FRESH WATER PIPE LINE OF JS AND SS BATHROOM OBSERVED CORRODED THINNED AND HOLLED. TO BE RENEWED. MAT-GI PIPE, APPROX QTY-50 MTR
DECUTTING AND REMOVALOF VENTILATION BLOWER OF MER COMPARTMENT. POST REMOVAL,BLANKING OF THE SAME TO BE UNDERTAKEN.
DEGUTTING AND REMOVAL OF UNUSED FOUNDATION TO BE UNDERTAKEN AT INDICATED LOCATIONS.
LOADTEST OF FOLLOWING DUE. TO BE CARRIED OUT ANCHOR STROPS DECK EYE
PVC GUARD RAIL
BOTTLE SCREW DECK EYE QUARTER DECK
CARGO NET PP ROPE 24 MM
CARGO NET PP ROPE 28 MM
BOTTLE SCREW DECK EYE FOXLE
SCRAMBLE NET
ANCHOR STROPS
ANCHOR CAPSTAN
HELO DECK SAFETY NET
LEADSMAN PLATFORM
ESCAPE LADDER
TOWING SLIP
TOWING SHACKLES
TOWING PENDANT 48 MM FSWR
AFT GP WINCH
DEGUTTING AND REMOVAL OF FOLLOWING TO BE UNDERTAKEN . SALUTING GUN
SMALL ARM POST
CHIP AND CLEAN ALL TANK TOPS,BILGES OF MACHINERY SPACES AND OTHER ACCESSIBLE INTERNAL SURFACES OF UNDERWATER HULL UP TO AND INCLUDING AREA 500 MM ABOVE BOOT TOP LINE AND CARRY OUT SURVEY & REPAIR OF SUSPECTED/ DEFECTIVE AREAS. QUOTE FOR STEEL RENEWAL OF 20 TONS AND USG GUAGING OF 3000 POINTS. (SURVEY ASSISTANCE WILL BE PROVIDED BY NSRY(KOC), STEEL NAVY SUPPLY) PAYMENT AT ACTUAL
STAGING FOR THE ENTIRE REPAIR PACKAGE
RENEW SS STRIPS OF DEFECTIVE RAILS.
CARRY OUT SERVICEABILITY CHECKS OF ALL TRACKS , ROLLERS, PULLEYS, ROPES AND FASTENER OF TRACKS. ROLLERS- 06 PULLEYS - 04 ROPE - 150 MTR FASTENERS - 600
CLEAN OUT AND EXAMINE STRUCTURES, PAYING PARTICULAR ATTENTION TO THE JUNCTION OF TRANSVERSE AND LONGITUDINAL FRAMES, OUTER BOTTOM PLATINGS , RIVETS AND SPECIALLY AREAS NOT READILY VISIBLE SUCH AS THE BACK OF FRAMING AND STIFFENERS. 6000 (13 TANKS)
ENGINEERING
Degutting and removal of Main Engine. Dimensions of engines to be removed through technical window. L- 510 CM W- 280 CM H- 310 CM (MER)
(a) Technical window required for degutting and removal of both main engines in MER port and STBD side. (MER) - 02 Nos
(b) Removal of system pipe line - 54 Nos.(162 mtr approx)
(c ) Removal of system valves - 36 Nos.
(d) Area to be covered-05 Sq.Mtr each(Approx),Mat-MS
(e) work involves degutting and regutting of laggings
(f) Regutting of technical window and DP test & water hose test to be carried out.
(g) Restoration of paint scheme extant.
Degutting and removal of Control Air Compressor. Dimensions of control air compressor. L- 200 CM W- 110 CM H- 100 CM (COMPRESSOR ROOM) (a) Degutting and Removal of control air compressor with motor including starting panel. (Compressor room) (i) compressor-01 Nos. (ii) Motor- 01 Nos. (III) Starting panel-01
(b) Lines to be degutted - 11 Nos.(55 mtr approx)
(c) Valves to be removed - 05 Nos.
Dimensions of compressor- L- 200 CM W- 110 CM H- 100 CM (COMPRESSOR ROOM) (a) Degutting and removal of control air compressor with motor including starting panel-01 (Compressor Room) (i) compressor-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01
(a) Lines to be degutted -09 Nos.(54 mtr approx)
(b) Valves to be removed - 05 Nos.
Degutting and removal. Dimensions of steering gear system- L- 510 CM W- 220 CM H- 150 CM (ASP) (a) Degutting and removal of steering gear system - 01 Nos. (ASP)
(b) Removal of system pipe line - 22 Nos.(110 mtr approx)
(c) Removal of system valves - 08 Nos.
(d) Removal of lub oil tank - 02 Nos
Degutting and removal. Dimensions of CPP pump- L- 90 CM W- 50 CM H- 40 CM (MER) (a) Degutting and removal of CPP main pump(gear driven) - 02 Nos
(b) Cover required - 02 Nos.(100 mm dia approx)
(c) Lines to be degutted - 08 Nos.(32 mtr approx)
(d) Valves to be removed - 04 Nos
(e) lines to be blanked - 04 Nos.(80 mm and 65 mm approx)
Degutting and removal. Dimensions of CPP pump with motor- L- 120 CM W- 50 CM H- 50 CM (MER) (a) Degutting and removal of CPP pump with motor including starting panel (i) Pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 78 Nos.(235 mtr approx)
(c) Valves to be removed - 26 Nos
(d) lines to be blanked - 12 Nos.(50 mm,32 mm,25 mm approx)
Dimensions of pump with motor- L- 110 CM W- 60 CM H- 70 CM (MER) (a) Degutting and removal of CPP pump with with motor including starting panel (i) pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 24 Nos.(120 mtr approx)
(c) Valves to be removed - 18 Nos.
(d) lines to be blanked - 12 Nos.(32 mm and 25 mm approx)
Dimensions of pump with motor- L- 110 CM W- 70 CM H- 60 CM (MER) (a) Degutting and removal of stand by gear box pump with motor including starting panel. (i) Pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 16 nos(80 mtr approx)
(c) Valves to be removed - 06 Nos
(d) Lines to be blanked - 04 Nos.(40 mm,32 mm approx)
Dimensions of centrifuge- L- 220 CM W- 150 CM H- 170 CM (MER) (a) Degutting and removal of lub oil centrifuge with motor including starting panel (i) Centrifuge-02 Nos. (ii) Motor- 02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 22 Nos.(100 mtr approx)
(c) Valves to be removed - 08 Nos.
(d) Lines to be blanked - 08 Nos.(40 mm,32 mm,25 mm approx
Dimensions of pump with motor L- 140 CM W- 150 CM H- 220 CM (MER) (a) Degutting and removal of stand by fresh water pump with motor including foundation and starting panel. (i) Pump-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01
(b) Cover required -1.5sq mtrs
(c) Lines to be degutted - 26 Nos.(110 mtr approx)
(d) Valves to be removed-16
(e) Lines to be blanked-06
(f) Relief valve to be removed-01
Dimensions of pump with motor- L- 140 CM W- 150 CM H- 220 CM (MER) (a) Degutting and removal of stand by lub oil pump with motor including foundation and starting panel (i) Pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Cover required - 1.5sq.mtrs
(c) Lines to be degutted - 18 Nos.(90 mtr approx)
(d) Valves to be removed - 12 Nos
(e) Lines to be blanked - 06 Nos.(150 mm,125 mm approx)
(f) Relief valve to be removed - 02 Nos.
Dimensions of pump with motor- L- 120 CM W- 140 CM H- 220 CM (MER) (a) Degutting and removal of stand by fresh water pump with motor including foundation and starting panel (i) Pump-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01
(b) Cover required - 1.5sq.mtrs
(c) Lines to be degutted - 22 Nos.(110 mtr approx)
(d) Valves to be removed - 18 Nos.
(e) lines to be blanked - 08 Nos.(150 mm,125 mm approx)
(f) relief valve to be removed - 01 Nos.
Dimensions of pump with motor- L- 110 CM W- 60 CM H- 50 CM (MER) (a) Degutting and removal of stand by fuel booster pump with motor including starting panel. (i) pump-01 Nos. (ii) motor-01 Nos. (III) Starting panel-01
(b) Lines to be degutted - 36 Nos.(180 mtr approx)
(c) Valves to be removed - 12 Nos
(d) Lines to be blanked - 08 Nos.(32 mm,25 mm)
Dimensions of pump with motor- L- 110 CM W- 60 CM H- 50 CM (MER) (a) Degutting and removal of fuel booster pump with motor including starting panel (i) pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 26 Nos.(130 Mtr approx)
(c) Valves to be removed - 06 Nos.
(d) Lines to be blanked - 06 Nos.(32 mm,25 mm)
Dimensions of pump with motor- L- 110 CM W- 60 CM H- 50 CM (Stern Gland Compartment) (a) Degutting and removal of stern tube lub oil pump with motor including starting panel (i) Pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 36 Nos.(120 Mtr approx)
(c) Valves to be removed - 12 Nos.
(d) Lines to be blanked - 12 Nos.(40 mm,32 mm,25 mm approx)
(e) Removal of lub oil tank - Tank-02 Nos. (3 sq. mtr of each tank approx)
Dimensions of pump with motor- L- 110 CM W- 60 CM H- 50 CM (MER) (a) Degutting and removal of nozzle cooling pump with motor including starting panel. (i) pump-03 Nos. (ii) Motor-03 Nos. (III) Starting panel-01
(b) Lines to be degutted - 32 Nos.(160 mtr approx)
(c) Valves to be removed - 12 Nos.
(d) Lines to be blanked - 08 Nos.(32 mm,25 mm)
Dimensions of pump with motor- L- 90 CM W- 50 CM H- 50 CM (MER) (a) Degutting and removal of rocker gear luboil pump with motor including starting panel . (i) Pump-02 Nos. (ii) Motor- 02 Nos. (III) Starting panel-01
(b) Cover required - 02 Nos.(100 mm approx)
(c) Lines to be degutted - 08 Nos(65 mtr approx)
(d) Valves to be removed - 04 Nos.
(e) Lines to be blanked-(25 mm) - 04 Nos.(32 mm,25 mm)
Dimensions of pump with motor- L- 130 CM W- 80 CM H- 50 CM (AER) (a) Degutting and removal of fuel oil transfer pump with motor including starting panel . (i) Pump- 02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Lines to be degutted - 12 Nos.(65 mtr approx)
(c) Valves to be removed - 08 Nos.
(d) Lines to be blanked - 04 Nos.(65 mm,50 mm)
Dimensions of gear box- L- 210 CM W- 170 CM H- 190 CM (MER) (a) Degutting and removal of gear box - 02 Nos
(b) Lines to be degutted - 32 Nos. (45 mtr approx)
(c) Lines to be blanked - 12 Nos.(50 mm,40 mm)
(d) Cover required - 02 Nos.(5 sq.mtr,approx),Mat-MS
Degutting and Removal of 08 propeller blade and propeller hub of both shaft. Cleaning of the same to be undertaken. Blanking/covering not required. Blade-08 Nos. propeller hub-02 Nos. (Shafting)
(a) Blanking to be done internally and externally - 02 Nos.(Dia-65 cm approx)
(b) Dp test and water hose test to be carried out post blanking.
(c) Restoration of paint scheme extant. (Shafting)
(a) Degutting and removal of steering gear pump with motor including foundation and starting panel - 02 Nos each. (ASP)
(b) Dimensions of pump with motor L- 90 CM W- 100 CM H- 150 CM
(c) Starting panel-01
(a) Degutting and removal of shaft locking gear - 02 Nos. (MER)
(b) Both are mechanical type can be removed by removing split pin - 02 Nos.
(a) Degutting and removal of shaft brake - 02 Nos. (MER)
(b) Both are mechanical type can be removed with foundation bolted on foundation-(Hot work assistance required) - 02 Nos.
Dimensions of OD Box- L- 110 CM W- 80 CM H- 70 CM (MER) (a) Degutting and removal of oil distribution box - 02 Nos.
(b) Lines to be degutted-(25 mm) - 32 Nos.(165 mtr approx)
(c) Lines to be blanked - 08 Nos.
Dimensions of plummer block- L- 50 CM W- 60 CM H- 80 CM (MER) (a) Degutting and removal of plummer block - 02 Nos
(b) Lines to be degutted - 02 Nos.(12 mtr approx)
Dimensions of bulkhead gland- L- 110 CM W- 90 CM H- 120 CM (MER) (a) Degutting and removal of bulkhead gland - 02 Nos.
(b) Cover/blank required-(Mat-MS) - 02 Nos.(OD-45 CM)
(c) Lines to be degutted - 12 Nos.(65 mtr approx)
(d) Dp test and water hose test to be carried out post blanking.
(e) Restoration of paint scheme extant.
(a) Degutting and removal of torsion meter including indication panel-02 02 Nos. (Stern Gland Compartment) (a) Clamp shaped, ID - 280mm
Dimensions of reservoir- L- 220 CM W- 150 CM H- 150 CM (Compressor Room) (a) Degutting and removal of control air reservoir - 02 Nos.
(b) Removal of chest valve - 04 Nos.
(c) Removal of system line - 12 Nos.(60 mtr approx)
Dimensions of reservoir- L- 380 CM W- 250 CM H- 180 CM (Compressor Room) (a) Degutting and removal of start air reservoir - 02 Nos.
(b) Removal of chest valve - 04 Nos.
(c) Removal of system line - 16 Nos.(80 mtr approx)
Dimensions of cooler- L- 320 CM W- 90 CM H- 80 CM (MER) (a) Degutting and removal of fresh water cooler - 02 Nos.
(b) Removal of system line - 16 Nos.(50 mtr approx)
(c) Removal of system valve - 08 Nos.
(d) Blanking to be done - 04 Nos.(150 mm,125 mm)
Dimensions of cooler- L- 320 CM W- 90 CM H- 80 CM (MER) (a) Degutting and removal of lub oil cooler - 02 Nos
(b) Removal of system line - 12 Nos.(35 mtr approx)
(c) Removal of system valve - 08 Nos.
(d) Blanking to be done - 04 Nos.(150 mm,125 mm)
Dimensions of seal- L- 110 CM W- 90 CM H- 120 CM (Stern Gland Compartment) (a) Degutting and removal of stern tube seal - 02 Nos
(b) blanking to be done internally and externally - 02 Nos.(OD-45 CM)
(c) Lines to be degutted - 10 Nos.(50 mtr approx)
(d) Dp test and water hose test to be carried out post blanking.
(e) Restoration of paint scheme extant.
(a) Degutting and removal of witchita clutch - 02 Nos. Clutch to be dismantlled. Dimensions of clutch - Dia-120 cm(approx) (MER)
(B) Lines to be degutted - 04 Nos.(15 mtr approx)
(C) Area to be covered-3 Sq.Mtr(approx),Mat-MS - 3sq.mtrs
(a) Degutting and removal of geislinger coupling - 02 Nos. To be decoupled. Dimensions- Dia-250 cm(approx) (MER)
(c) Lines to be degutted - 04 Nos.(15 mtr approx)
(e) Area to be covered-3 Sq.Mtr(approx),Mat-MS - 3 sq.mtrs
Degutting and removal of DA. Dimensions of prime mover with alternator- L- 350 CM W- 150 CM H- 250 CM (MER) (a) Technical windowrequired in MER(PORT) side for removal of DA with alternator (i) Prime mover-02 Nos. (ii) Alternator - 02 Nos
(b) starting/stopping panel - 04 Nos.
(c) Lines to be degutted - 22 Nos.(120 mtr approx)
(d) Lines to be blanked - 12 Nos.(65 mm,50 mm,40 mm)
(e) Removal of valves - 18 Nos.
(f) Area to be covered - 3 sq. Mtrs. Approx
Degutting and removal of DA. Dimensions of prime mover with alternator- L- 350 CM W- 110 CM H- 170 CM (AER) (a) Technical window required in AER(STBD) side for degutting and removal of DA prime mover with alternator (i) prime mover-02 Nos. (ii) Alternator-02 Nos.
(b) Starting/stopping panel - 04 Nos.
(c) Lines to be degutted - 20 Nos.(120 mtr approx)
(d) Lines to be blanked - 14 Nos.(65mm,50 mm,40 mm)
(e) Removal of valves - 12 Nos.
(f) Area to be covered-2 Sq.Mtr each(approx),Mat-MS - 2 sq.mtrs
(g) work involves degutting and regutting of laggings
(h) Regutting of technical window and DP test & water hose test to be carried out.
(j) Restoration of paint scheme. (AER)
Dimensions of prime mover with alternator- L- 280 CM W- 100 CM H- 160 CM (Mission DA Compartment) (a) Technical window required in mission DA compartment.
(b) Degutting and removal of DA prime mover with alternator (i) Prime mover-02 Nos. (ii) Alternator-02 Nos.
(c) starting/stopping panel - 02 Nos.
(d) Lines to be degutted - 12 Nos.(35 mtr approx)
(e) Lines to be blanked - 06 Nos.(32 mm,25 mm)
(f) Removal of valves - 04 Nos.
(h) work involves degutting and regutting of laggings.
(j) Regutting of technical window and DP test & water hose test to be carried out.
(k) Restoration of paint scheme.
Dimensions of prime mover with alternator- L- 150 CM W- 100 CM H- 120 CM (EDA COMPARTMENT) (a) Degutting and removal of DA prime mover with alternator (i) Prime mover-01 Nos. (ii) Alternator-01 Nos.
(b) starting/stopping panel - 01 Nos.
(c) Lines to be degutted - 04 Nos.(15 mtr approx)
(d) Lines to be blanked - 02 Nos.(32 mm,25 mm)
(e) Removal of valves - 02 Nos.
Dimensions of compressor with motor- L- 180 CM W- 110 CM H- 140 CM (COMPRESSOR ROOM) (a) Degutting and removal of HP air compressor with motor including starting panel
(b) Lines to be degutted - 04 Nos.(20 mtr approx)
(c) System valves to be removed - 04 Nos.
Dimensions of compressor- L- 180 CM W- 110 CM H- 140 CM (Compressor Room) (a) Degutting and removal of HP air compressor including starting panel. (i) Compressor-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01
(c) Lines to be degutted - 04 Nos.(25 mtr approx)
(d) System valves to be removed - 04 Nos
Dimensions of compressor- L- 180 CM W- 110 CM H- 140 CM (Compressor Room) (a) Degutting and removal of DD air compressor including starting panel (i) Compressor-01 Nos. (ii) Engine-01 Nos. (III) Starting panel-01
(c) Lines to be degutted - 06 Nos.(35 mtr approx)
(d) System valves to be removed -02Nos.
Dimensions- L- 250 CM W- 150 CM H- 120 CM (Tank Space) (a) Degutting and removal of Sulzar air compressor with motor including starting panel. (i) Compressor-01 Nos (ii) Motor-01 Nos. (III) Starting panel-01
(c) Lines to be degutted-(25 mm) - 32 Nos.(165 mtr approx)
(d) System valves to be removed - 02 Nos.
Dimensions- L- 250 CM W- 110 CM H- 140 CM (Compressor room) (a) Degutting and removal of start air reservoir - 02 Nos.
(b) Removal of chest valve -04 Nos
(c) Removal of system line - 16 Nos.(80 mtr approx)
Dimensions of each bottles- L- 60 CM W- 50 CM H- 220 CM (CO2 Compartment) (a) Degutting and removal of Of CO2 bottles -25 Nos
(b) Removal of gang release piston - 02 Nos.
(c) Wire ropes to be dismantlled - 25 Nos.
(d) Disconnect the flexible hoses - 04 Nos.
(e) Removal of system valves - 25 Nos.
(f) Bottle valves to be covered with cap
Dimensions- L- 150 CM, W- 80 CM , H- 50 CM (MER) (a) Degutting and removal of fresh water cooler - 02 Nos.
(b) Removal of system line - 16 Nos.(65 mtr approx)
(c) Removal of system valve - 08 Nos.
(d) Blanking to be done - 04 Nos.(150 mm,125 mm)
(a) Pump to be retained view AC plant requirement onboard. (AC compartment)
(b) Overhauling of pump with motor to be undertaken . (i) Pump-02 Nos., (ii) Motor-02 Nos., (III) Starting panel-01
(a) Pump to be retained view AC plant requirement onboard. (AC compartment)
(b) Overhauling of pump with motor to be undertaken. (i) Pump-02 Nos., (ii) Motor-02 Nos., (III) Starting panel-01, (ii) Motor-02 Nos., (III) Starting panel-01
Degutting and removal. Dimensions of AC plant- L- 210 CM, W- 125 CM, H- 200 CM (AC Compartment) (a) Technical window required for degutting and removal of AC Plant in AC compartment port side
(b) Removal of AC plant including motor with starting panel - (i) Compressor- 02 Nos, (ii) Motor-02 Nos., (III) Starting panel-01
(c) Degutting of sea water pipe line - 06 Nos.(12 mtr approx)
(d) Degutting of chilled water pipe line - 06 Nos.(15 mtr approx)
(e) valves to be removed 02 Nos.
(f) valves to be removed - 08 Nos
(g) Degutting and removal of condenser and chiller unit from AC plant - .(i) Condenser-02 Nos., (ii) Chiller-02 Nos.
(h) work involves degutting and regutting of laggings.
(j) Regutting of technical window and DP test & water hose test to be carried out.
(k) Restoration of paint scheme.
(a) Plant to be retained for habitability of ship.
Degutinng and removal. Dimensions of Ref plant with motor L- 170 CM W- 100 CM H- 90 CM (AC Compartment) (a) Degutting and removal of Ref plant including motor with starting panel. (i) Compressor-02 Nos (ii) Motor-02 Nos. (III) Starting panel-01
(b) Degutting of sea water pipe line - 08 Nos.(25 mtr approx)
(c) valves to be removed 04 Nos.
(d) Degutting and removal of condenser and receiver unit from REF plant. (i) Condenser-02 Nos. (ii) Receiver-02 Nos.
Degutting and removal. Dimensions of each ro plant- L- 140 CM W- 135 CM H- 200 CM (AER) (a) Degutting and removal of pre filter pump with motor. (i) pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) Degutting and removal of system lines -18 Nos.(95 mtr approx)
(c) Degutting and removal of system valve - 06 Nos.
(d) Removal of plant including starting/stopping panel - 02 Nos.
(e) Degutting and removal of of DT module - DT Module-12 Nos.
(f)Area to be covered - 3 sq. Mtrs(approx)
Degutting and removal. Dimensions of FSU with motor- L- 210 CM W- 110 CM H- 120 CM (FSU Compartment(P&S)) (a) Degutting and removal of sea water pipe line - 06 Nos.(35 mtr approx)
(b) Valves to be removed - 08 Nos.
(c) Degutting and removal of FSU with motor including starting panel (i) Compressor- 02 Nos (ii) Motor-02 Nos. (III) Starting panel-01
Degutting and removal. Dimensions of pump with motor- L- 110 CM W- 80 CM H- 90 CM (MER & AER) (b) Degutting and removal of pump with motor including starting panel (i) Pump-03 Nos. (ii) Motor-03 Nos. (III) Starting panel-01
(c) Lines to be removed - 24 Nos.(120 mtr approx)
(d) Valves to be removed - 09 Nos.
(e) Area to be covered - 1 sq.mtr(approx)
Degutting and removal. Dimensions of centrifuge - L- 210 CM W- 100 CM H- 110 CM (a) Degutting and removal of fuel oil centrifuge with motor including starting panel (i) Centrifuge-02 Nos. (ii) Motor- 02 Nos. (III) Starting panel-01
(c) Lines to be degutted - 22 Nos.(80 mtr approx)
(d) Valves to be removed - 08 Nos.
(e) Lines to be blanked - 08 Nos.(32 mm,25 mm)
(a) Pump with Motor to be retained to maintain fire fighting capability of ship. (i) Pump-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01 (Port Fwd Ballast Pump Room). Overhauling of pump with motor to be undertaken.
Degutting and removal. Dimensions of pump with Motor- L- 120 CM W- 110 CM H- 250 CM (AER) (a) Degutting and removal of fire pump with motor including foundation and starting panel (i) Pump-01 Nos (ii) Motor-01 Nos. (III) Starting panel-01
(b) System line to be removed - 04 Nos.(15 mtr approx)
(c) Lines to be blanked - 04 Nos.(100 mm,65 mm)
(d) Area to be covered - 1 sq mtrs
Degutting and removal. Dimensions of pump with motor- L- 110 CM W- 90 CM H- 80 CM (AVCAT Compartment)
(a) Degutting and removal of Avcat pump with motor including starting panel (i) Pump-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01
(b) System line to be removed - 16Nos(80 mtr approx)
(c) Lines to be blanked08 Nos.
Degutting and removal. Dimensions of pump with motor- L- 110 CM W- 90 CM H- 80 CM (AVCAT Compartment) (a) Degutting and removal of Avcat pump with motor including starting panel (i) Pump-01 Nos. (ii) Motor-01 Nos. (III) Starting panel-01
(b) System line to be removed - 16 Nos(45 mtr approx)
(c) Lines to be blanked- 08 Nos(65 mm,50mm)
Degutting and removal. Dimensions of pump with motor- L- 210 CM W- 90 CM H- 80 CM (Tank Space) (a) Degutting and removal of cargo fresh water pump with motor including starting panel (i) Pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) System line to be removed - 12 Nos(65 mtr approx)
(c) Lines to be blanked - 04 Nos.(125 mm,100mm)
Degutting and removal. Dimensions of pump with motor- L- 210 CM W- 90 CM H- 80 CM (Tank Space) (a) Degutting and removal of cargo fuel transfer pump with motor including starting panel - (i) Pump-02 Nos. (ii) Motor-02 Nos. (III) Starting panel-01
(b) System line to be removed - 22 Nos(110 mtr approx)
(c) Lines to be blanked - 04 Nos.(125 mm,100mm)
Degutting and removal. Dimensions of OWS- L- 110 CM W- 120 CM H- 210 CM (AER) (a) Degutting and removal of OWS including starting panel - 01 Nos
(b) System line to be removed - 16 Nos.(80 mtr approx)
(c) Lines to be blanked - 04 Nos.(32 mm,25 mm)
(d) Area to be covered-2 Sq.Mtr(Approx),Mat-MS 2 sq.mtrs
Degutting and removal. Dimensions of drilling machine- L- 70 CM W- 90 CM H- 130 CM (Engg. Workshop) (a) Degutting and removal of drilling machine with motor including starting panel - 01 Nos.
Degutting and removal. Dimensions of lathe machine- L- 250 CM W- 120 CM H- 190 CM (Engg. Workshop) (a) Degutting and removal of lathe machine including starting panel - 01 Nos
Degutting and removal. Dimensions of grinding machine- L- 80 CM W- 50 CM H- 50 CM (Engg. Workshop) (a) Degutting and removal of grinding machine with motor including starting panel 01 Nos.
Degutting and removal. Dimensions of washing machine- L- 220 CM W- 100 CM H- 250 CM (Ships Laundry) (a) Degutting and removal of washing machine including starting panel. - 01 Nos.
(b) System lines to be removed - 06 Nos.(25 mtr approx)
Dimensions of drying tumbler- L- 220 CM W- 100 CM H- 250 CM (Ships Laundry) (a) Degutting and removal of drying tumbler including starting panel - 01 Nos
(b) System lines to be removed - 04 Nos.(20 mtr approx)
(a) Degutting and removal for removal of Sea chest valve. (MER)
(b) Sea chest to be blanked - 03 Nos.
(d) DP test & water hose test to be carried out post blanking.
(a) Degutting and removal of Sea chest valve. - 03 Nos. (MER)
(b) System lines to be removed - 16 Nos.(80 mtr approx)
(c ) Lines to be blanked - (i) Dia-200 mm(Qty-02 Nos.)
(a) Degutting and removal of Sea chest valve. - 02 Nos. (AER)
(b) Sea chest valve to be blanked- Dia-250 mm - ((Qty- 02 Nos.)
(c) DP test & water hose test to be carried out post blanking.
(d) Restoration of paint scheme extant.
(a) Degutting and removal of After Sea chest valve. - 02 Nos. (AER)
(b) Lines to be removed - 12 Nos.(60 mtr approx)
(c ) Lines to be blanked - Dia 250 mm(Qty-04 Nos.)
(a) Degutting and removal of Sea chest valve. - 03 Nos. (Ballast Pump room)
(b) Sea chest to be blanked - 03 Nos.(Dia-250 mm)
(c ) Lines to be removed - 08 Nos.(35 mtr approx)
(d) DP test & water hose test to be carried out post blanking.
(e) Restoration of paint scheme extant.
(a) Degutting and removal of after Sea chest valve - 04 Nos. (Ballast pump room)
(b) Lines to be removed - 08 Nos.(20 mtr)
(c ) Lines to be blanked - 04 Nos.(Dia -250 mm)
Blanking of overboard valves in MER compartment. (MER) (a) 150 mm - 03 Nos.
(b) 100 mm - 06 Nos.
(c ) 50 mm - 06 Nos
(d) 32 mm - 02 Nos.
(e) DP test & water hose test to be carried out post blanking.
Blanking of overboard valves in AER compartment
(a) 100 mm - 04 Nos.
(b) 50 mm - 02 Nos.
(c) DP test & water hose test to be carried out post blanking.
(d) Restoration of paint scheme extant.
(a) Overboard valve in AC compartment to be retained for operational availability of AC Plant. - 01 Nos (AC)
Blanking of overboard valves in ballast pump room compartments. (Ballast pump room) (a) 200 mm - 04 Nos.
(b) blanking to be carried out.
(c) DP test & water hose test to be carried out post blanking.
(d) Restoration of paint scheme extant.
(a) AC sea tube to be retained view operational availability of AC plant. - 01 Nos. (AC Compartment)
(a) Removal of rudder - 02 Nos. (Out Board). Cleaning of rudder to be carried out.
(b) Blanking to be carried out. DP test & water hose test to be done post blanking. dia 100 cm(approx)
(c) Restoration of paint scheme extant.
ELECTRICAL
Degutting for removal of following items:- Antenna and scanner Unit (Main mast)
Slave Junction Boxes (Radar Office )
Display Unit (Bridge - 02, Ops Room - 02, Trainiee Bridge Wing - 02, FLYCO - 01)
Power Supply Unit for DCU (Radar Office )
DCU (Radar Office )
Inter Switch (Radar Office )
Interface Box (Radar Office )
Degutting for removal of transducer (210 kHz and 33 kHz), master units, VGA repeater units, LED repeater unit, cables and accessories. Transducers (Cofferdam/Hull)
Master Unit (Ops room)
VGA Repeater (Bridge)
LED Repeater (Bridge-01, MCR-)1)
Junction Box (Aft Tank space)
Degutting for removal of antenna, appliqué unit, cables, converter unit, cables and associates accessories. Applique Unit (Radar Office)
Antenna (Main Mast)
Frequency Converter (Radar Office )
Control Unit (Bridge)
Degutting for Removal of both gyros, control units, bearing repeater, display unit, Junction box, change over unit, cables and associates accessories. Master unit (Gyro compt)
Control unit (Gyro compt)
Operator unit (Gyro compt)
Power supply unit (Gyro compt-02, Bridge-02)
Change over unit (Gyro compt)
Change over box (Gyro compt)
Gyro JB (Gyro compt)
MG set & MG set starter (Gyro compt)
Nauto alarm unit (Seaman mess lobby-01,Bridge-01)
Gyro repeater Pelorus (Bridghe-01, ECP-01)
Repeaters (digital& compass) (ASP-01, Ops room -01, Bridge- 04, Bridge wing- 02,FLYCO-01)
Degutting for Removal of sensor from main mast (assistance of scaffolding), MIU, MFCR , displays in ops room, Bridge & FLYCO cables and associates accessories. MIU (Bridge)
NMEA converter(Bridge)
Sensors & JB (Main mast)
MFCR (FLYCO, Ops room, Bridge)
Degutting for Removal of Steering panel from bridge, ECP in bridge top, starter panel in ASP, Indication panel in MCR and ASP, cables and associates accessories. Screened TRF (ASP)
Local Alarm Indication Panel (ASP)
TRF 440/230 (ASP)
AC/DC Converter(ASP)
JB (ASP)
RAI &RAAI Feedback Unit And JB (ASP)
Pressure Switch (ASP)
Low Power JB (ASP)
Hand Wheel Control Panel (Bridge-01, ECP-01)
Alarm & Indication Panel & RAI (MCR)
degutting Removal of horizontal bars with support units from hanger top, control cubicles from FLYCO, inverted power supply and vertical gyro from Gyro compartment, cables and associates accessories. Inverted power supply unit (Gyro compt))
Vertical gyro (Gyro compt))
Connection JB (Gyro compt))
Control cubicles & power supply unit assembly rack– 01 (FLYCO)
Roll bar assembly with pedestal (Hanger top)
Degutting and Removal of transducer from U/W Hull. Removal of master units, RTU, repeaters FLCO, MCR, Ops Room & Bridge, Repeater power supply unit , junction box, cables and accessories. Master unit (Electrical Office)
RTU (Electrical Office)
Distribution unit (Electrical Office)
Junction box (Electrical Office)
CAL/TEST box (Electrical Office)
Repeater unit (MCR-01, Ops room -01, Bridge -01, FLYCO-01)
Transducer & JB (Cofferdam)
Degutting for removal of Horn assembly and valve unit from bridge top, control panel from bridge, cables and accessories. Horn & diaphragm with air valve assembly (Bridge top)
Control panel (Bridge)
Degutting for Removal of Horn assembly and valve unit from bridge top, control panel from bridge, cables and accessories. Horn & diaphragm with air valve assembly (Bridge Top)
Control panel (Bridge)
Degutting for Removal of ACU from forward switch board, junction boxes from 10 different locations, cables and accessories. (Cathodic control, Anodes – 4 + 4, RE – 4 + 4) ACU (Fwd Stbd)
RE JBs (rigging store 01, Stbd aft BPR 01, Paint store 01, Port aft BPR 01
ANODE JBs- 06 (port fwd STP compt-01, FOT(P) -01, AC compt lobby -01 Polaris mess -01, FOT(S)-01, Aft NBCD store lobby- 01)
Following SR routines to be undertaken:- 1.Clean and inspect shock /vibration mountings.2. Check performance of all the Amplifires.(AF Compt) 08 Amplifiers of 240 W each
Following SR routines to be undertaken:-Check the cable visually for proper shilding and earthing aspects to avoid capacity interference and magnetic fields. 2. Inspect the shock /vibration moutings visually for intactness of Necol lacquer and deterioration of rubbers. (Telephone Exchnage )
Degutting for the removal of amplifier rack, all five amplifiers , Speakers - 10 numbers from different locations , Junction box - 10 from different locations (05 Amplifiers of 120 W each)
Degutting for the removal of following items :- Whip Antenna (Hanger top, Flag deck)
ABTs (Hanger top, Flag deck)
TR 2400 Sets Rack (WT Office)
RCU (Bridge)
Degutting for the removal of following items :- Whip Antenna (Brideg Wings Port and Stbd)
EK 896 Set and rack (WT Office)
Degutting for the removal of following items :- PAE Sets (Ops Room - 03, V/U HF Compartment - 02)
Antenna (Main Mast)
RCUs (Bridge- 02 FLYCO -01)
Filter Rack (Ops Room-01, V/UHF -01)
Main Rack (Ops Room)
Degutting for the removal of following items :- Server (WT Office)
Display (Ops Room and bridge)
Client (Ops Room and bridge)
Degutting for the removal of following items :- Tx/ Rx Antenna Unit Bridge top)
PSU (Bridge)
Diplay Console (Bridge)
Degutting for the removal of following items :- Antenna ( Main mast)
UHF SATCOM Rack (Bridge)
RCU (Bridge)
Degutting for the removal of following items :- C Band Antenna (Hanger Top , Bridge Top)
Ku band Antenna (Bridge Top)
Rukmani Rack with acessories (Ops Room)
5 KVA UPS with batteries (Sick bay lobby )
Degutting for the removal of following items :- Antenna (Flag Deck)
Set (Brige )
Degutting for the removal of following items :- Antenna (Main Mast)
PSU (Bridge)
Set (Brige )
Degutting for the removal of following items :- Integrated Antenna (ECP)
AC / DC Converter (WT Office)
Degutting for the removal for DAT recorder unit (Ops Room)
Degutting for the removal of following items :- Inegrated Antenna (ECP)
Ac / DC Converter (WT Office)
Following SR Routines to be undertaken1. Carry out complete testing and tuning of the system as per Technical Manual Chapter -Service Manual . 2. Ensure all spare PCBs are tesed and stowed properly.
Degutting for the removal of following items :- Tx/ Rx Antenna Unit (Bridge Top)
PSU AC/ DC Converter (Bridge )
Following SR Routines to be undertaken 1. Carry out overhauling of Antenna.
SR Routines to be undertaken. Scope of works are as follows:- (a) Repair/ replacement of shock/ vibration mountings. (b) Replace the cables, indication lamps/ switches if deteriorated/ poor condition or damaged. (c) Examining cmponents for overheating / cracking and capacitors for leakage.(CMR)
SR Routines to be undertaken. Scope of works are as follows:- (a) Deteriorated tallies to be placed wth new tally. (b) Inspect switchboard cables/ wirings, lugs and connectors and other components. Examine the deterioration/ damage. Repair damaged insulation and recrimp lugs. Carry out repairs/ repairs and replace as necessary. (c) Remove panel instruments/ parameters to shop floor for calibration. Qty- 17 NOS. (d) Repair/ replacement of bus bar insulators as per necessity. (e) Examining of shock and vibretion mounts. (f) Functionality checks of switchboards with generator supply in presence of ships staff. (g) Lubrication of all mechanical linkage. (h) Functionality checks of all protection devices for its optimum performance. Repair/ replace the same if found defective. (j) Calibration of 12 ACBs ( 1000 A- 04, M/S Siemens, 630 A- 02, M/S Siemen, 880A- 06, M/S SCHNEIDER
Degutting for the removal of following items :- (Bridge top port and stbd) (a) Signalling projector port wih accessories
(b) Signalling projector stbd accessories (Bridge top port and stbd)
Degutting for the removal of following items(Helo hanger) :-
(a) Removal of MG set including de cupling the same.
(b) Removal of control panel with parameters.
(c) Removal of cables and accessories, fitted with.
(d) Degutting/ re-gutting of door for removal of convertor.
Degutting for the removal of following (HSC Room):- (a) Rectifier unit.
(b) Control panel, including parameters, cables (50 mtrs) and accessories.
Degutting for the removal of following:- (a) Hot plates including wiring, rotary switches and indication lamp (Officer galley and trainees galley).
(b) Sockets, MCCBs and isolation switch (Officer galley and trainees galley).
Equipment Obsolete – Proposed for survey. (FLYCO)
Degutting for the removal of following:- (a) GPI unit from FLCO deck/ hanger top
(b) Control panel from FLYCO alongwith cables and accessories.
Scope of works:- (a) Assistance of scaffolding for refitting of navigational light fittings alongwitgh bulb and holder at main mast, fwd and aft mast, qty - 20 NOS. (Main mast/ foxle/ helo deck/ quarter deck)
Equipment Obsolete, proposed to be retained.SR routine to be undertakeen, scope of works:- serviceability checks of NLCP PCBs ( qty-10) (Bridge)
Equipment Obsolete, proposed to be retained. SR routine to be undertakeen, scope of works are as follows:- (a) Serviceability checks of ACOS for both manual and auto mode( qty- 10) (b) Checks of deterioration of rubber and intactness of rubber/ metal bond, if defective replace the same. (CMR/ ASP/ 02 DECK/ 01 DECK)
Degutting for the removal of following(Ships galley/ Trainees galley):- (a) Deep fat frier unit alongwith heating element.
(b) Socket and switches
Equipment Obsolete, proposed to be retained. SR routine to be carried out. Scope of works are as follows:- (a) Inspection of belt, if cracked more than half way through the point where link pad is attached, replace the belt. (b) Inspect blade, if cracked replaced the same. (c) Inspect rubber drive coupling and replace if defective. (Bridge)
Proposed to be retained for safety. Functionality checks of all AELs and repair/ replacement of defective AELs. (various Locations)
Degutting for the removal of SPT alongwith accessories. (various Locations)
02 Motors( 01 Supply fan and 01 supply exhaust). Overhauling of both motors and starter including replacment of bearing.
Degutting for the removal of 02 Motors ( 01 Supply fan and 01 supply exhaust)with fan and control panel (Port and stbd cat walk)
02 Motors Proposed to be retained for safety. Overhauling of both motors and starter including replacment of bearing. (Tank space)
Degutting and removal of 04 Motors with fan and control panel. (Tank space)
Proposed to be retained for safety. SR routine to be undertakeen Scope of works:- (a) Examine shock/ vibration mountings, replace with new if required. (b) Overhauling.(Variour locations)
Proposed to be retained for safety. SR routine to be undertakeen. Scope of works:- (a) Examine shock/ vibration mountings, replace with new if required. (b) Overhauling.(Variour locations)
Proposed to be retained for safety. Scope of works:- (a) Calibration of panel instruments/ meters. (b) Repair/ replace of bus bar insulators if necessary. (Quarter deck)
Degutting for the removal of following:- (Ships Laundry) (Ships galley)
(a) Rice boiler unit alongwith control panel.
(b) Technical window during dry dock for the shipping out of washing machine.
Overhauling of both motors and starter including replacement of bearing (AER)
Overhauling of motor and starter including replacement of bearing (JS Bathroom)
Overhauling of both motors and starter including replacement of bearing (EDA Compartment )
Overhauling of both motors and starter including replacement of bearing (JS Bathroom)
Overhauling of both motors and starter including replacement of bearing
SR Routines. Overhauling of motors as per SPM data . SR Routines. Overhauling of motors as per SPM data . (Stbd cat walk)
SR Routines. Overhauling of motors as per SPM data . (Quarter deck)
SR Routines. Overhauling of motors as per SPM data .(Near RIB davit)
SR Routines. Overhauling of motors as per SPM data . (Near RIB davit)
SR Routines. Overhauling of motors as per SPM data . (Port troops bathroom)
SR Routines. Overhauling of motors as per SPM data . (Port troops bathroom)
SR Routines. Overhauling of motors as per SPM data .(LCA Store)
SR Routines. Overhauling of motors as per SPM data . (Tank space)
SR Routines. Overhauling of motors as per SPM data . (Stbd troops bathroom)
SR Routines. Overhauling of motors as per SPM data . (Stbd troops bathroom)
SR Routines. Overhauling of motors as per SPM data . (JCO Bathroom)
SR Routines. Overhauling of motors as per SPM data . (Officer bathroom)
SR Routines. Overhauling of motors as per SPM data . (Diving Store)
SR Routines. Overhauling of motors as per SPM data . (Stbd cat walk)
SR Routines. Overhauling of motors as per SPM data . (Infront EO cabin)
SR Routines. Overhauling of motors as per SPM data . (Sick bay bathroom)
SR Routines. Overhauling of motors as per SPM data . (JS Bthroom)
SR Routines. Overhauling of motors as per SPM data . 9JS Bthroom)
SR Routines. Overhauling of motors as per SPM data . (Ceremonial store)
SR Routines. Overhauling of motors as per SPM data . (JCO Bathroom)
SR3-Carry out in-situ serviceability checks of breakers. Carry out serviceability genenrator breakers and auxilaries and other protection circuits
Electrical cable gland packing at various location, of various size on upper deck and below deck compartments perished, to be renewal.
Earthing and grounding of fittings such as Switches, Sockets, JBs, DBs, Boxes, Transformers, Starter to be renewed view perished. Work involves :- (a) Removal of old/ perished earthing straps. (b) Renewal of perished earthing bolts. (c) Fitment of new earthing strap with lugs at both ends.
stage.html
html • 0.02 MB
finance_625935.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .