Tender Value
Refer Docs
Closing Date
4 Feb 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
M(SRC-COM)
HSL GANDHIGRAM VISAKHAPATNAM
Anchor and Anchor Cables repairs for MV Viswa Vijeta
2022_HSL_88847_1
20/ 22002 /Anchor Cable repairs/ 205 /2021-22
Open Tender
Miscellaneous Services
Turn-key
20 days
VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
7 Feb 2022
1 Feb 2022
4 Feb 2022
1 Feb 2022
4 Feb 2022
1 Feb 2022
120 days
Amount
ITEM : SCOPE OF WORK FOR ANCHOR AND ANCHOR CABLE REPAIR NOTE: 1) Time period: 20days. 2) Contractors should work round the clock (E1, E2 & E3 shifts) to meet the time line. 3) Contractor to furnish the full details of man power and qualification to be submitted along with technical bid. 4) Relevant experienced supervisor to be provided from contactor for execution of work. 5) The firm should have past experience and the details of work orders regarding the same should be submitted along with technical bid. 6) More than 50% of the manpower being deployed should have complete knowledge on above work.
Remove chain cable (73mm DIA, 23 lengths) from cable locker along with anchor & Disconnect inboard end of chain cable.
Lay the anchor chain cable in dock floor for survey and painting
All joining shackles to be opened (23+2 no’s), including anchor joining shackles of both anchors and refitted. Retaining pin of all joining shackles to be renewed if require with new stainless steel pins.
Anchor cable to be calibrated and three copies of calibration report to be submitted to ship staff & IRS.
End to End changing of chain cables as per gauging report
Renew anchor shackle chain as required after thickness measurement ( allow total 8 length to be changed with new kenter shackle) ( 8 length each ) kenter schakle ship supply
Port and Stbd anchor cable enlarged end link, connected to swivel, to be renewed if necessary (material owner supply).
Bow stopper securing pin to be straitened / renewed
Loose studs to be welded on one side using low hydrogen electrodes.
After completion of all repairs all lengths to be marked with s.s. strips with ‘D’ buckles and red and white paint. Bitter end to be connected to chain locker and total chain cables heaved in to chain locker and anchor secured in hose pipe.
SRI SAI KRISHNA WORKS
SRI VENKATA SAI WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .