| 1 | Admitted-Fee/PreQual/Technical/Finance ADMINISTRATIVE BUILDING SHIPYARD PREMISES SHIPYARD PREMISES M G ROAD PERUMANOOR ERNAKULAM KERALA ERNAKULAM KERALA 682015 | ERNAKULAM | KERALA | 682015 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
7 Jul 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIAL SUPERINTENDENT
NSRY, KOCHI
OPERATIONAL REPAIRS OF INS MAGAR
2021_NAVY_455377_1
PP/02/1130/MAGAR/OR/21
Single
Marine Services
Item Rate
50 days
AT KOCHI
THE SHIPYARD MUST HAVE SUITABLE DRY DOCK AND SUFFICIENT INFRASTRUCTURE FACILITY AT KOCHI FOR UNDERTAKING OPERATIONAL REPAIRS OF INS MAGAR
4 documents required · 4 mandatory
₹0
₹15 L
Yes
8 Jul 2021
28 Jun 2021
8 Jul 2021
28 Jun 2021
7 Jul 2021
1 Jul 2021
29 Jun 2021 - 30 Jun 2021
90 days
Amount
ADMIN SERVICES
(A) PROVISION OF SHORE GALLEY AND DINING HALL
SUPPLY 300 LITRES OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD.
(A) PROVIDE AIR CONDITIONED REFURBISHED OFFICE SPACE FOR PROJECT OFFICER NSRY
(B) PROVIDE STD LAND LINE FOR PROJECT OFFCER WITH FAX FACILITY IN PROJECT OFFICE
QUOTE FOR DAILY MAINTENANCE/UPKEEP/ CLEANSHIP OF ALL ABOVE MENTIONED ROOMS/HALLS/OFFICE SPACES/WASHROOMS
(I) PROVIDE ONE AC SEDAN FIVE(05) SEATER CAR WHITE COLOUR FOR PROJECT OFFICERS OF PLANNING & COMMERCIAL OF NSRY (15 HRS/150 KMS PER DAY) Registration not beyond 4 years from effective date of Contract, no dents and patches, daily sanitisation of the vehicle, white fitted seat covers, driver well groomed and must wear shirt trouser and shoes.
(II) PROVIDE ONE AC SEVEN(07) SEATER/ SUV WHITE COLOUR FOR PROJECT MONITORING TEAMS OF PLANNING & COMMERCIAL OF NSRY (15 HRS/150 KMS PER DAY)Registration not beyond 4 years from effective date of Contract, No dents and patches, daily sanitisation of the vehicle, white fitted seat covers, driver well groomed and must wear shirt trouser and shoes.
GENERAL SERVICES
(A) PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED OUTSIDE INSPECTING AGENCIES EX - LRS, IRS, ABS ETC.
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I, BOTH CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN VERSION-I. SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT
(A) DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
(B) SUBSEQUENT DAYS IN DOCK.
(C) ASSISTANCE FOR DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
(D) ARRANGE PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY.QUOTE UNIT RATE PER DAY
(E) MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR 2 OPERATION
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. ANY DREDGING REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
(A) PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 50 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER METER/ENERGY METER IN SUPPLY LINE
(B) QUOTE FOR CONNECTION/ DISCONNECTION TAKEN FOR 2 TIMES)
(A) PROVIDE 02 SEA WATER FIRE MAINS WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES AND NECESSARY SUPPLY HOSES. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBERATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED
(B) CONNECTION AND DISCONNECTION OF LINES
SHIPYARD TO PROVIDE 02 PORTABLE AC UNITS (MINIMUM CAPACITY 15 TR EACH) WITH 04 AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
(A) PROVIDE FRESH WATER 02 TONS PER DAY. PAYMENT AT ACTUALS
CONNECTION AND DISCONNECTION OF FRESH WATER SUPPLY.
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIP PAYMENT AT ACTUALS
PROVIDE 04 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS
TEMPORARY LIGHTING AND VINTILLATION ONBOARD FOR THE ENTIRE DURATION OF DOCKING
PROVIDE 01 INDUCTIVE CUM RESISTIVE LOAD BANK 500 KW FOR LOAD TRIALS OF DA INCLUDING HIRE CHARGES WITH OPERATOR CREW. PAYMENT AT ACTUALS.
SHIFTING/CONNECTION
PROVIDE STATIONARY/OFFICE ITEMS FOR REFIT MONITORING TEAM FOR ENTIRE REFIT DURATION . CATER FOR SUPPLY OF ITEMS WORTH 25000/ (TWENTY FIVE THOUSAND ONLY). REQUIREMENT WILL BE INTIMATED BY COA/NSRY (KOC)
STRUCTURE
REPLACEMENT OF ALL LCA DAVIT ARMS AS PER DRAWING. WORK INVOLVE REPLACEMENT/ REPAIR OF FOLLOWING:- (A) CARRY OUT SURVEY OF FOUNDATIONS OF ALL DAVITS AND REPAIR/ RENEWAL AS PER SURVEY REPOR
(B) REPLACEMENT OF ARMS WITH SHEAVES ARRANGEMENT VIEW EXISTING ARMS DEFORMED.
I. COST OF FIXED ARMS - 04 NOS
II. INSTALLATION OF THE DAVITS- 04 Nos
(C) REPLACEMENT OF STEEL WIRE ROPE (DIA -32MM, ANTI-TWIST, 7X34 CONSTN, GALVANIZED, BREAKING LOAD – 51,200 KGS. 2X30 METERS LONG.) OF ALL EIGHT ARMS
(D) REPLACEMENT OF FERRULE STOPPER FRAME
(E) SURVEY OF ROPE REEL DRUM AND REPAIR AS PER SURVEY REPORT.
(F) STOPPER ASSEMBLY CORRODED/ THINNED TO BE REPAIRED/ RENEWED.
CARRY OUT LOAD TEST TRIALS OF ALL LCA DAVITS POST REPLACEMENT OF ARMS AND ASSOCIATED FITTINGS IN FULLY RIGGED POSITION.
REPLACEMENT OF LOAD TEST TALLIES FOR 04 LCA DAVITS WITH DETAILS OF LOAD TEST AND DATEOF TEST ENGRAVED. SECURE TALLY ON DAVIT ARM. MATERIAL OF TALLY- BRASS, SIZE 100MM X 70 MM X 3MM
ALL SCREW DOWN SECURING JACKS OF LCA DAVIT TO BE RENEWED.
SURVEY OF GEAR BOX FOR ANY WEAR AND TEAR OF TEETH AND REPLACE IF FOUND DEFECTIVE.
IMPROVEMENT OF VENTILATION IN LCA DAVIT PUMP ROOM BY PROVISIONING OF HIGH CAPACITY BLOWER MOTOR WITH MODIFICATION OF EXISTING MUSHROOM. THE WORK INVOLVE PROCUREMENT AND FITMENT OF BLOWER MOTOR (5 KW) WITH STARTER PANEL WITH ALL SAFETY INDICATIONS. REQUISITE HOT WORK AND OTHER ASSOCIATED CUTTING, GRINDING WORK AND OTHER MISCELLANEOUS WORK FOR THE FITMENT OF ITEMS AND PROVING OF SYSTEM.
HYDRAULICS
Overhaul hydraulic pump and motors of LCA davits (a) Hydraulic pump. - 02 Nos OEM for hydraulic pump:- M/s Voith, UK (b) Motor for pump40.5 KW. 02 Nos OEM for motors:- M/s Combimac BV Emmen, Holland
DD engine & pump (Make - Crompton Greaves) for emergency operation of LCA davits declared BER to be replaced. (DD Engine – 5HP @ 1800 RPM Greaves Lombardini air cooled diesel engine, Pump – Eckerle, type - EIPH2- 006RK03-11, Made in German
Overhaul hydraulic motors of 03 LCA davits:- OEM for motors:- M/sPoclain make, H-25
Replacement of pressure line and return line filters. Make - Poclain
Clean the complete hydraulic tank and fill with fresh oil
Flushing of complete system up to NAS 8
Leakage observed from various Hydraulic Control valves. To be pressure tested, if defective all valves to be replaced. Make- Poclain
Leakage observed from hydraulic lines at scattered locations. Suspect O rings/ adaptor threading worn out. Leakages to be rectified and proven to SS at the operating pressure of davit ie 200 BAR.
a. Renewal of Orings/Adapter
b. Pipe Remove /Refit & Pressure Test
Overhauling of accumulator and hand pump for gravity lowering on boat deck, post overhauling gravity lowering to be proven to SS.
PROVING OF INTER SWITCH BOARD PARALLELING
Procurement and fitment of two check synchroniser in both switchboard Rating 440 V, 60 Hz and dimension 14.5 cm x 14.5 cm.
Procurement and fitment of four KW meters along with transducer rating 500 kW and dimension 14.5 cm x 14.5 cm.
Provisioning of UV, motor mechanism and closing/ opening coil in all four interconnecting breakers (interconnecting breaker make M/s Schneider Electric).
Provisioning of four remote push buttons for switching ON the interconnecting breaker (two each in each switchboard). ON/OFF indication light (red/ green) be also provided.
Procurement and fitment of AVR (500 KW) to be reputed make viz M/s Kaushik, M/s Krilosker
Procurement and fitment of AVR (250 KW) to be reputed make viz M/s Kaushik, M/s Krilosker
Tuning of new AVR with DA (Quadrature Droop Control and V-Trim).
Requisite cables and wiring for the proving for the same.
Proving of short time paralleling between switchboards for transfer of load.
Cost for OEM Service Engineer (If Required)
REPLACEMENT OF MER AND AER FIREMAIN PUMP AND MOTOR
Procurement and fitment of two numbers firemain pump along with motor and its control panel. Quote for following:- (a) The capacity of Pump – 100 TPH (Q), with minimum Head (H) – 80 metres.
(b) The fire pump motor should be rated at 440 V, 60 Hz, 3 phase to drive to pump to achieve up to 10 bar pressure for energising ships fireman system.
(c) Procurement and fitment of Motor starter control panel with all requisite indications, Voltage and current instrument meters, protections, safety devices including SV mounts for MER and AER fire pumps.
(d) Procurement and Fitment of Suction and discharge pressure indication gauges including pressure gauge pipe for MER and AER fire pumps.
The existing suction end pipe dia is 125 mm and discharge end pipe dia is 125 mm. Requisite modification is to be undertaken for integrating the pump with firemain system
Bellows and end fittings to be provisioned as per the modifications done on the system. Further, four bellows in addition to be handed as OBS. (a) Quote for modification
(b) Quote for Fitment of Bellows
(c ) Quote for supply of Bellows
Modification on the existing frames (frame size 0.76 mtrs x 0.89 mtrs) for the housing of pump and motor assembly. The existing pump-motor arrangement is in vertical position (mono-block assembly).
Supply and fitment of mounts.As required
Provisioning of remote start/stop for both pump from MCR by laying of cable from AER and MER:-
Laying of Cable (2x 5 sq mm)
Fitment of push button for start/ stop and running indication in MCR (existing panel).
Requisite hot work and other associated cutting, grinding work and other miscellaneous work for the fitment of items.
Removing of existing pump- motor assembly (de-coupled mode) and starter panel from AER and MER and shifting to location as indicated by SS. Cutting, grinding and other miscellaneous work for the removal of items.
Proving of pump-motor with ships firemain system and certification by Navy trial agency
Trial and proving of system as per performa.
REPLACEMENT OF 500 KW STBD DA
Degutting of all associated necessary system pipes, platforms, ladders, electrical cables, equipment, ventilation fans, trunkings, etc in the passage way for removal of existing DA
Dismantling of engine foundations, fitment of rails and ship side cutting. Lagging removal on ship side/ deck head/ exhaust trunkings/ ventilation ducts/ trunkings
(a) Shifting of existing DA out of the MER and placement of spare DA onto the foundation. Prior to fitment of new DA planarity checks of DA foundation required to be undertaken and necessary repairs if required. (b) New DA required to be installed on DA foundation and alignment to be undertaken with Alternator. Fastening of DA onto foundation as per approved designs and specifications. (c) Post fitment of DA all Fresh Water, Sea water, Fuel, Pneumatic and Lub oil system pipes associated to DA are required to be fitted back along with securing arrangements.
Fitment of all peripheral items, assemblies and components of DA. Fitment of all other assoicated system pipes, cables and exhaust trunking of DA along with integration with Control Panel.
Regutting of all associated necessary system pipes, platforms, ladders, electrical cables, equipment, ventilation fans, trunkings, etc in the passage way for removal of existing DA
Rewelding of ship side hard patch on both sides followed by dye penetration test (DPT) to prove structural integrity. Lagging of ship side/ exhaust trunkings/ exhaust pipes etc as required.
INCLINING EXPERIMENT
Conduct inclining experiment post completion of repairs
OTHER JOBS
Steel renewal
Stabilised power supply
UW paint application
UW painting touch up
stage.html
html • 0.02 MB
finance_507657.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .