Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
6 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Electrical),
Urgent hiring of 02 Nos. of Harbour Mobile Cranes (HMCs) of 100 MT or above capacity & 01 no. of Material Handler of 35 meter or above reach on Revenue sharing basis for a period of 12 years, extendable by 03 years at DPA
237797
CME/1894/2025
Open
Electrical - All
Works
Kachchh
6 documents required · 4 mandatory · 2 optional
₹5,900
Yes
Deendayal Port Authority
₹50 L
Yes
27 Nov 2025
27 Nov 2025
27 Nov 2025
6 Feb 2026
27 Nov 2025
opening of the Technical Bid, failing which Bid of the Bidder shall
be treated as disqualified.
In case of partnership firm IP agreement to be signed by all the
partners of Partnership firm.
In case of limited company IP agreement to be signed by
authorized signatory as per POA duly supported with Boards
In case of JV firms IP agreement to be executed and submitted in
the name of the JV and all the parties of JV to sign and stamp the
agreement, in preliminary bid stage.
Copies of partnership deed, power of Attorney, Board resolution etc.
shall be submitted at preliminary bid stage. Failing in submission of
IP agreement as per above requirement, bids shall be treated as non-
responsive and shall be rejected.
Site Visit Form The bidder must carry out site visit prior to bid and submit the
Site visit form (Section VI). In absence of duly signed and filled site
visit form bid will be considered as non-responsive.
Bid document 27/11/2025
downloading start date
Bid document 11/12/2025 at 1600 hrs.
downloading end date
Date and place of pre-bid 15.00 hours on 0 5 .12.2025 at new Board Room, Administrative
meeting Office Building, Deendayal Port Authority, Gandhidham – Kachchh,
Late date and time for 11/12/2025 at 1600 hrs.
online submission of bids
Bid validity period 120 days from the date of opening of preliminary bid.
First stage (Preliminary) bid The bid / Tender not accompanied with Tender fee, EMD, duly filled
qualification Conditions Integrity Pact and duly filled Site Visit Form in Preliminary Bid shall
not be considered responsive, and their technical and price bid will
In case of Micro and Small Enterprise (MSEs) holding valid Udyam
Registration Certificate issued by Ministry of Micro, Small and
Medium Enterprises indicating the list of activity related to the
subject tender as per National Industrial Classification-2008
mentioned below, only shall become eligible for exemption from
payment of tender fee / EMD. Such bidder shall also upload the
scanned copy of valid & relevant certificate on (n) procure website
along with ‘Bid Securing Declaration Form’ (Section VI) in
preliminary bid failing which the bid shall be considered non-
NIC code Description
28162 Manufacture of other lifting and handling
equipment and parts thereof
52241 Cargo handling incidental to land transport
52242 Cargo handling incidental to water transport
Pre-Qualification Criteria Similar works means:
The bidder shall fulfill the following pre-qualification criteria:
(i) The bidder must have handled at least 0.8 MMT of dry bulk cargo
/ Break bulk Cargo with 100 Ton (or above) capacity HMC or
Material Handler of minimum 35 meter reach (Container cargo
will be equated at the rate of 14 MT per TEUs) per annum per
offered crane in any sea port / ICD in any one year during the
last 7 years ending on 31.10.2025. In this regard, the bidder is
required to submit a certificate issued by the respective sea port
/ Inland Container Depot.
(ii) Stevedore handled cargo minimum of 0.8 MMT in any sea
Port/ICD per year per HMC or Material handler in any one year
during the last 7 years ending on 31.10.2025. In this regard, the
bidder is required to submit a certificate issued by the respective
sea port / Inland Container Depot.
(iii) OEM/ Authorized dealer/Channel partner of HMC or Material
Handler supplied 100 Ton (or above) capacity HMC or Material
Handler of minimum 35 meter reach, at least for similar nos. of
HMC or Material Handler in any one year during the last 7 years
ending on 31.10.2025, for which bidder is quoting. Bidder shall
submit the purchase order, deliver receipt and successful
commissioning of HMC or Material hander at site by the
buyer/operator/client.
The bidder shall submit the work credentials for single or in any
combination of (i), (ii) & (iii).
The bidder must have average annual turnover of Rs.
crores for each offered HMC or Material Handler during last
three years ending on 31.03.2025 as certified by the
Chartered Accountant with Valid UDIN number. If the
bidder is quoting for more than 01 HMC & Material Handler,
the average Turn over shall be multiplied accordingly.
Bid opening date Technical bid will be opened on 11.12.2025 at 16:15 hrs.
Opening of price bid shall be notified after scrutiny and evaluation
of technical bid.
Contact Email: [email protected]
Contact No.: +91 9825662383 /
NOTE: In case, bidders need any clarifications Or if training is required to participate in online
Tenders, they can contact (n) Procure Support team at following address:
(n) code solution – A division of GNFC LTD., (n) procure cell 403, GNFC Info Tower, SG Road,
Bodakdev, Ahmedabad – 380 054 (Gujarat)
Contact Details:
Reliance: +91-79-30181689 Fax: +91-79-26857321, 40007533 E-mail: [email protected]
Format and Signing of bid
The price bid to be submitted on line shall be signed digitally by a person or persons duly authorized
to sign on behalf of the bidder. The bid shall contain no alterations, additions, except those to
comply with instructions issued by the employer.
Submission of bids
Bidders who wish to participate will have to procure / should have legally valid Digital Certificate,
as per Information Technology Act-2000, using which they can sign their electronic bids. The
bidders can procure the Digital Certificate from (n) code solutions a division of GNFC Ltd, who are
licensed certifying authority by Government of India. All bids should be digitally signed. For details
regarding Digital signature certificate and related matters, the below mentioned address should be
contacted: (n) code Solutions, A Division of GNFC, 301 GNFC Info Tower, Bodakdev, Ahmedabad.
Tel. 91 79 26857316/17/18 Fax: 91 79 26857321 E-mail: [email protected]:
The price bid to be submitted online shall be signed digitally by a person OR person duly authorized
to sign on behalf of the bidder.
The accompaniments to the tender documents as described herein shall be scanned and submitted
online along with tender documents. However, the original/attested hard copies, except price bid,
shall have to be forwarded subsequently so as to reach the Executive Engineer (Mechanical),
within 7 days of the opening of the Preliminary bid of the bidder, failing which the tender shall be
considered as non- responsive.
The envelopes containing Bid except Price Bid (Section V) shall be addressed to:
Executive Engineer (Mechanical)
Room No 11, Administrative building, P.B. No.
Deendayal Port Authority
Kutch – Gujarat
The envelopes shall bear the following identification:
Accompaniments for “Urgent hiring of 02 Nos. of Harbour Mobile Cranes (HMCs) of 100 MT or above
capacity & 01 no. of Material Handler of 35 meter or above reach on Revenue sharing basis for a
period of 10 years, extendable up to 02 years at DPA”.
Bid reference No: CME/1894/2025 Name and address of the bidder.
Deadline of submission of the bids
Bids must be received by the licensor in on-line system at website https://kpt.nprocure.com no later
than 16:00 hours on 11/12/2025 in the event of the specified date for the submission of bids
being declared a holiday by the employer, the bids will be received up to the appointed time on the
next working day.
The licensor may extend the deadline for submission of bids by issuing an amendment in which
case all rights and obligations of the employer and the bidders previously subject to the original
deadline will be subject to the new deadline.
At the time of submission of the tender document, the bidder shall give an undertaking that no
changes have been made in document. The uploaded version of the Port Tender Documents on
https://www.nprocure.com will be treated as authentic tender and if any discrepancy is noticed
at any stage between the Port’s tender document and the one submitted by the bidder, the
conditions mentioned in the Port’s uploaded document shall prevail. Besides, the bidder shall be
liable for legal action for the lapses.
Instructions to Bidders (ITB)
1. Deendayal Port Authority (hereinafter referred to as the licensor) invites bids by E-
Tendering from the interested eligible bidder for the work as mentioned in the notice
inviting online tender. All bids shall be completed and submitted on-line in accordance
with instruction to the bidders.
2. Pre-Qualification Criteria:
The bidder shall fulfill the following pre-qualification criteria:
(i) The bidder must have handled at least 0.8 MMT of dry bulk cargo / Break bulk Cargo
with 100 Ton (or above) capacity HMC or Material Handler of minimum 35 meter reach
(Container cargo will be equated at the rate of 14 MT per TEUs) per annum per
offered crane in any sea port / ICD in any one year during the last 7 years ending
on 31.10.2025. In this regard, the bidder is required to submit a certificate issued by
the respective sea port / Inland Container Depot.
(ii) Stevedore handled cargo minimum of 0.8 MMT in any sea Port/ICD per year per HMC
or Material handler in any one year during the last 7 years ending on 31.10.2025. In
this regard, the bidder is required to submit a certificate issued by the respective sea
port / Inland Container Depot.
(iii) OEM/ Authorized dealer/Channel partner of HMC or Material Handler supplied 100 Ton
(or above) capacity HMC or Material Handler of minimum 35 meter reach, at least for
similar nos. of HMC or Material Handler in any one year during the last 7 years ending
on 31.10.2025, for which bidder is quoting. Bidder shall submit the purchase order,
deliver receipt and successful commissioning of HMC or Material hander at site by the
buyer/operator/client.
The bidder shall submit the work credentials for single or in any combination of (i), (ii) & (iii).
The bidder must have average annual turnover of Rs. 15 crores for each offered
HMC or Material Handler during last three years ending on 31.03.2025 as certified
by the Chartered Accountant with Valid UDIN number. If the bidder is quoting for
more than 01 HMC & Material Handler, the average Turn over shall be multiplied
3. Documents Required:
All bidders shall scan and forward legible scanned copies of the following information
anddocuments with their bids.
PRELIMINARY BID
i. Tender Fee & EMD in approved format.
Tender fee of Rs. 5,900/- (including GST) through online transfer in Name of beneficiary:
Deendayal Port Authority, Bank of Baroda, Gandhidham Branch, a/c no.:
IFSC Code: BARBOGANKUT. Scan copy of RTGS no. and date of transfer may be uploaded
on (n) procure website in Preliminary bid.
EMD of Rs. 50,00,000 (Rupees Fifty Lakh Only) through online transfer in Bank of
Baroda, Gandhidham Branch, A/c no.: 10080100022427, IFSC Code: BARBOGANKUT or
in the form of Bank Guarantee or insurance surety bond as per enclosed format at
Section-VI (Form – 14 A). Scanned copy of RTGS transaction receipt (indicating RTGS
no. & date of transfer) or BG to be uploaded on (n) procure website in Preliminary bid.
BG towards EMD issued by Nationalized / Scheduled (except Co-operative) banks having
its branch at Gandhidham is only acceptable.
In case of Micro and Small Enterprise (MSEs) holding valid Udyam Registration
Certificate issued by Ministry of Micro, Small and Medium Enterprises indicating the list
of activity related to the subject tender as per National Industrial Classification-2008
mentioned below, only shall become eligible for exemption from payment of tender fee
/ EMD. Such bidder shall also upload the scanned copy of valid & relevant certificate on
(n) procure website along with ‘Bid Securing Declaration Form’ (Section VI) in
preliminary bid failing which the bid shall be considered non- responsive:
NIC code Description
28162 Manufacture of other lifting and handling
equipment and parts thereof
52241 Cargo handling incidental to land transport
52242 Cargo handling incidental to water transport
ii. Duly filled in Integrity Pact and Site Visit Form:
with sign of owner/ Authorized proprietor /each partner of JVs, sign of one witnesses
with address (to be arranged by the bidder) and Site Visit Form in Section VI.
a) Copies of original documents defining the constitution or legal status, place of
registration and principal place of business, written power of attorney of the
signatory of the bid to commit the bidder.
b) Reports on the financial standing of the Bidder, such as profit and loss
statements and auditor’s reports for the past three years ending 31st March of
the previous financial year with UDIN Number.
c) Forms mentioned below Section VI.
d) PAN, Registration with GST, Provident Fund Authorities.
e) Information regarding any litigation, current or during the last five years, in
which the Bidder is involved, the parties concerned, and disputed amount.
f) Declaration that the bidder has not been banned / de-listed by any govt. / semi-
Govt. organization or PSUs.
g) Power of attorney (dully accompanied by resolution of Board in case of
h) Qualifications and experience of key site management and technical personnel
proposed for the contract.
i) The proposed methodology and program of work, backed with equipment
planning and deployment, duly supported with broad calculations and quality
control procedures proposed to be adopted justifying their capability of
execution and completion of the work as per technical specifications within the
stipulated period of completion as per milestones (Not Applicable).
j) Bidders should give an undertaking letter duly stating that the documents
submitted by them in support of their credentials are genuine and DPA is at
liberty to take any action against the bidder if the said documents are found to
be non- genuine.
k) Bidders should give an undertaking that they will comply to the specifications of
the work including terms and conditions in total without any deviation.
l) At the time of submission of tender document, the bidder shall give an
undertaking that no changes have been made in the document
m) Experience certificate as required under clause 2.1 (a) (I) above.
n) Certificate mentioning valid UDIN, issued by the Chartered Accountant for
Annual Average Turnover, as required under Clause No. 2.1 (a) (II) above.
o) An undertaking to the effect that no changes have been made by us in the
downloaded tender formats and understand that in the event of any
discrepancies observed, the tender hoisted on website of (n) procure is full and
final for all legal / contractual obligations.
p) The OEM/OPM list of Critical spares for respective HMCs/Material Handler shall be
submitted to DPA with tender documents duly certified by OEM/OPM.
All uploaded scanned copy should be self-certified by Authorized person with
Fraudulent documentation by bidders: Submission of fraudulent documents shall
be treated as major violation of the tender procedure and in such cases the Port
shall resort to forfeiture of SD/BG of the bidder, apart from blacklisting the firm
for the next 3 years.
3.1 Even though the bidder meets the above qualifying criteria, they are subject to
be disqualified if they have:
3.1.1 Made misleading or false representations in the forms, statements and
attachments submitted in proof of the qualification requirements: and/or
3.1.2 Record of poor performance such as abandoning the works, non – completion
of the contract.
4. System of Bidding
(i) The bidder can quote for either 01 number or 02 number of HMC(s) under BoQ-I of
(ii) The bidder can quote for only 01 number of Material Handler under BoQ- II of Section
(iii) The bidder can quote in above combination i.e. either for Sr. no. (i)/ (ii) or Sr. (i) and
(iv) The Quoted % share required by the bidder is including but not limited to taxes, duties,
fees, cess etc. and all incidental charges, etc. required for successful execution of the
work, excluding GST.
(v) DPA shall collect the revenues as per Schedule of Rates (SOR) for respective cargo and
quoted % of SoR as demanded by the bidder/licensee as revenue share for the
respective cargo shall be shared accordingly.
5. Revenue share calculation:
Rates of DPA SOR prevailing at the time of last date of submission of the bid shall be
considered for First year of the contract for each type of cargo. From second year onwards
(two) % escalation per annum on the previous year shall be taken for calculation for revenue
share for respective cargo. Escalation as above shall be applicable for entire contract period
including extension period. {The 2 (two) % escalation effect is cumulative
irrespective of revision in SOR rates upward/downwards}.
There will not be any escalation other than 2% as mentioned in the contract, any
representation / claim shall not be entertained by DPA for what so ever reason.
6. Cost of Bidding:
The Bidder shall bear all costs associated with the preparation and submission of its Bid and
Deendayal Port Authority will in no case be responsible or liable for those costs regardless of
the conduct or outcome of the bidding process.
The bidders shall conduct the site visit prior to submission of the bid and duly filled site visit
form in this regard available in Section VI shall be submitted as tender requirement. The
bidders are strongly advised to assess the site conditions and submit the realistic offer at
their own cost without any liability on the DPA.
8. Contents of Bid Documents:
Section I Instruction to Bidders (ITB)
Section II General Condition of Contractor (GCC)
Section III Special Conditions of Contract (SCC)
Section IV Scope of work
Section V Price bid
Section VI Forms:
Form 1 - Form of Agreement
Form 2 - Specimen Bank Guarantee Performance guarantee / Security deposit
Form 3 - Specimen format for declaration
Form 4 - Specimen letter of authority from bank for BG.
Form 5 – No Exception and Deviation
Form 6 - Format of Integrity Pact.
Form 7 - Specimen letter of authority for submission of bid
Form 8 - Format of Bid Security Declaration from bidders
Form 9 - Format for Evidence towards Site Visit
Form 10 - Tender Information Form
Form 11 - Proforma of Joint Venture/Consortium Agreement
Form 12 - Proforma of Power-of-Attorney for Lead Member of JV/ Consortium
Form 13 - Format for Details of Consortium Members
Form 14 (A) - Format for Insurance Surety Bond for EMD
Form 14 (B)- Format for Insurance Surety Bond for Performance Guarantee
Section VII Applicable SoR for collection of Rates for HMC & Material Handler utilization,
Section VIII Details of Cargo handling statistics
Bidders are strongly advised to examine all the instructions, forms, terms and specifications
in the Bidding documents. Failure to furnish all the informations required by the Bidding
Documents or submission of a Bid not Techno-Commercially responsive, in all respect, shall
be at the Bidder’s risk and shall result in the rejection of its Bid.
9. Joint Venture: In case of association in the form of consortium or joint venture agreement,
the members of the association shall nominate one of the members as “lead partner” for
participating in the tender and signing all the documents related therewith up to signing of
agreement and execution of all the contractual obligations thereafter (in case of award of
contract). However, Integrity Pact shell be signed by all the JV members duly stamp and
witness sign & address. All the partners of the association must also, jointly, and severally, be
responsible for satisfactory execution and performance of the contract. The contractors with
at least 26% equity holding each shall be allowed to jointly meet the eligibility criteria.
Conditions for bid submission by Joint Venture:
(i) The number of partners in JV/Consortium shall be limited to maximum of two.
(ii) In case of JV to qualify experience in similar works, merging of work order value
executed by one or two of its member JV either as a whole or as member of JV shall
not be permitted to qualify eligible works in terms of similar completed works, on-
going works. Only no. of work orders executed by members of JV shall be merged to
evaluate experience.
(iii) Lead partner must have handled at least 40 % of 1 MMT of dry bulk cargo / Break
bulk Cargo (Container cargo will be equated at the rate of 14 MT per TEUs) per annum
per offered crane in any sea port / ICD for 3 years during the last 7 years ending on
(iv) The works reckoned for the above purpose are those executed by the bidder as prime
contractor or proportionately as member of JV or as a subcontractor, authorized and
approved by the Employer of the work(s) against which the bidder has claimed his
experience. Further they may upload the scanned permission letter for sub-contractor
issued by principle (main client) otherwise the bid shall stand non-responsive.
(v) In the case of bid submitted by JV/ Consortium, the lead partner of the JV shall meet
the Minimum Eligibility Criteria of Financial Turnover.
(vi) Companies/Contractors may jointly undertake contract/contracts. The number of
partners in JV/Consortium shall be limited to maximum of two. Each entity would be
jointly and severely responsible for completing the task as per the contract, however
declaration of the Lead member (JV has to designate one partner as Lead Member in
their MOU) to be indicated by bidders. The firms with at least 26% equity holding each
are allowed to jointly meet the eligibility criteria.
(vii) A legally binding Joint venture / Consortium Agreement signed by authorized
signatories of all the partners of the JV/Consortium, as per the Proforma / Forms at
Section VI, shall be enclosed with the bid.
(viii) Power of attorney duly executed and signed by legally authorized signatories of all the
partners, authorizing the Lead Partner (a) to submit bid, negotiate and conclude
contract and incur all liabilities therewith on behalf of the partner(s) of the
JV/Consortium during the bidding process; and (b) in the event of a successful bid, to
incur liabilities and receive instructions for and on behalf of the partner(s) of the JV
/Consortium and to carry out the entire execution of the contract including payment,
exclusively through Lead Partner, as per the Proforma / Forms at Section VI, which
shall be duly authenticated by a notary public or equivalent certifying authority, shall
be enclosed with the bid.
(ix) The bid and in the case of the successful bidder, the Agreement, shall be signed and
/ or executed in such a manner for making it legally binding on all partners (including
operative parts of the ensuing Contract in respect of Agreement of Arbitration, etc.).
The Contract shall be signed by legally authorized signatories of all partners.
(x) The Lead Partner shall be authorized to receive instructions for and on behalf of the
partners of the Joint venture and entire execution of the Contract including payment
shall be carried out exclusively through the Lead Partner. A Statement to this effect
should be included in the Joint Venture Agreement.
(xi) All partners of the Joint Venture shall be liable jointly and severally for the execution
of the Contract in accordance with the Contract terms, and a Statement to this effect
should be included in the Joint Venture Agreement.
(xii) Bid Security as required shall be furnished by Lead Member of Joint venture.
(xiii) Performance Guarantee, as required, will be furnished by Lead Member of Joint
(xiv) Participation by a firm in more than one JV/Consortium is not permissible. A firm who
submits bid on individual capacity is not eligible to be a partner of a JV
/Consortium. In case a firm's name appears in more than one bid then both application
may be rejected.
(xv) Each partner must submit the complete documentation, or portions applicable thereto,
required qualifying the firm for bidding.
(xvi) All the partners of the JV/Consortium shall be jointly and severally liable for due
performance, recourse/sanctions within the joint venture in the event of default of any
partner and arrangements for providing the required indemnities.
(xvii) Notwithstanding demarcation or allotment of work among the partners, each partner
shall be liable for non-performance of the whole contract irrespective of their
demarcation or share of work.
(xviii) The Lead Partner shall be authorized to act on behalf of the JV/Consortium.
(xix) All the correspondences between the Employer and the contractor shall be routed
through the Lead Partner.
(xx) In the event of default by the Lead Partner, it shall be construed as default of the
Contractor; and Employer will take action under relevant clause(s) of the Bid
Document and/or General Terms and Conditions of Contract.
(xxi) An undertaking that all the partners are jointly and severally liable to the Employer
for the performance of the contract shall be enclosed with the bid.
(xxii) In the event of any partner leaving the JV, it shall be intimated to the Employer within
30 days by other partner(s). Failure to do so shall be construed as default of the
contractor and the Employer may take action under relevant clause(s) of the Bid
Document and/or General Terms and Conditions of Contract.
(xxiii) The contractor shall not alter its composition or legal status without the prior written
permission of the Employer. Failure to do so shall be construed as default of the
contractor and the Employer may take action under relevant clause(s) of the Bid
Document and/or General Terms and Conditions of Contract.
(xxiv) One of the partners of JV/Consortium should have downloaded the bid documents.
10. Clarification on Bid Documents: Pre-Bid Meeting
Pre-Bid meeting shall be arranged by Deendayal Port Authority at a scheduled date mentioned
in this tender document or as extended by DPA. DPA encouraged all the prospective bidders
to participate physically in this Pre-Bid meeting. It is advised to submit the queries in writing
well in advance i.e. about one week before the scheduled date. After approval, pre-Bid
clarification shall be published online as corrigendum to the tender documents. Bidder should
note that, the Pre-Bid Queries should reach to this office before 24 hours of scheduled pre-
bid meeting after the date of pre-bid meeting no queries will be entertained by the DPA. All
the prospective bidders are requested to regularly visit online website for updates on any
corrigendum with regard to tender.
11. Amendment of Bidding Documents:
(i) At any time prior to the last date for submission of bids, Deendayal Port Authority may,
for any reason, whether at its own initiative or in response to a clarification sought by
any prospective bidder, modify the bidding documents by amendment / addendum /
(ii) Any amendment will be notified on the website prescribed in Notice Inviting Tender and
on port web site. The bidder shall be solely responsible to check the web site for the
amendment issued in shape or corrigendum and/or addendum.
(iii) In order to afford prospective bidders, reasonable time to take the amendment into
account in preparing their bids, Deendayal Port Authority may at its discretion, extend
the last date for submission of bids.
12. Language of Bid
The Bid prepared by the Bidder and all correspondences and documents relating to the Bid
exchanged by the Bidder and Deendayal Port Authority shall be written in English language
13. Maximum Number of Cranes /Material handler for which a Bidder Can Quote:
(i) The bidder can quote for maximum of 02 number of HMC(s) under BoQ-I of Section –V.
(ii) The bidder can quote for only 01 number of Material Handler under BoQ- II of Section –V.
(iii) The bidder can quote in above combination i.e. either for Sr. no. (i)/ (ii) or Sr. (i) and (ii)
14. Revenue Share
The bidder shall quote their required Revenue Share % only in the online portal in the price
bid (Schedule-B) format.
15. Bid Validity
(i) Bids shall remain valid for a period of 120 days from the date of opening of preliminary
bid. A bid valid for a shorter period may be rejected by the Licensor as non-responsive.
(ii) In exceptional circumstances, prior to expiry of the original time limit, the Licensor may
request that the bidders may extend the period of validity for a specified additional
period. The request and the bidders' responses shall be made in writing or by mail.
A bidder may refuse the request without forfeiting his bid security. A bidder agreeing to
the request will not be permitted to modify his bid.
16. Security Deposits
(i) Bid Security (Earnest Money Deposit-EMD)
(a) EMD of Rs. 50,00,000 (Rupees Fifty Lakh Only) through online transfer in Bank of
Baroda, Gandhidham Branch, A/c no.: 10080100022427, IFSC Code:
BARBOGANKUT or in the form of Bank Guarantee or insurance surety bond as per
enclosed format at Section-VI (form – 14 A). Scanned copy of RTGS transaction
receipt (indicating RTGS no. & date of transfer) or BG to be uploaded on (n)
procure website in Preliminary bid. BG towards EMD issued by Nationalized /
Scheduled (except Co-operative) banks having its branch at Gandhidham is only
(b) In case of Micro and Small Enterprise (MSEs) holding valid Udyam Registration
Certificate issued by Ministry of Micro, Small and Medium Enterprises indicating
the list of activity related to the subject tender as per National Industrial
Classification-2008 mentioned below, only shall become eligible for exemption
from payment of EMD. Such bidder shall also upload the scanned copy of valid &
relevant certificate on (n) procure website along with ‘Bid Securing Declaration
Form’ (Section VI) in preliminary bid failing which the bid shall be considered non-
NIC code Description
28162 Manufacture of other lifting and handling
equipment and parts thereof
52241 Cargo handling incidental to land transport
52242 Cargo handling incidental to water transport
(c) The tender not accompanied with EMD or valid Udyam Registration Certificate and
‘Bid Securing Declaration Form’ shall not be considered and their technical and
price bid will be remained un-opened. The Earnest Money Deposit shall be
submitted in the form of Bank Guarantee issued by any Nationalized / Scheduled
Bank, having its branch in Gandhidham. The validity period of bank guarantee
should be of 30 days in excess of the bid validity.
(d) Earnest Money Deposit (EMD) of non-qualified bidders during preliminary
evaluation and technical evaluation stage shall be refunded within one months.
EMD of all the successful bidders will be refunded after entering the agreement for
required cranes by DPA. EMD of successful bidders will be refunded after
deposition of Performance Security as per tender condition. No interest will be
entertained by DPA on EMD for whatsoever reason.
(ii) The EMD may be forfeited if;
(a) The bidder withdraws the Bid after Bid opening during the period of bid validity;
(b) The bidder hides the facts, submits false declaration/documents;
(c) The successful bidder, having been notified of the acceptance of its bid by
Deendayal Port Authority during the period of bid validity, fails within the specified
i. Sign the Agreement;
ii. Furnish the required Performance Security and / or does not agree to carry
out the work as per the tender conditions.
(iii) Performance Security Deposit (PSD):
(a) Initially successful bidder has to submit two nos. of performance security deposit
each of Rs. 39 Lakhs for each HMC & Material Handler for a minimum validity
period of 12 months. After successful deployment of each HMCs & Material
Handler as per contract conditions, one security depot shall be released by DPA
and second shall be retained by DPA as “Security Deposit” for the entire period of
the contract. After deployment and operation at DPA “Retention Money” for each
HMC & Material Handler of Rs. 3.25 Lakhs shall be recovered from the running
monthly bills of the contractor each month. However, if Licensee desires to
continue deposited the second Performance security deposit with DPA as retention
money, in that case retention money from monthly bills shall not be recovered.
(b) Security deposit shall be for the entire period of contract and retention money will
be refunded after completion of each year after submission of first running
monthly bill for the successive year, subject to recovery of any penalties/dues of
(c) Successful bidder shall have to furnish a Performance Security/Security Deposit in
form of Online Digital Transfer or Insurance Surety Bond (Form – 14 B in Section
VI) or FDR or in form of Bank Guarantee issued from Nationalized / Scheduled
bank (except co-operative banks), having its branch at Gandhidham within
days of issue of LoA.
(d) DPA reserves the right to forfeit the Performance Security Deposit (comprises of
Security Deposit and Retention Money), in case of any default of the Licensee.
(e) Performance Security Deposit (PSD) shall remain valid for minimum of 60 days
beyond the entire period of contract/license. If the contractor submits lower
period of PSD, same shall be extended or submitted new PSD before 60 days of
expiry of the running PSD deposited to DPA. Contractor shall bear all types of cost
incurred w.r.t. PSD, including extension or making of new.
(f) After successful completion of the license period, the performance security deposit
will be returned back after making good any penalties/dues of DPA.
(g) During the entire contract/license period, if any Crane is withdrawn/ removed
from service by the Contractor, his Security Deposit will be forfeited, license will
be cancelled and contractor may be debarred or blacklisted as decided by DPA
Authorities, same shall be binding to the contractor and no claim of contractor will
be entertained in this regard.
(h) Failure to comply with the above requirements shall constitute sufficient ground
for cancellation of the award of work/license and forfeiture of performance
17. Alternative Proposals by Bidders
Conditional offer or Alternative offers will not be considered further in the process of tender
18. Submission of Bids
Bidders who wish to participate will have to procure/ should have legally valid Digital
Certificate, as per Information Technology Act-2000, using which they can sign their electronic
bids. The bidders can procure the Digital Certificate from (n) code solutions a division of GNFC
Ltd, who are licensed certifying authority by Government of India. All bids should be digitally
signed. For details regarding Digital signature certificate and related matters, the below
mentioned address should be contacted:
(n) code Solutions, A Division of GNFC
301 GNFC Info Tower,
Bodakdev, Ahmedabad.
E-mail: [email protected] /
The price bid to be submitted online shall be signed digitally by a person OR person duly
authorized to sign on behalf of the bidder.
The accompaniments to the tender documents as described herein shall be scanned and
submitted online along-with tender documents.
However, the original/attested hard copies, except price bid, shall have to be forwarded
subsequently so as to reach the Office of the Executive Engineer (Mechanical), within 7 days
of the opening of the Preliminary bid of the bidder, failing which the tender shall be considered
as non-responsive.
The envelopes containing Bid except Price bid (Section-V) shall be addressed to:
Executive Engineer (Mechanical)
Room No 11, Administrative building, P.B. No.
Deendayal Port Authority
Kutch – Gujarat
And shall bear the following identification:
Accompaniments for “Urgent hiring of 02 Nos. of Harbour Mobile Cranes (HMCs) of 100 MT or
above capacity & 01 no. of Material Handler of 35 meter or above reach on Revenue sharing
basis for a period of 10 years, extendable up to 02 years at DPA”.
Bid reference No: CME/1894/2025 Name and address of the bidder.
19. Modification and Withdrawal of Bids
(i) Bidders may modify or withdraw their bids before the deadline of submission of bid.
(ii) No Bid can be modified after the deadline for submission of Bids.
(iii) Withdrawal or modification of a Bid between the deadline for submission of bids and the
expiration of the original period of bid validity or as extended may result in the forfeiture
of the Bid security i.e. EMD.
20. Bid Opening:
DPA will open the bids at prescribed date and time for preliminary stage, in the event of
the specified date of bid opening is Sunday or declared holiday for Deendayal Port
Authority, the bids shall be opened on the next working day. Technical and Financial
bids opening will be on a latter date as decided by DPA as per stage wise approval of the
Competent Authority. Participating bidders may get the status of their bids online.
(i) The bids shall be evaluated first on the basis of the preliminary documents submitted
by the bidders to satisfy the eligibility requirements as mentioned in the NIT and then
the Techno-Commercial Offers of the eligible bidders only shall be evaluated.
21. Clarification of Bids
To assist in the examination and comparison of Bids, the Licensor may, at his discretion, ask
any Bidder for clarification of his Bid. The request for clarification and the response shall be
in writing, but no change in the price of substance of the Bid shall be sought, offered, or
22. Evaluation Methodology and Comparison of Bids
(i) Conditional bids shall be rejected by DPA. The technical evaluation shall be made strictly
on the basis of the documents submitted in online portal by the bidders in support of
the eligibility, the technical and commercial response.
(ii) After getting technically qualified, the bidder quoting their lowest
revenue % Share demand shall be consid ered for acceptance as Lowest offer.
In case of HMCs, the L1 (lowest offer) bidder offered single HMC, then second
HMCs will be considered from the next lowest bidder in sequence i.e. L2. L3…
subject to matching the rate of L1. In case of Material handler, L1 (lowest
offer) bid shall be considered for awarding for license.
For example, for HMCs:
Bidder-1 quoted for demand of 40% revenue share of SoR collected by
DPA and offered 01 HMC only.
In this case Bidder-1 shall be declared as L1 (lowest offer) and shall be
awarded for license of offered HMC only.
Bidder-3 quoted for demand of 45% revenue share of SoR collected by
DPA and offered 02 HMC.
In this case Bidder-3 shall be declared as L2 (second lowest offer) and
shall be asked to match with L1 offer, i.e. “demand of 40% revenue share
of SoR collected by DPA”.
If Bidder-3 agreed to match L1 offer for only one no. of offered HMC,
then Bidder-3 shall be awarded for license of one no. of HMC only for
which he has agreed to match with L1 offer.
If Bidder-3 not agreed to match with L1 offer, then no license shall be
awarded to Bidder-3.
Bidder-2 quoted for demand of 50% revenue share of SoR collected by
DPA and offered 02 HMC.
In this case Bidder-2 shall be declared as L3 (third lowest offer) and shall
be asked to match with L1 offer, i.e. “demand of 40% revenue share of
SoR collected by DPA”.
If Bidder-2 agreed for to match L1 offer for all offered HMCs, then Bidder-
2 shall be awarded for license of only remaining no. of HMC matching
If Bidder-2 not agreed to match with L1 offer, then no license shall be
awarded to Bidder-2.
Sequentially next Bidder-4, Bidder 5, …. shall be given option to match
with L1 (lowest offer) till all the three nos. of HMCs required by DPA is fulfilled.
In case, none of the other Bidders agreed to match with L1 offer, then
only one license shall be awarded by DPA and remaining offers shall be
rejected. No any further communication shall be entertained by DPA in
this regard. In case of Material handler, bidder offered L1 offer shall
be given license.
23. Contacting Deendayal Port Authority
Bidder shall not contact DPA on any matter relating to its bid from the time of the bid opening
to the time the contract is awarded. Any effort by any bidder to influence DPA in the Bid
Evaluation, Bid comparison or contract award decision, shall result in disqualification of the
bidder and forfeiture of the EMD.
24. Award of Contract (Grant of License)
The Licensor will Grant the License to the Bidder (s), provided that such Bidder has been
determined to be eligible and qualified as per above Cl. 22. Grant of license will be after
submission of performance security and submission of agreement etc.
25. Licensor’s Right to Accept/Reject any or all the Bids
The Licensor reserve the right to accept/reject any or all bids and to cancel the bidding
process, at any time prior to the grant of license without assigning any reason whatsoever.
The Licensor also reserve the right reduce or increase the total requirement of HMCs &
Material Handler in DPA, as per actual requirement before award of work.
26. Notification of Award (Grant of License) and Signing of Agreement
26.1 The Bidder, whose Bid has been accepted will be notified about the grant of license by the
Licensor prior to expiration of the Bid validity period by facsimile followed by confirmation by
letter. In this letter (hereinafter and in the Conditions of Contract called the “Letter of
Acceptance”) the license period, total Revenue share (in percentage) to be paid by DPA, etc.
will be mentioned in line with the tender conditions.
26.2 The DPA will grant the license subject to the furnishing of a performance security and
submission of signed agreement format on non-judicial stamp paper of Rs. 300/- in
accordance with the provisions of tender condition to the effect that the successful bidder
shall comply with all the terms and conditions of the tender.
26.3 The bidder is required to submit Agreement and performance guarantee within 21 days of
issue of the Letter of Acceptance.
26.4 The successful Bidder will be required to execute an agreement at his expense on Three
Hundred Rupees (Rs.300/-) Non-Judiciary Stamp Paper in the proper departmental format
mentioned in Section VI for the due and proper fulfillment of the contract within 21 days from
the date of Letter of Acceptance
26.5 Pending preparation and execution of the contract agreement as above, the tender submitted
by the Licensee together with CME’s letter accepting the tender shall constitute a binding
contract between the Board and the Licensee.
26.6 The agreement on stamp paper shall be furnished by the Licensee as per the following
guidelines within 21 days from the date of issue of Letter of Acceptance failing which the
successful bidder may not be granted license.
I. The original agreement as per the format attached with the tender should be
executed on a stamp paper of appropriate value (at present Rs.300/-)
II. The Agreement should be submitted in duplicate and the date of execution is to be
III. Each page of the document is to be signed by the Licensee/ his authorized
representative by indicating his full name.
IV. If the Licensee is a partnership firm, then a copy of the Partnership Deed and in case
it is a Company, a copy of Memorandum and Articles of Association along with
Registration Certificate is to be submitted.
V. If the agreement is signed by a Partner/ a Director/ an authorized person of the firm,
in such case, a certified true copy of the power of attorney/ letter of authority given
by the firm/ company to the signatory of the firm/company is to be submitted.
VI. The entire agreement should be in type written form/ computer printed form.
VII. Leaving blanks and insertion of some contents of the agreement with hand writing
should be avoided.
VIII. All corrections/ additions made in the agreement are to be initialed.
27. Fraud and Corrupt Practices:
27.1 The bidder and their respective officers, employees, agents and advisers shall observe the
highest standard of ethics during the Selection Process. Notwithstanding anything to the
contrary contained in this document, the Port shall reject the tender without being liable in
any manner whatsoever to the bidder, if it determines that the Bidder has, directly or indirectly
or through an agent, engaged in corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practice (collectively the “Prohibited Practices”) in the
Selection Process. In such an event, the Port shall, without prejudice to its any other rights
or remedies, forfeit and appropriate the Bid Security or Performance Security, as the case
may be, as mutually agreed genuine pre-estimated compensation and damages payable to
the Port for, inter alia, time, cost and effort of the Authority, in regard to the Tender, including
consideration and evaluation of such Bidder’s Proposal.
For the purposes of this Clause, the following terms shall have the meaning hereinafter
respectively assigned to them:
(i) “corrupt practice” means (a) the offering, giving, receiving, or soliciting, directly or
indirectly, of anything of value to influence the action of any person connected with the
Selection Process (for avoidance of doubt, offering of employment to or employing or
engaging in any manner whatsoever, directly or indirectly, any official of the Authority
who is or has been associated in any manner, directly or indirectly with the Selection
Process or the LOA or has dealt with matters concerning the Agreement or arising there
from, before or after the execution thereof, at any time prior to the expiry of one year
from the date such official resigns or retires from or otherwise ceases to be in the service
of the Authority, shall be deemed to constitute influencing the actions of a person
connected with the Selection Process; or (b) engaging in any manner whatsoever,
whether during the Selection Process or after the issue of the LOA or after the execution
of the Agreement, as the case may be, any person in respect of any matter relating to
the Project or the LOA or the Agreement, who at any time has been or is a legal, financial
or technical consultant/ adviser of the Authority in relation to any matter concerning the
(ii) “fraudulent practice” means a misrepresentation or omission of facts or disclosure of
incomplete facts, in order to influence the Selection Process;
(iii) “coercive practice” means impairing or harming or threatening to impair or harm,
directly or indirectly, any persons or property to influence any person’s participation or
action in the Selection Process;
(iv) “undesirable practice” means (i) establishing contact with any person connected with
or employed or engaged by the Authority with the objective of canvassing, lobbying or
in any manner influencing or attempting to influence the Selection Process; or (ii) having
a Conflict of Interest; and
(v) “restrictive practice” means forming a cartel or arriving at any understanding or
arrangement among Applicants with the Licensor will reject a proposal for award of
work if he determines that the Bidder recommended for award has engaged in corrupt
or fraudulent practices in competing for the contract in question.
27.2 Licensor will declare a Bidder ineligible to participate in any tender or RFP issued by it, either
indefinitely or a stated period of time, if at any time such Bidder is found to have either directly or
through an agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practice, as the case may be.
28. License Period
The validity of the license shall be for a maximum period of 10 (Ten) years, extendable up to
02 (two) more years on same terms and conditions with mutual consent from the date of
successful deployment of each HMCs & Material Handler in DPA.
29. Memorandum of Settlement
The Licensee shall not sign any memorandum of settlement with any agency such as Trade
Unions etc. in any form at any level without the prior approval of DPA in relation to any work
under taken by him in the Port premises.
30. The License granted to the successful bidder is not transferable.
The bidder must read the tender document carefully and prepare the bid for submission. It is
important to note that bidder shall submit the bid in accordance with the Tender documents.
Duly signed with seal & stamp Section-VI shall be submitted with the tender document with
no-deviation. Any deviation from the tender conditions shall be liable for rejection of the
32. Undertaking by the Bidders
The bidders shall give an undertaking that they have not made any payment or illegal
gratification to any person / authority connected with the bid process so as to influence the
bid process and have not committed any offence under the Prevention of Corruption Act (PC
Act) in connection with the bid.
33. Interpretation of Mobile Harbour Crane
Mobile Harbour Crane (MHC) and Harbour Mobile Crane (HMC) is the same equipment and
will have the same meaning for all purpose.
34. Pre–Bid Meeting
The bidder or his official representative may attend pre-bid meeting to be held at 15:00
hrs. on 05/12/2025 in the New Board Room, A O Bldg., Deendayal Port Authority,
Gandhidham. The bidders / representative of bidders who wish to attend the Pre-Bid meeting
shall furnish the authority letter on the letter head of Bidder, for attending the Pre-Bid Meeting
on behalf of bidder at the time of Pre-Bid Meeting.
35. In case of any discrepancy between the tender documents hosted by DPA on
www.deendayalport.gov.in and www.nprocure.com, the version of tender document hosted
on www.nprcocure.com shall be final and binding.
36. Signing of Integrity Pact:
The bidder has to execute Integrity Pact agreement with Deendayal Part Authority
(as per format enclosed) and Shri Amiya Kumar Mohapatra, IFoS (Retd.) and Dr.
Gopal Dhawan, Ex. CMD, MECL have been appointed by DPA as independent
External Monitors and whose address are as under:-
Shri Amiya Kumar Mohapatra, IFoS (Retd.), Dr. Gopal Dhawan, Ex.CMD, MECL Qrs. No. 5/9, Unit-
9, Bhoi Nagar, House No. 120, Jal Shakti Vihar,
Bhubaneswar – 751022 (NHPC Society) P4, Builders Area,
Mobile No. 9437002530 Greater Noida,
E-mail: [email protected] Gautam Budh Nagar, Uttar Pradesh – 201315 Mobile No.
E-mail: [email protected]
The Procedure for signing Integrity Pact" is as follow:
(i) The Employer / Authorized Person of Employer shall sign the IP in the presence of a
witness from their side, who shall also affix his/her signature thereof and then the same
IP shall be uploaded by them on n- procure portal;
(ii) The potential bidders shall download and print the IP Agreement Signed by the
Employer and their witness and affix his/her signature on the IP Agreement in the
presence of witness from his/her side, who shall also affix his / her signature thereof.
Having completed the signing procedure, the Potential Bidder Shall upload the duly filled
and signed IP Agreement on n-procure portal.
(iii) The procedure mentioned above regarding signing of Integrity Pact Agreement by both
the parties (Employer and Potential bidders) shall be completed online. However, in
case of any technical glitch due to which if any potential bidder is unable to upload the
IP Agreement, then he/ she shall submit the Hard Copy of the duly filed, signed IP
Agreement to the Department concerned of DPA within a period of seven days and prior
to opening of the Technical Bid, failing which Bid of potential Bidder Shall be treated as
Seal and signature Executive Engineer (Mechanical)
of the bidder Deendayal Port Authority
General Conditions of Contract (GCC)
General Conditions
In the Contract (as hereinafter defined) the definition of the following words and expressions shall
have the meanings hereby assigned to them except where the context otherwise requires:
a. “Employer” means Board of Authorities of Deendayal Port, a body corporate under the
Major Port Authorities Act.2021, by notification issued by the Government of India, acting
through its Chairman, Dy. Chairman or Chief Mechanical Engineer or any other officers so
nominated by the Board.
b. “Contractor” means the person or persons, contractor, corporation or company whose
tender has been accepted by the employer and includes the Contractor’s servants, agents
and workers, personal representatives, successors and permitted assigns.
c. “Contract” means and includes Tender Documents, Instructions to Bidders, General
Conditions of Contract, Drawings, Specifications, and Schedules etc., any amendments
thereto, Bid, Letter of Acceptance, Contract Agreement and the work order.
d. “SoR Rates” means the Scale of rates as ceiling rates per tonne for various cargo for HMCs
Handler declared by Deendayal Port Authority.
e. “Specifications” means the specification referred to in the tender documents and any
modifications thereof or additions thereto or amendments thereto as maybe from time to
time be furnished or approved in writing by the employer.
f. “Chief Mechanical Engineer” shall mean the Chief Mechanical Engineer of Deendayal Port
g. “Work” or “Works” shall mean the whole of the plant and materials to be provided and
work to be done executed or carried out by the contractor under the contract.
h. The “Site” shall mean the whole of the premises, buildings and grounds in or upon which
the system or works is or are to be provided, executed, erected, done or carried out.
i. The “Schedule” shall mean the schedule or Schedules attached to the specifications.
j. The “Drawings” shall mean the drawings, issued with the specification which will ordinarily
be identified by being signed by the Chief Mechanical Engineer and any further drawing
submitted by the contractor with his tender and duly signed by him and accepted or
approved by the Chief Mechanical Engineer and all other drawings supplied or furnished by
the contractors or by the Chief Mechanical Engineer in accordance with these contract
k. “Trials” and “Tests” shall mean such trials and tests as are provided for in these conditions
of contract and described in the specification and shall include all other tests to be carried
out as per the requirement of the ‘employer’.
l. “Approved” or “Approval” shall mean approval in writing.
m. “Engineer-in-charge/Nodal officer” shall mean any officer/Engineer authorized by Chief
Mechanical Engineer for purpose of this contract.
n. “Day” means calendar days, “months” are calendar months.
o. “Equipment” is the contractor’s machinery and vehicles brought temporarily tothe site to
construct the works.
p. “Material” is all supplies, including consumables, used by the contractor for incorporation
q. “Plant” is any integral part of the works which is to have mechanical, electrical, electronic
or chemical or biological function.
r. "Licensor/licensor" means Board of Deendayal Port Authority, a body corporate under the
Major Port Authority Act. 2021, by notification issued by the Government of India, acting
through its Chairman, Dy. Chairman or Chief Mechanical Engineer or any other officers so
nominated by the Board.
s. "Licensee" means the person or persons, firm, corporation or company whose tender has
been accepted by the Licensor and includes the Licensee's servants, agents and workers,
personal representatives, successors and permitted assigns.
t. "Specifications" means the specification referred to in the tender documents and any
modifications thereof or additions thereto or amendments thereto as may be from time to
time be furnished or approved in writing by the Licensor.
u. “Traffic Manager” shall mean the Traffic Manager of Deendayal Port Authority.
v. “Chief Mechanical Engineer” shall mean the Chief Mechanical Engineer of Deendayal Port
w. "Work" or "Works" shall mean the whole of the plant and materials to be provided and
work to be done executed or carried out by the licensee under contract.
x. The "Site" shall mean the whole of the premises, buildings and grounds in or upon which
the system or works is or are to be provided, executed, erected, done or carried out.
y. The "Schedule" shall mean the schedule or Schedules attached to the specifications.
z. "Approved" or "Approval" shall mean approval in writing.
aa. "Month" shall mean English Calendar Month.
bb. “Operation-in-charge” shall mean any officer authorized by Traffic Manager for the
purpose of Contract.
cc. “Year” for the purpose of this contract shall mean a period of 12 months commencing from
the date of commencement of operation of harbour mobile cranes by the successful bidder.
dd. “DPA” shall mean Deendayal Port Authority.
ee. “%” shall mean percentage.
ff. “Successful deployment” shall mean that the HMC & Material Handler has been
deployed/redeploy, accepted by DPA and ready for operation after meeting the requirement
of this tender.
gg. “Crane” means MHC, HMC or Material Handler.
2. Use of Contract Document:
The Contractor shall not, without prior consent, make use of any document except for the purpose
of performing this contract.
3. Change Orders :
At any time during the execution of the contract, by a written notice to the Contractor, changes
may be made in the general scope of contract. The Engineer In-charge (EIC), with due approval
of competent authority, may make any changes in the quality and/or quantity of the work or any
part thereof that may, in his opinion, be necessary and for that purpose the Engineer In-charge
shall have the power to order the Contractor to do and the Contractor shall do any of the following:
i. Increase or decrease or split the quantity of work included in the contract,
ii. Omit any such work,
iii. Change the character, quality or kind of any such work,
iv. Change the dimensions of any such work,
v. Change in Location
vi. Execute additional work of any kind necessary for completion of the work under the contract,
and no such change shall in any way vitiate or invalidate the contract but the cost, if any,
arising out of all such changes shall be taken into account in ascertaining the total amount
arising out of all such changes shall be taken into account in ascertaining the total amount
of the contract price. Where the rate is available in the contract and the same is applicable
to the additional work, in the opinion of the EIC, the cost of the additional work shall be
determined as per this available rate. But, if the rate for additional work is not available in
the contract, the same shall be determined by the EIC taking into account the market rate
and labour cost at the site for similar works and shall be final.
vii. Deviations from the specifications as contained in the tender agreement including the make
/ model, shall not be accepted. In case of any such deviation, payment shall not be made for
that part of the work / item, even if it is meeting the functional requirements and has been
accepted by the purchaser. The payment for such portion of the work / item can only be
released if the contractor makes good the deviations before the expiry of the warranty period
so as to meet the specifications of the tender agreement in all respects.
4. Resolution of Dispute:
a) The Board and the Contractor/ Licensee shall make every effort to resolve amicably by direct
informal negotiations, any disagreement or dispute arising between them in connection with
the contract. However, in case of failure of negotiation between the Board and the
Contractor, the parties shall refer their present and future disputes relating to the contract
itself or arising out of or concerning or in connection with or in consequence of the contract
to the Chairman, DPA whose decision shall be final and binding on both the parties. The
contract shall be governed by the Indian Contract Act,
b) Jurisdiction of Courts: All such disputes, which could not be settled at the intervention of
Chairman, DPA, shall be subjected to the jurisdiction of the courts at Gandhidham.
5. Force Majeure:
a. In the event that the Contractor / Licensee is delayed in performing its obligations in the
contract, and such delay is caused by force majeure including war, civil resurrection, strikes
(other than the strike solely by the Contractor’s men), fire, flood, epidemics, earthquakes,
extremely adverse climatic conditions, such delay may be excused and the period of such
delay may be added to the time of performance of the obligations without any addition to
the contract price.
b. If a force majeure situation arises, the Contractor / Licensee shall promptly notify the Board
in writing of such condition and the cause thereof, but not later than 7days from its
occurrence. Unless otherwise directed by the Board in writing, the Contractor shall continue
to perform its obligations under the contract as far as reasonably practicable.
The Contractor/ Licensee shall demonstrate to the Board’s satisfaction that it has used its
best endeavor to avoid or overcome such causes of delay and the parties will mutually agree
upon remedies to mitigate or overcome such causes of delay without having any right to
any claim on account of such force majeure.
c. In any other situation, which is beyond the reasonable control of the Contractor / Licensee
in the opinion of the Engineer In-charge, and where the Contractor has promptly notified
the Board in writing about such situation, it may be considered as “Force Majeure” situation.
6. Compliance with Statutes, Regulations:
The Licensee shall comply in all respects, with all statutes and regulations as may be necessary,
including clearance from State / Central Govt. Authorities, Pollution Control Boards, Labour
Enforcement and Local Authorities. The Licensee shall, at all times during the continuance of the
contract, so far as it may be necessary, comply with all the existing enactments including Central
and State Legislation as well as any By-Laws of any Local Authorities regarding labour, particularly
the Minimum wages Act, The Dock Workers (Safety, Health and Welfare) Act, 1986, The Dock
Workers (Safety, Health & Welfare) Regulations, 1990, Factories Act, Workmen’s Compensation
Act, Employees’ Provident Fund and Family Pension Fund Act, Employees’ State Insurance Act,
Contract Labour (Regulation and Abolition) Act, Payment of Wages Act, Maternity Benefit Act,
National and Festival Holidays Act, Shop and Establishment Act, The Apprentice Act and keep the
Licensor indemnified against any loss or claim arising out of contravention of the provisions of the
above said enactments by the Licensee. The total revenue share payable to contractor shall exclude
all expenses whatsoever the Licensee may be required to incur for the compliance with the
provisions of the above said legislation and no additional amount will be released other than
the total revenue share quoted and accepted by DPA. The Licensee shall make necessary
arrangements for the Licensor to witness the payment made by the Licensee to his staff and labour.
7. Payment Terms:
All payments shall be made in Indian rupees unless specifically mentioned.
The payment shall be made through RTGS /NEFT, and the Contractor should be
furnished following details: -
Bank Payment Agreement Form
a. Name of Party
d. Branch Station
e. IFSC code of the bank
g. Accepted for : - NEFT payment or RTGS payment Declaration by the party
I/We hereby declare that the above information furnished by me is correct and DPA is
requested to pay my / our dues to this account for this work is concerned.
Signature of the party with the seal
Declaration by the bank
It is hereby informed that the details mentioned by the party is correct as per our records
and any payment made by DPA to this account will be accepted either by RTGS/NEFT.
Signature of the bank manager with the seal.
(i) No Advance payment will be made.
(ii) Minimum Guaranteed Throughput (MGT) :
a) Minimum Guarantee for each crane shall be either 1MMT/annum @ Rs. 72/ ton
or Rs. 7.2 Crore per annum. Licensee handled cumulative cargo per crane per
year, either 1MMT/crane or received Rs. 7.2 Crore/crane shall be considered as
MGT has been fulfilled by DPA. Shortfall in MGT per year shall be compensated
by DPA shall be either 1MMT/annum @ Rs. 72/ ton or Rs. 7.2 Crore per annum
(whichever is lower in value, in Rs.), considering 1MMT @ Rs. 72/ton of cargo
handled. Cumulative average shall be calculated for any operator considering
total nos. of Cranes deployed and cargo handled by all of the Cranes of any
operator at DPA under this contract.
Cumulative annual MGT fulfilled by DPA:
Condition 1: Contractor holds license for 2 Cranes and handled total of 2 MMT in
a year, Crane no.1 handled 1.5 MMT and Crane no.2 handled
MMT. In this case it will be considered as MGT per year has been
fulfilled by DPA and no compensation will be given by DPA.
Condition 2: Contractor holds license for 2 Cranes and received total revenue
of Rs. 14.4 Crore in a year, revenue received for Cranes no.1 is Rs.
12 Crore and revenue received for Cranes no. 2 is Rs. 2.4 Crore.
In this case it will be considered as MGT has been fulfilled by DPA
and no compensation will be given by DPA.
b) In case of shortfall in annual MGT, compensation shall be paid by DPA either
difference of 1 MMT or Rs. 7.2 Crore, whichever is lower considering comparison
on rupees’ basis:
Licensee/Contractor handled only 0.9 MMT/crane in a year,
Shortfall = 1 – 0.9 = 0.1 MMT = 100000 Ton
Let’s assume revenue received in that year is Rs. 7.15 Crore/crane
Shortfall in MGT/Crane in Rupees = 7.2-7.15 = 0.05 Cr = Rs. 5,00,000/-……(B)
Comparing the above two cases (A) & (B), (B) is lower, hence only Rs. 5 Lakhs
shall be payable as compensation in shortfall in MGT for that particular year for
particular licensee/contractor.
c) Cargo handled by each HMCs at the end of each contract year from the commencement
of deployment shall be calculated & certified by the user department i.e. Traffic
Department of DPA, which shall be final and bound to the Licensee and accordingly
payments shall be released with TPIA verification & certification. Cargo handled by
each HMCs & Material Handler at the end of each month, shall be calculated & certified
by the user department i.e. Traffic Department of DPA, which shall be final and bound
to the Licensee and accordingly payments shall be released with TPIA verification &
certification. At the end of each year, cargo handling performance shall be calculated
and shall lapsed with that particular year, hence shall not be carried forward.
(iii) Monthly payment at the quoted percentage in revenue share, shall be made on the actual
cargo handled per HMC / per Material Handler considering the SoR rates of respective cargo
(iv) If the hired HMCs & Material Handler are only used for loading / discharging the entire ship
Quantity, then the Final Draught survey quantity will be considered for billing. If the Ship
cranes and hired HMCs & Material Handler both are used for loading / discharging cargo,
then the figure / reading given by the hired HMCs & Material Handler will be considered for
billing purpose. However, this quantity will not be more than the final draught survey qty. If
the hired and port owned both HMCs & Material Handler are used for loading / discharging
cargo and it is found that there is an excess reading/billing by HMCs & Material Handler, then
excess qty will be reduced on pro-rata basis to Final Draught survey quantity.
(v) Schedule of Rates (SOR) as per type of cargo shall be collected by DPA and quoted % of SoR
as demanded by the bidder/licensee as revenue share for the respective cargo shall be shared
(vi) Rates of DPA SOR prevailing at the time of last date of submission of the bid shall be
considered for First year of the contract for each type of cargo. From second year onwards
(two) % escalation per annum on the previous year shall be taken for calculation for revenue
share for respective cargo. Escalation as above shall be applicable for entire contract period
including extension period. {The 2 (two) % escalation effect is cumulative
irrespective of revision in SOR rates upward/downwards}.
(vii) There will not be any escalation other than 2% as mentioned in the contract, any
representation / claim shall not be entertained by DPA for what so ever reason.
(viii) The contractor should submit the bill every month duly seal and sign along with copy of online
payment transaction slip to their employees, payment to the engaged staffs viz., Name of
the employee, Net amount credited into bank, name of the Bank and date on which the
amount was credited into the bank. The contractor must certify that the payment to the
employees provided by him have to be credited to concerned individual bank.
(ix) Applicable rule for EPF shall be complied by the contractor for their employees and relevant
documents shall be submitted to DPA along with monthly bills same shall be verified by TPIA
(x) The Engineer-in-charge will be entitled to deduct or adjust any sum of money payable by the
contractor to DPA under the terms of any contract executed by him or on behalf from their
security deposit or from any sum that may become due from the present contract.
(xi) The contractor shall note that no interest be payable by the DPA for any delayed Payments
unless otherwise stipulated in tender.
(xii) If applicable, the payment from 2nd bill to pre-final bill, shall be released, subject to the
condition that the documentary evidence (copy of paid Challan in Govt. Treasury) of the
Welfare Cess @1% of work done or as amended by Statutory Authority from time to time,
paid to concerned authority is submitted for the previous bill.
(i) All manpower & machines to be posted at Kandla /Gandhidham as instructed by EIC, shall
be insured under the Workmen Compensation Act.
(ii) It will be entirely the contractor’s responsibility to take required steps to adequately safeguard
the personnel & machines and to ensure that the work is carried out in such a manner that
maximum safety to the personnel is assured. The contractor shall follow all precautions as
required for safety of workman by ILO regulations, etc.
(iii) No claim/compensation of whatsoever nature shall be entertained by the DPA for any loss
of property or injury or loss of life during the occurrence of any accident to the contractor’s
maintenance staff/officials or machines. Contractor is required to get insurance for his staff
and machines at his own cost.
9. Time is the essence of the contract:
Time is the essence of the contract, and the Contractor shall ensure that successful deployment of
HMCs & Material Handler in DPA shall be within the specified time period in this tender document.
The Contractor shall be solely responsible for all the delays including the delays caused by its
10. Liquidated Damages (Not applicable)
11. Variations:
In case of any variation in Instructions to Bidders (ITB), General Conditions of Contract(GCC) and
the Special Conditions of Contract – if any special conditions of contract shall prevail. But in case
of any requirement/condition specified in the Scope of Work, it shall prevail over all other conditions.
12. Acceptance (Not Applicable)
13. Guarantee: (Not Applicable)
GST: Revenue share quoted by the bidder as % (percentage) shall be excluding GST. GST will be
paid as applicable by DPA to the licensee on submission of Tax invoice and after satisfying the
requirement as per GST Act.
Contractor / Service provider / Supplier etc. has to ensure timely and proper filling of GSTR 1 so
that Deendayal Port Authority can avail input tax credit in timely manner. In case DPA not allowed
input tax credit due to failure on part of the contractor/Service provider/Supplier etc., it will be a
financial loss to the DPA and therefore same shall be recovered from the payment/deposit of
the contractor/service provider/supplier.
Deduction of Income-Tax:
Income-Tax deductions and surcharge as applicable thereon shall be made good while making
payments due to the contractor for carrying out the work and only net amount shall be paid as
directed by the Central Board of Direct Taxes, Ministry of Finance, Government of India.
The rates quoted by the contractor shall be deemed to be inclusive of the excise, other taxes,
duties etc., but exclusive of the GST (CGST & SGST), which the contractor will have to pay for the
performance of the contract. The employer will perform such dutiesin regard to the deduction of
such taxes at sources as per applicable law.
a. Deduction of taxes/income tax at source shall be made from the any bill of the Contractor in
accordance with the prevailing rules of Govt.
b. While performing under the contract, the damages caused by the Contractor or his workers
to any of the Port Authority property shall be promptly made good by the Contractor at his
own cost. In case the Contractor fails to repair/replace the damage, DPA shall have the right
to take steps to make good the damages and all the cost on this account shall be recovered
from the bills of the Contractoror, any money due to the Contractor from this contract or
any other contract or any other transaction. In determination of the damage, the opinion of
the Engineer-In- charge (EIC) shall be conclusive.
c. Any dues arising out of failure on the part of the Contractor to carry out any obligation under
the contract shall be deducted from the bills of the Contractor or from any moneydue to the
Contractor from this contract or any other contract.
16. Subcontracts:
The Licensee shall not be allowed to engage any sub-contract for operation of cranes & Material
17. Idle Charges: (-Not applicable-)
18. Personal Protective Equipment (PPE):
The Licensee shall be solely responsible, at his own cost, for the supply of required PPE to his
workers and staff and he shall also ensure the use of PPE such as safety shoes, helmets, nose masks,
hand gloves etc. by his staff at site.
The Licensee, at all times during the tenure of contract, shall take all measures to prevent any
unlawful, riotous or disorderly conduct by or amongst his staff at the site and for the preservation
of peace and protection of persons and property at the work site as well as in the neighborhood of
The Licensee shall inform about the occurrence of any incident/accident, at or about the work site
or in connection with execution of the contract, report such incidents/accidents to the Engineer-
In-Charge/ Officer-In-Charge as per the requirement of Dock Workers (Safety, Health & Welfare)
Regulations, 1990. He shall also provide the information about the incident/accident as requested
by the Traffic Department and Inspectorate of Dock Safety, Kandla.
21. Watch and ward:
During the execution of the contract, it shall be the responsibility of the Contractor to arrange
watch and ward of the work including the raw materials, machine/equipment/system used for the
work at his own cost for the entire period of License in DPA.
22. Termination:
a. The Board may, without prejudice to any other remedy for breach of contract, by written
notice of default sent to the Licensee, terminate the license in whole or in part:
b. If the Licensee fails to commission and commence commercial operation of the cranes within
the specified time period including extension, if any.
c. If the Licensee fails to perform any other obligation under the contract and does not cure
after receipt of a notice of default, its failure within the time specified in the notice. The
notice of default shall specify the nature of default as well as the time within which the default
has to be cured by the Licensee.
d. If the licensee fails to submit fresh performance security in the form acceptable as per Tender
of appropriate amount within 15 days from date of encashment of bank guarantee which has
been enchased by DPA in the event of failure of the license to pay any dues to DPA.
e. In case of termination of license for default by the Licensee, the amount of performance
security will be forfeited and Licensee will be debarred from participating in any of the future
tender of Deendayal Port Authority for a period of 3 (Three) years from the date of
termination. No compensation whatsoever shall be payable by the port to the licensee on
termination of license prior to the expiry of the license period.
23. Arbitration Clause:
(i) The Arbitration Award may be referred to a Conciliation Committees/ Councils comprising of
independent subject expert in order to ensure speedy disposal of thecase, as per Conciliation
(ii) The award of the Conciliation Committee/ Council if agreed by both the sides may thenbe
placed for consideration of the Board of Authorities of the Port subject to the delegation of
(iii) Except where otherwise provided in the contract, all questions and disputes relating to the
meaning of the specifications, designs, drawings and instructions herein before mentioned
and as to the quality of workmanship or materials used on the work or asto any other
question, claim, right, matter or any other thing whatsoever, in any way arising out of or
relating to the contract, designs, drawings, specifications, estimates, instructions, orders, or
to the conditions or otherwise concerning the work or regardingthe execution or failure to
execute the same whether arising during the progress of thework or after the completion
thereof as described hereinafter shall be referred to the Chairman for sole arbitration by
himself or by any officer appointed by him.
(iv) It will be no objection to any such appointment that the arbitrator is an employee of the
Board or the Government, that he had to deal with the matters to which the contract relates
and that in the course of his duties as an employee of the Board of the Government, he had
expressed views on all or any of the matters in dispute or of difference.
i. The arbitrator, who has been dealing with the arbitration case, being transferred or
vacating his office or in the event of his death or being unable to act for any reason,
the Chairman then holding the office shall arbitrate himself or appoint any officer to
act as arbitrator.
(v) It is also a term of this contract that no person other than the Chairman himself or any officer
appointed by him shall act as arbitrator.
(vi) It is a term of this contract that only such questions and disputes as were raised during the
progress of other work till its completion and not thereafter shall be referred to arbitration.
However, this would not apply to the questions and disputes relating to liabilities of the
parties during the guarantee period after completion of the work.
(vii) It is a term of the contract that the party invoking arbitration shall give a list of disputes with
amount of claim in respect of each said disputes along with the notice seeking appointment
(viii) It is also a term of the contract that if the Contractor does not make any demand for
appointment of arbitrator in respect of any claims/disputes in writing, as aforesaid, within
120 days of receiving the intimation from the Engineer –in- charge that the final bill is ready
for payment, the claim of the Contractor shall be deemed to have been waived and absolutely
barred and the Port Authorities shall be discharged and released of all liabilities under the
contract in respect of these claims.
(ix) It is also a term of the contract that the arbitrator shall adjudicate only such disputes/claims
as referred to him by the appointing authority and give separate award against each
dispute/claim referred to him. The arbitrator will be bound to give claim wise detail and
speaking award and it should be supported by reasoning.
(x) The award of the arbitrator shall be final, conclusive, and binding on all the parties to
(xi) The arbitrators from time to time, with the consent of both the parties, enlarge the time
for making & publishing the award.
(xii) Arbitration shall be conducted in accordance with the provisions of Indian Arbitration Act,
1996 or any statutory modifications or e-enactment thereof and rules made there under and
for the time being in force shall apply to the arbitration proceeding under this clause.
(xiii) It is also a term of the contract that if any fees are payable to the arbitrator, this shall be
pied equally by both the parties.
(xiv) It is also a term of a contract that the arbitration shall be deemed to have been entered on
the reference on the date he issues the first notice to both the parties calling them to submit
their statement of claims and counter statement of claims.
(xv) Venue of the arbitration shall be such place as may be fixed by the arbitrator at his sole
24. Indemnification:
The Licensee shall indemnify, protect and defend at its own cost, Deendayal Port Authority and its
heirs, administrators, executors, assigns & employees from & against any / all actions, claims,
losses or damages directly or indirectly arising out of the operations of the crane throughout the
license period.
The Engineer-in-Charge or his nominee may delegate any of the duties and responsibilities to
other people after notifying the Contractor and may cancel any delegation after notifying the
a. The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Contract Data to carry out the functions stated in the Schedule or other
personnel approved by the Engineer-in-Charge. The Engineer-in- Charge will approve any
proposed replacement of Key personnel only if their qualifications, abilities, and relevant
experience are substantially equal or better than those of the personnel listed in the Schedule.
b. If the Engineer-in-Charge asks the Contractor to remove a person who is a member of the
Contractor’s staff of his work force stating the reasons, the Contractor shall ensure that the
person leaves the Site within seven days and has no further connections with the work in
27. Queries about the Technical Data (-Not applicable-)
28. Discoveries
Anything of historical or other interest or of significant value unexpectedly discovered on the site is
the property of the employer. The contractor is to notify the employer or his nominee of such
discoveries and carry out the instructions of employer or his nominee for dealing with them.
29. Instructions
The contractor shall carry out all instructions of the engineer-in-charge or his nominee which
comply with applicable laws where the site is located.
The Contractor shall be responsible for the safety of all activities including but not limited to port
properties, assets and equipments, manpower etc. involved for the work under this contract.
31. Correction of Defects
a. The Engineer-in-Charge or his nominee shall give notice to the Contractor for any defects
observed during the operation, test & trials, TPIA observations etc. for the safe and efficient
operation of deployed HMCs & Material Handler.
b. Contractor is liable to rectify the defect as observed by DPA/TPIA for safe and efficient
performance of HMCs & Material Handler.
c. Each defect, breakdown, damages, non-operational period shall be recorded in hard copy
register same shall be verified by EIC or his nominee/TPIA on monthly basis. The
performance of HMCs & Material Handler shall be verified from this record including
performance, availability, utilization. Rectification date and time shall also be clearly indicated
by the contractor in the same register, which shall be certified by EIC or his nominee/TPIA.
32. Use of Contract Document:
The Contractor shall not, without prior consent, make use of any document except for the purpose
of performing this contract.
33. Memorandum of Settlement:
The Contractor shall not sign any memorandum of settlement with any agency such as Trade
Unions etc. in any form at any level without the prior written permission of the employer in relation
to any work undertaken by him in the Port premises.
34. Third Party Inspection:
i. The Third-Party Inspection Agency (TPIA) shall be arranged by DPA at its own cost.
ii. Contractor has to intimate DPA for the requirement for TPIA visit. Verification of cargo
handled data received from Traffic Department by the contractor for each deployed HMCs &
Material Handler shall be verified & certified by TPIA on monthly as well as, as & when
required basis.
iii. Applicable rule for EPF shall be complied by the contractor for their employees and relevant
documents shall be submitted to DPA along with monthly bills same shall be verified by TPIA
iv. The Third party shall carry out inspection of work as per tender specification/relevant
standard during deployment, re-deployment after overhauling/breakdown/repair, verification
of certificates & documents etc. as per the direction of EIC.
v. The payment of the contractor shall be released after certifying by the third party and copy
of the same shall be produced by Contractor for releasing the stage payment as per Payment
vi. All performance tests of the HMCs & Material Handler shall be carried out by the statutory
bodies as per requirement and certificate shall be verified by TPIA for the entire period of
vii. The Third Party shall carry out inspection of Staff-profile as per tender conditions &
viii. The third party agency shall inspect the working of the machines and submit report for any
non-confirmative thereof.
ix. The monthly payment shall be released after certifying by the TPIA for compliance of tender
requirements and copy of the same shall be produced by licensee for releasing the monthly
payment as per Payment Terms.
35. Engagement of labour:
The contractor shall, unless otherwise provided in the Contract, make his own arrangements for
the engagement of all staff and labour, local or other, and for their payment, housing, feeding and
36. Police verification of contract labour
The Contractor who has been awarded the job through Work Order shall furnish necessary Police
Clearance Certificate in respect of character and antecedents of all contract labourers engaged by
them, before commencing the work at site.
Contractor shall obtain such Police Clearance Certificate from Police available against a nominal fee
per Certificate and they will submit this Certificate giving Work Order reference on it, to the Office
of the Engineer in Charge of respective Divisions, to be forwarded to Commandant, CISF which our
Security Department along with requestfor issuance of Entry Passes.
The Contractor shall, if required by the Engineer-in-Charge, deliver to the Engineer- in-Charge a
return in detail, in such form and at such intervals as the Engineer-in- Charge may prescribe,
showing the staff and numbers of the several classes of labour from time to time employed by the
Contractor on the Site and such other information asthe Engineer-in-Charge may require.
(a) Submission of Labour Reports by Every Fortnight:
The contractor shall submit, by the 4th and 19th of every month, to the Engineer-in- Charge a
true statement showing, in respect of the second half of the preceding monthand the first
half of the current month respectively.
1. The number of laborers employed by him on the work.
2. Their working hours.
3. The wages paid to them.
4. The accidents that occurred during the said fortnight showing the circumstances under
which they happened, and the extent of damage and injury caused by them, and
5. The number of female workers who have been allowed Maternity Benefit, according to
clause 19 F and the amount paid to them, failing which, the Contractor shall be liable
topay to Government a sum not exceeding Rs. 200/- for each default or materially
incorrectstatement. The decision of the Engineer-in-Charge shall be final in deducting
from any bill due to the contractor the amount levied as fine and be binding on the
(b) No labour below 14 Years: No labour below the age of 14 (fourteen) years shall be employed
37. Registers to be maintained at site:
(i) Site order Book
A site order book is to be maintained by the contractor at the site. The work orders and
instructions written in the site order book shall be deemed to have been legally issued to the
contractor shall sign each entry in the site order book as a token of his having seen the
same. The site order book shall be property of the Board and shallbe handed over to the
Engineer-in-charge of the work in good condition on the completion of the work or whenever
required by the Engineer-in-charge or his authorized representative.
(ii) Hindrance Register
Every type of hindrance arising during the execution of work should be invariably recorded
in the hindrance register. The Hindrance Register is to be maintained by the Engineer in
Charge at the site. The contractor shall sign each entry in the hindrance Register as a token
of his having seen the same. The Hindrance Register shall be property of the Board.
(iii) Other registers needed to be maintained as per direction of EIC.
38. No damage, hindrance, or interference to the Port activities:
The contractor shall be required to execute the work in such a manner as not to cause any damage,
hindrance or interference to the Port activities and the work going on in thearea. The contractor
shall have to make good the loss at his own cost and risk all damages caused by his workmen to
Port property and no extra payment shall be made to him on that account.
39. Tools & Tackles:
All the requirements for executing the work will have to be arranged by the contractor at his own
cost. Arrangement for storing the materials, tools etc. will also have to be made by the contractor
himself. The employer shall not be responsible for any theft/loss of any materials, tools, etc.
stored/brought by the contractor for execution of work within the Port area. Licensor i.e. DPA will
not entertain any claim/request/presentation of the Licensee for the entire period of contract.
In case of carrying out any hot work such as gas cutting and welding necessary regulations,
prevailing at Deendayal Port Authority for such works shall be observedby the Tenderer and
necessary fire watch permit and No Objection Certificate shall be obtained from the concerned
authorities of the port and necessary charges at the scale of rate prevailing in the port at that time
shall be paid by the contractor.
41. Indian Dock Safety Regulation
Necessary Indian Dock Safety Regulations for the safety purpose shall be adhered to by the
contractor and he will be held responsible for any violation of the same.
42. Valid Electrical Contractor License and Electrical Supervisor Certificate: (Not
43. Undertaking by the Contractor:
Having understood all the terms and conditions of the tender document and having assessed the
site conditions, we hereby confirm that the price offered by us is a firm price and includes all the
taxes, (excluded GST), duties etc. and all incidental charges.
44. Labour License:
The contractor shall have to obtain necessary license from the Assistant LabourCommissioner
(Central), Gopalpuri, Kachchh in case he has to engage 10 or more workers on any day during the
execution of work or as amended from time to time as statutory requirement.
45. Jurisdiction of courts
All disputes shall be subjected to the jurisdiction of the local court of Gandhidham.
46. Change in communication address
In case of any change of address / status of the licensee, the same should be promptly notified to
47. Contract Agreement:
(i) The successful Bidder will be required to execute an agreement at his expense on Three
Hundred Rupees (Rs.300/-) Non-Judiciary Stamp Paper in the proper departmental format
mentioned in Section VI for the due and proper fulfillment of the contract within 21 days
from the date of Letter of Acceptance
(ii) Pending preparation and execution of the contract agreement as above, the tender submitted
by the Licensee together with CME’s letter accepting the tender shall constitute a binding
contract between the Board and the Licensee.
(iii) The agreement on stamp paper shall be furnished by the Licensee as per the following
guidelines within 21 days from the date of issue of Letter of Acceptance failing which the
successful bidder may not be granted license.
a. The original agreement as per the format attached with the tender should be executed
on a stamp paper of appropriate value (at present Rs.300/-)
b. The Agreement should be submitted in duplicate and the date of execution is to be
c. Each page of the document is to be signed by the Licensee/ his authorized
representative by indicating his full name.
d. If the Licensee is a partnership firm, then a copy of the Partnership Deed and in case
it is a Company, a copy of Memorandum and Articles of Association along with
Registration Certificate is to be submitted.
e. If the agreement is signed by a Partner/ a Director/ an authorized person of the firm,
in such case, a certified true copy of the power of attorney/ letter of authority given by
the firm/ company to the signatory of the firm/company is to be submitted.
f. The entire agreement should be in type written form/ computer printed form.
g. Leaving blanks and insertion of some contents of the agreement with hand writing
should be avoided.
h. All corrections/ additions made in the agreement are to be initialed.
Seal and signature Executive Engineer (Mechanical)
of the bidder Deendayal Port Authority
Special Conditions of Contract (SCC)
1. Minimum Guaranteed Throughput (MGT) :
a) Minimum Guarantee for each crane shall be either 1MMT/annum or Rs. 7.2 Crore per
annum, whichever is achieved. Licensee handled cumulative cargo per crane per year,
either 1MMT/crane or received Rs. 7.2 Crore/crane shall be considered as MGT has
been fulfilled by DPA. Shortfall in MGT per year shall be compensated by DPA either
1MMT/annum or Rs. 7.2 Crore/annum (whichever is lower in value, in Rs.),
considering 1MMT @ Rs. 72/ton. Cumulative average shall be calculated for any
operator considering total nos. of Cranes deployed and cargo handled by all of the
Cranes of any operator at DPA under this contract.
Cumulative annual MGT fulfilled by DPA:
Condition 1: Contractor holds license for 2 Cranes and handled total of 2 MMT in a
year, Crane no.1 handled 1.5 MMT and Crane no.2 handled 0.5 MMT. In
this case it will be considered as MGT per year has been fulfilled by DPA
and no compensation will be given by DPA.
Condition 2: Contractor holds license for 2 Cranes and received total revenue of Rs.
14.4 Crore in a year, revenue received for Cranes no.1 is Rs. 12 Crore
and revenue received for Cranes no. 2 is Rs. 2.4 Crore. In this case it
will be considered as MGT has been fulfilled by DPA and no
compensation will be given by DPA.
b) In case of shortfall in annual MGT, compensation shall be paid by DPA either difference
of 1 MMT or Rs. 7.2 Crore, whichever is lower considering comparison on rupees’ basis:
Licensee/Contractor handled only 0.9 MMT/crane in a year,
Shortfall = 1 – 0.9 = 0.1 MMT = 100000 Ton
Let’s assume revenue received in that year is Rs. 7.15 Crore/crane
Shortfall in MGT/Crane in Rupees = 7.2-7.15 = 0.05 Cr = Rs. 5,00,000/-……(B)
Comparing the above two cases (A) & (B), (B) is lower, hence only Rs. 5 Lakhs shall be
payable as compensation in shortfall in MGT for that particular year for particular
licensee/contractor.
c) Cargo handled by each HMCs at the end of each contract year from the commencement of
deployment shall be calculated & certified by the user department i.e. Traffic Department of
DPA, which shall be final and bound to the Licensee and accordingly payments shall be released
with TPIA verification & certification. Cargo handled by each HMCs & Material Handler at the
end of each month, shall be calculated & certified by the user department i.e. Traffic Department
of DPA, which shall be final and bound to the Licensee and accordingly payments shall be
released with TPIA verification & certification. At the end of each year, cargo handling
performance shall be calculated and shall lapsed with that particular year, hence shall not be
carried forward.
2. Availability of each HMC/ Material Handler shall be minimum for 95 % in any year, reduction in
annual availability below 95% shall results in reduction in MGT of 1 MMT in proportionate.
Availability in any year is 90%, then,
MGT in that particular year shall be (1x90)/95 = 0.947 MMT.
3. In case of non-operation worthy condition declared by Contractor or DPA for any reason for more
than total 180 days in a year (in any way either in piecemeal manner or on single event
occurrences), MGT shall not be applicable for particular year and no compensation will be
admissible for such year.
4. For routine maintenance purpose, total of 12 (twelve) days’ downtime per year per HMC &
per Material Handler, will be allowed to the contractor, which may be utilized at single or
multiple occasions without any penalty. However, for routine maintenance prior intimation
and permission shall be obtained from DPA. Any breakdown of HMC & Material Handler,
shall be intimated to DPA immediately and balance downtime may be utilized, for making
the HMC & Material Handler good for operational.
5. For Major maintenance purpose, 06 (Six) days’ downtime per year per HMC & Material
Handler, will be allowed to the contractor, which may be utilized at single or multiple
occasions without any penalty. Contractor may consume Routine maintenance period and
Major maintenance period for breakdown maintenance purpose, at one instance or in parts
allowed for each HMC & Material Handler, it cannot be claimed for more than 18 days in any
year for each HMC & Material Handler. Balance days of downtime of routine maintenance
and Major maintenance at the end of year shall be lapsed and not to be carried forward.
This down time shall be calculated on hourly basis.
Let’s assume, two occasions of down time as 3.8 hrs. and 6.2 hrs.,
Total downtime shall be calculated as total 4 + 7=11 hrs.
6. In case contractor offered multiple cranes, i.e. more than one HMC & Material Handler in
any combination, allowed downtime of total 18 days may be adjusted in overall within a
Contractor is operating 2 HMC and one Material handler in DPA.
For any year consolidated 18 x 3 = 54 days’ permissible downtime shall be allowed.
Balance days of downtime of routine maintenance and Major maintenance at the end of
year shall be lapsed and not to be carried forward.
Let’s assume, HMC no. 1 availed only 5 days of downtime in any particular year, HMC no.
2 availed 17 days of downtime for the same period, then maximum of 32 days may be
availed by the Material handler for that particular year.
7. TPIA shall be in the scope of DPA, however, contractor has to intimate DPA for the
requirement for TPIA visit. Verification of cargo handled data received from Traffic
Department by the contractor for each deployed HMCs & Material Handler shall be verified
by TPIA on monthly or as & when required basis.
8. HMCs & Material Handler will be booked on common roster basis for utilization of HMC &
Material Handler for cargo handling operation by DPA. However, frequent breakdown and
out of commission at the time of deployment in roster for use by DPA, roster turn will be
lapsed and HMCs & Material Handler turn for operation will go at last in line.
9. Roster will be prepared based on availability of all the Cranes in DPA without any priority.
However, DPA reserves the right to allot any Crane to any berth at some special
circumstances occasionally. Deployment of Cranes will be under the direction and control
of the Traffic Manager and CME, Deendayal Port Authority, which shall be final and
bounding without any claim / dispute.
10. Crane(s) deployment will be either for Cargo Jetty 1 to 10 or for Cargo Jetty 13 to
considering the Geographical partition by Cargo Jetty no. 11 & 12. However, allotment of
Crane(s) will be decided by Traffic Department based on operational requirement only,
which shall be bounding undisputedly.
11. LICENSEE’S OBLIGATIONS:
11.1 All the operational and maintenance requirement for successful utilization of the HMC’s & Material
Handler shall be in the scope of the contractor/licensee, including but not limited to accessories,
lifting appliances, tools & tackles, man power etc.
11.2 It shall be the responsibility of the licensee to ensure that the persons engaged for the work are
clear from Security angle. Police NOC is required to be obtained from local policy station. Such
NOC needs to be taken every year till expiry of license period including extension. DPA is covered
by ISPS code and all the related security concerns are to be taken care by the Licensee.
11.3 Licensee shall nominate an authorized Representative through Power of Attorney for carrying out
all the transactions/communications with DPA, including day to day operational requirement, status
updating, quantity handled, time of usage, other MIS including maintenance and communication
11.4 Licensee shall obtain license from DGFASLI before commencing commercial operation of the cranes
and as and when required for the statutory/safety test requirement purposes.License shall strictly
follow all labour related laws and regulations.
11.5 Licensee shall strictly follow all applicable Acts & Rules.
11.6 Licensee shall pay damage rectification cost for the damage caused to port properties/ under DPA
liability due to the fault of operation / maintenance / negligence / other faults.
11.7 The licensee shall install and operate the crane at their own risk and cost. The port is not
responsible for any type of damages to the HMCs & Material Handler or to their men or machine
deployed for operation of the cranes at DPA.
11.8 The licensee shall take third party insurance. The licensee is required to take such insurance from
the date the crane is brought inside the port area and it’s validity shall be till the completion of
licensed period. The Scope of the insurance shall also cover all the cargo handling workers / staff
of Deendayal Port so deployed in the operation.
11.9 The licensee shall be responsible to obtain all clearances and approvals from the statutory
authorities. Deendayal Port shall not be responsible for any loss / damage etc. occurring due to
delay in obtaining and / or not granting permission or approvals from statutory authorities.
11.10 All taxes and duties applicable to the licensee shall be payable by the licensee, Deendayal Port shall
not be responsible for non-recovery of any amount from the exporters or importers etc.
11.11 The operators / maintenance staff deployed by the licensee shall obtain permission from CISF for
entry into port premises as per the prevailing guidelines.
11.12 The licensee shall deploy the HMCs & Material Handler for the operation as per the requirement of
11.13 The licensee shall be bound by all the rules, regulations and bye- laws relating to handling
operations, maintenance, and the like which may be prescribed from time to time by Deendayal
Port Authority.
11.14 The crane deployed for operations shall be open at all times to the inspection of the licensor or his
authorized agents/TPIA or any other statutory agencies.
11.15 The Licensee at his own cost shall be solely responsible for the following:
(i) To execute the operation and maintenance of mobile harbour cranes & Material Handler
with due diligence, efficiency and in conformity with sound, administrative and financial
practices to protect the interest of the licensor.
(ii) To keep the work site free from obstructions.
(iii) To remove cranes from the berth as and when required by Deendayal Port Authority.
11.16 The licensee shall deploy and operate the Diesel & Electric (Duo) Powered Mobile Harbour Crane
& Material Handler at his own cost. Facility for Power connection will be provided near the jetty
or near the available source at 11 KV level from where the tapping along with necessary
arrangements shall be in the scope of Licensee at their cost. Charges towards Consumption of
Electricity shall be paid by the licensee to DPA as per the applicable tariff.
11.17 In case of non-availability of Electric supply, the HMCs & Material Handler shall be required to be
operated on Diesel drive, otherwise the HMCs & Material Handler are liable to be declared as non-
operational. Cost towards all the consumable including but not limited to diesel for any operations
of HMCs Material Handler, same shall be arranged by the contractor at their own resources and
11.18 The firm shall provide trained and experienced personal for satisfactory crane operations.
11.19 The firm shall take comprehensive insurance for its crane(s), operating personnel(s) including
Third Party liabilities. All liabilities on account of workmen compensation shall be on account of
the contractor.
11.20 For safety of crane and personnel(s), crane shall work strictly as per manufacturer’s load chart
and should adhere to all applicable safety & precautionary measures.
11.21 The crane shall be provided with enough operators, helpers, service & maintenance staff to meet
the site working conditions round the clock & all other consumables (if any).
11.22 Sufficient spares with minimum of critical spares shall be maintained as per OEM list of essential
items/parts etc. for each HMCs / Material Handler. It will be the responsibility of the licensee to
keep sufficient spares readily available to make the cranes operational for round the clock cargo
operation. The list of Critical spares as recommended by OEM/OPM shall be submitted to DPA
with tender documents. Licensee shall also be liable for keeping the spares/items required for
routine maintenance as per schedule of OEM/OPM and shall keep the spares/items well in
advance for smooth functioning of HMCs /Material Handler.
11.23 Considering the long-term contract of 10 years which may be extended for any period but
maximum to 02 years, HMCs & Material Handler may be required to deploy on any cargo jetty
including the new jetties which may come in future during the tenure of contract including
extension. This liability of contractor shall be for one occasion for each five years for each HMCs
& Material Handler, which shall be carry forwarded till the end of the contract period at the risk
& cost of contractor.
11.24 Normally tyre mounted cranes are in use at DPA, in case licensee / contractor is deploying flat
shoe crawler mounted cranes on urgent requirement of DPA (within 03 months) and afterward
DPA observed non suitability/damaging of jetties from crawlers, same shall be modified/replaced
with tyre mounted or track mounted as directed by DPA, without any cost to DPA. Time period
for modification / replacement shall be given as 03 (three) months from the date of written
intimation by DPA. This modification/ replacement period shall be considered as available period
and no penalty shall be levied by DPA for that period of three months. However, MGT will be
deducted for non-operational period. Delay in modification/replacement beyond the allowed time
of 03 (three months) shall attract penalty as per penalty clause sr. no. 16 of Section-III (SCC).
12. LICENSOR’S OBLIGATION
(i) If required and requested by the licensee/contractor, space for containers shall be provided
as per applicable SOR rates.
(ii) DPA shall provide suitable place near the operational area for parking of the HMCs & Material
Handler, free of cost along with water for cleaning of HMC’s & Material Handler, subject to
availability. During non-operational period of HMC(s) & Material Handler, the same shall be
parked at the parking area or as per direction of DPA.
(iii) Administrative support only, for obtaining clearance from any statutory authority, shall be
provided by the employer.
(iv) On successful completion of all the obligations under the contract and on the request of the
Contractor, the employer shall issue a “Completion Certificate”.
(v) On successful completion of all the obligations under the contract and on the request of the
Licensee, a “Performance Certificate” will be issued by DPA.
(vi) DPA shall provide administrative assistance for necessary declaration letters & forms, without
any financial implication on DPA.
13. Safety Measures to be adopted by Licensee:
i. Compliance with Statutory Acts/Regulations:
The Licensee shall comply with all relevant safety regulations and standards set by local,
regional, and national authorities. This includes occupational safety, environmental, and
equipment safety regulations. Specifically, the Dock Workers (Safety, Health and Welfare)
Act, 1986 and The Dock Workers (Safety, Health & Welfare) Regulations, 1990 shall be
complied strictly. Also the Lifesaving rules and other safety rules of DPA shall be followed
strictly. The violation of the same shall lead to penalty deemed fit for the same.
ii. Manufacturer’s Safety Standards:
The Licensee shall ensure that the safety features and standards been adhered by the
manufacturer of the mobile harbor crane. It shall be ensured that the crane meets or even
exceeds industry safety standards.
iii. Operator Training and Medical Certification:
Ensure that operators are adequately trained and medically fit to operate the mobile harbor
crane and hold valid certifications.
iv. Safety Devices and Features:
The safety devices and advanced features for ensuring the human safety and mitigating fire
emergency shall be provided in the mobile harbor crane. This may include emergency stop
systems, load moment indicators, collision avoidance systems, advanced fire extinguishing
system and other safety features designed to prevent accidents.
v. Maintenance and Inspection Procedures:
The documentation outlining the recommended maintenance and inspection procedures for
the mobile harbor crane shall be developed and implemented. Regular inspections and
maintenance shall be executed rigorously for ensuring the ongoing safety and reliability of
vi. Emergency Response Planning:
The emergency response plan shall be prepared and submitted to mitigate all type of
emergencies related to mobile harbor crane. This should cover procedures for dealing with
accidents, fires, and other emergencies, as well as the availability of emergency equipment on-
vii. Load Capacity and Stability:
The load capacity and stability requirements of the mobile harbor crane shall be clearly
defined. It shall be ensured that the crane is operated within its specified limits, reducing the
risk of accidents due to overloading or instability.
viii. Work place environmental aspects:
The work place environmental aspects such as noise levels, emissions, or spill containment
measures, depending on the location and environmental regulations shall be monitored and
followed strictly.
ix. Documentation and Manuals:
The comprehensive documentation, including operation manuals, safety manuals, and any
other relevant documents shall be developed and followed. It shall be ensured that users
have access to this information necessary for safe operation and maintenance.
x. Personnel Protective equipment:
The Licensee shall be solely responsible, at his own cost, for the supply of required PPE
to his workers and staff and he shall also ensure the use of PPE such as shoes, helmets, nose
masks, hand gloves etc. by his staff at site.
The Licensee shall inform about the occurrence of any incident/accident, at the work site or
in connection with execution of the contract, report such incidents/accidents to the
Operation-In-Charge as per the requirement of Dock Workers (Safety, Health & Welfare)
Regulations, 1990. He shall also provide the information about the incident/accident to the
concerned department of DPA and Inspectorate of Dock Safety, Kandla. Licensee shall ensure
safe operational area of HMC & Material Handler by following safe working practices including
SoP (to be prepared for all types of operational & maintenance activities) & shall be got approve
14. Freedom to deploy additional Cranes
Deendayal Port Authority shall be free to deploy any number of additional Cranes during the
currency of the existing licenses in any manner i.e. owned / hired or by way of grant of additional
15. Fraudulent documentation by bidders:
Submission of fraudulent documents shall be treated as major violation of the tender procedure
and in such cases the Port shall resort to forfeiture of SD/BG of the bidder, apart from blacklisting
the firm for the next 3 years.
(i) The contractor shall deploy all the HMCs & Material Handler within 03 Months of stipulated
time period after issuance of LoA. However, in case of delay in successful deployment of
HMCs & Material Handler shall attract penalty of Rs. 3,90,000/- per week or part thereof for
delay in deployment of each HMCs, limiting to Rs. 78,00,000/-, i.e. 20 weeks, failing which
total performance security deposited shall be forfeited and contract may be terminated for
the respective HMCs & Material Handler. The competent Authority of DPA, at its discretion
may terminate the contract after 20 weeks of delay in deployment or give extension basis on
the justification & facts submitted by the Licensee.
(ii) In case of non-deployment of HMCs & Material Handler, DPA shall forfeit the Performance
Security Deposit against respective HMCs & Material Handler. In case none of the HMCs &
Material Handler deployed as per contract conditions awarded to the licensee, DPA shall
debar, cancel and ban all type of business activities with the respective Licensee within DPA
up to 03 years.
(iii) In case of shortage in throughput compared with minimum specified as under (as and when
amended by DPA, as per SOR/SoP):
Cargo MTPD (MT per day)
Salt 14,000 MT per day
Iron Ore 13,800 MT per day
Gypsum, MOP, Fertilizer 11,500 MT per day
Coal 13,000 MT per day
Food grains, pet coke, met coke 09,005 MT per day
Shortfall to the above minimum through put to be evaluated on the monthly hourly basis
and shall attract penalty of equal amount of loss of revenue to DPA, same shall be
recovered from the bills of the Licensee.
For example: HMC no. 1”
Cargo handled in April :
for Salt for 10.7 days
and Coal for 15.2 days
Minimum through put shall be, for Salt 14000*10.7 =1,49,800 Ton
and, for Coal 13000 * 15.2 = 1,97,600 Ton.
If actual though put achieved by the HMC no. 1 in April:
for Salt =1,25,000 Ton
and, for Coal =1,50,000 Ton.
Therefore, shortfall in through put of HMC no. 1 in April:
for Salt = 24,800 ton
and, for Coal = 47,600 ton.
Let’s assume, Licensee quoted for their revenue share as 48 % on the SoR for individual
cargo and therefore DPA share from the revenue will be 52%.
Let’s assume, SoR rates for handling for Salt =Rs. 70/- and for Coal = Rs. 90/-.
Loss in revenue for DPA for Salt = Rs. 24800* (52 % of 70) = Rs. 9,02,720/-,
And loss in revenue for DPA for Coal = Rs. 47600 * (52 % of 90) = Rs. 22,27, 680/-
Therefore, total revenue loss for DPA = 31,30,400/- and same shall be recovered from
the bills of the Licensee for the month of April for HMC no.1.
(iv) In case deployed HMC & Material Handler is getting frequent break down or not able to
handle the cargo between ship & jetty in the operational conditions of DPA at Kandla or
shortage in throughput and cargo handling operation at DPA is hindered, Licensee is liable
to replace the required HMC & Material Handler by new one as re-deployment, within a period
of 03 months failing which DPA will forfeit the PSD for respective HMC / Material Handler.
TPIA of DPA will verify each such occurrence of event and decision of EIC in this regard will
be final and bounding.
(v) Non-availability due to shortage of spares or any items required for successful operation of
cargo handling at DPA shall be in the account of licensee including cost of such materials.
Licensee shall keep all
(vi) It will be the responsibility of the Licensee to operate and maintain the HMC & Material
Handler in safe and efficient manner as per prevailing rules, deficiencies in any rule may
results in termination of License.
(vii) Availability below 50% in any year for any reasons, results in no MGT by DPA for that
particular year. Reduction in availability for the reasons attributable to the contractor will
attract reduction in MGT in proportion and penalty both.
(viii) Availability below 50% in any year for the reasons attributable to the contractor
may results in termination of the contract including penalties as specified in this tender
(ix) Availability of each HMC & Material handler shall be minimum for 95 % in any month.
Reduction in availability for the reasons attributable to the Licensee below 95% in any month
(corresponding to no. of days of a particular month) shall attract penalties as under:
Sr. No. Reduction in availability Penalty
1 Availability < 95% Rs. 10,000/- per hour.
SCOPE OF THE WORK
1. Broad Scope of Work
(a) Commencement of Hiring / License Period: Subject to other provisions of the Order, the
revenue share starts from the date, when the crane(s) is deployed and ready for operation,
meeting all statutory requirements.
(b) Successful deployment of HMCs & Material Handler at DPA for successful operation to handle
the cargo at Kandla including but not limited to, Supply, Installation, Testing, Commissioning,
complete Operation and Maintenance etc. of two nos. HMCs of 100 MT or above capacity &
one Material Handler with minimum of 35 meters reach along with suitable size of grabs on
Revenue sharing basis for up to a period of 10 years extendable up to 02 more years on
same terms & conditions at DPA.
(c) It will be required to handle project / ODC Cargo, may be through tandem operation, other
than bulk & break bulk cargo.
(d) De-mobilization of HMCs & Material Handler after clearance from DPA, on completion of
contract period from the port area, within 30 days.
(e) The Licensee shall supply 02 no. of HMC & 01 nos. of Material Handler for deployment at
DPA, The HMCs and Material Handler shall be manufactured within 07 (seven)
years, before the last date of bid submission.
2. Duration of Hiring i.e. License period of HMCs and Material Handler:
Sr. Description License Extendable
No. period period
i Date of manufacturing of HMCs/Material Handler within one year before 10
the last date of bid submission.
ii Date of manufacturing of HMCs/Material Handler within two years before 09
the last date of bid submission.
iii Date of manufacturing of HMCs/Material Handler within three years 08
before the last date of bid submission.
(a) Extendable period is on the same terms & conditions, subject to satisfactory performance.
(b) If Bidder initially deployed old HMC/Material Handler as per conditions of this tender document
and however afterward Licensee requested and deploy new HMC/Material Handler before
completion of initial License period, DPA may consider for revised license period as per above
table, Sr. No.- (i) i.e. “Date of manufacturing of HMCs/Material Handler within one year before
the last date of bid submission”, but in any case license period shall not be more than
(ten) years and extendable period of 02 (two) years’ subject to satisfactory performance.
3. Technical Specifications for HMCs and Material Handler:
The offered HMC and Material Handler Crane shall meet the following requirements.
Sr. No. Description of Parameter Details / Requirement
1. Vessels to be Handled Panamax / New Panamax / Baby cape / Cape/ others
2. Crane Operability DGFASLI authorized competent person’s certification
OEM Certification on operational performance
and safety compliance regarding
reliable operation during O &M.
3. Lifting capacity of HMCs For HMC: 100MT or above,
and Material Handler For Material Handler: 30MT or above, which must
meet the cargo throughput as per SoR criteria of DPA,
as and when amended.
4. Outreach Min. 40 Mtrs. or above for HMCs and 35 Meter or above
for Material Handler.
5. Uniform load distribution The berth is designed for live load of 5 MT/m2.
However the pad sizes should not be less than 6 x
6. Mode of operation Diesel + Electrical (Duo), shall operate on 11 KV
7. Grabs For HMCs: 2 Nos. each crane (one of 30 to 35 cbm and
second shall be ≥ 22 cbm).
For Material Handler of suitable capacity with quick
coupling arrangement: Loading Hook with Minimum one
each for high density bulk cargo, low density bulk cargo
and Orange peel grab for scrap, wood grab, steel coil
handling attachments, pipe handling attachment, pan
attachment etc.
Note: Suitable for handling Salt, Soya Bean, wheat,
sugar, bagged cargo, Urea, MOP, Sulphur, RSM, clay,
scrap, coal, coke, Project, pipes, wooden logs, steel coil,
8. Minimum Average per day as Presently as per berthing policy, per day cargo handling
per SoR of DPA (as and when norms set by port for these cargoes are as under,
amended) (however same may be amended as and when
required basis by DPA):
Cargo MTPD (MT per day)
Salt 14,000 MT per day
Iron Ore 13,800 MT per day
Gypsum, MOP, Fertilizer 11,500 MT per day
Coal 13,000 MT per day
Food grains, pet coke, met 09,005 MT per day
4. Operational Requirement:
Sr. Description of Parameter / Details / Requirement
1. Working Days All days in a month including Sundays & National Holidays.
2. HMC Cranes & Material Valid statuary certificates in proof of completed statutory
Handler survey requirements
3. Operational team along As per requirements for operation & maintenance for 3 shift
with Crane operation
4. Formality related to Gate In scope of Licensee
entry permits / passes
The load test should be carried out before putting HMCs & Material Handler into operation or ready
to use. The load for the load test shall be arranged by the firm at their own cost. Load testing for
initial (and subsequent, if any) HMC crane & Material Handler shall be certified by an authorized
third-party inspection agency (TPIA) and DGFASLI authorized competent person and cost towards
engagement of DGFASLI authorized competent personal will be in scope of Licensee. The quoted
Prices of the firm shall be deemed to include load testing of the crane as required to establish the
lifting capacity of the crane. Moreover, supporting Cranes, equipment, consumables and tools &
tackles required for assembly and de-assembly of cranes is in the scope of the Licensee.
6. Movement of HMC Crane & Material Handler:
Movement of HMC Crane & Material Handler within berths at cargo jetty area of DPA will be carried
out as per requirement of DPA. The movement period is to be considered as hiring period and log
sheet to be signed accordingly.
7. The HMCs & Material Handler shall be provided with a weight meter, which shall be calibrated
minimum once in every year. However, in case of any complain/dispute with observation of TPIA,
calibration shall be carried out as and when situation arises at the cost of the Licensee. The
calibration certificate shall be submitted to DPA for verification. The Licensee shall maintain proper
records of the weight meter readings, which shall be submitted along with the monthly statement
for the verification of DPA.
8. After issuance of LoA within 30 days, Licensee shall submit the hard copy as proof for placement
of order for new HMCs & Material Handler. In any case HMCs & Material Handler shall be deployed
new only either own or hired. In case of hired, a documentary proof for the hiring agreement shall
be submitted to DPA.
9. The possession and effective control, at all the times, of the crane(s) shall be of the Licensee only.
Operation of the Crane should be handled exclusively by the trained operators.
Seal and signature Executive Engineer (M)
of the bidder Deendayal Port Authority
Grant of License for “Urgent hiring of 02 Nos. of Harbour Mobile Cranes (HMCs) of 100 MT
or above capacity & 01 no. of Material Handler of 35 meter or above reach on Revenue
sharing basis for a period of 10 years, extendable up to 02 years at DPA”.
Description Quote for Revenue Share in No. of HMCs /
% (percent) of SOR Material Handler
rates. for which license
(i.e. % of Share demanded is sought.
from SoR rates as on the date
of “Submission of
HMC of 100MT or above capacity % Nos.
with minimum of 40 meters reach.
Material Handler of minimum % Nos.
35 meters reach.
(1) Schedule of Rates (SOR) as per type of cargo shall be collected by DPA and quoted % of SoR
as demanded by the bidder/licensee as revenue share for the respective cargo shall be shared
(2) Rates of DPA SOR prevailing at the time of last date of submission of the bid shall be
considered for First year of the contract for each type of cargo. From second year onwards
(two) % escalation per annum on the previous year shall be taken for calculation for revenue
share for respective cargo. Escalation as above shall be applicable for entire contract period
including extension period. {The 2 (two) % escalation effect is cumulative
irrespective of revision in SOR rates upward/downwards}.
(3) There will not be any escalation other than 2% as mentioned in the contract, any
representation / claim shall not be entertained by DPA for what so ever reason.
(4) I/We accept to pay GST as applicable from time to time.
(5) I/We hereby certify that I/We have examined and am/are satisfied that they are accurate
and agree to abide by all these terms and conditions laid therein.
(6) The bidder quoting only for Material handler shall mark “Not Applicable” for BoQ-1
(7) The bidder quoting only for HMCs shall mark “Not Applicable” for BoQ-II
Seal and signature Executive Engineer (M)
Of the bidder Deendayal Port Authority
Deendayal Port Authority
Form of Agreement (for Execution of work)
(to be executed on Rs.300-non-judicial stamp paper)
[the successful bidder shall fill in this form in Accordance with the instructions indicated]
This agreement made of this day of Two Thousand Twenty-five
between the Board of Deendayal Port Authority, a body corporate under Major Port Authorities Act,
2021 have its registered office at Administration Office Building at Gandhidham (Kutch) (hereinafter
called the ‘Board’ which expression shall unless excluded by or repugnant to the context, be deemed
to include their successors in office) of the one part and (Name and address of all the
partners if a partnership with all their address) hereinafter called the ‘Licensee’ which expression
shall unless excluded by or repugnant to the context be deemed to include his / their heirs,
executors, administration, representatives and assignees or successors in office of the other part.
WHEREAS the Board is desirous to carrying out the work of
and whereas the Licensee has offered to execute and complete such work.
WHEREAS the Licensee has deposited a sum of Rs. (Rupees
only) as security deposit in the form of Online Digital Transfer or FDR or in form of Bank Guarantee
or Insurance surety bond for the due fulfilment of all the conditions of the contract.
NOW THIS AGREEMENT WITHINESS AS FOLLOWS:
1. In this agreement words and expression shall have the same meaning as are respectively
assigned to them in the general condition (including special conditions, if any) of contract
hereinafter referred to.
2. The following documents shall be deemed to form and read as construed part of this
agreement viz.:
i) Notice inviting tender.
ii) Instruction to Bidders
iii) General Condition of License
iv) Scope of Work
v) Tender submitted by the Licensee, including Section I to VIII of tender document.
vi) The schedule items of work with quantities and rates.
vii) Any correspondence made between the Executive Engineer (Mechanical) and the
Licensee after opening of the Cover-I -as regards to contain clarifications/details called
for vice versa.
viii) Common terms and conditions offered to Licensee and their acceptance including
confirmation to withdrawal of their own terms and conditions offered with the tender
ix) Bank Guarantee for security deposit.
1. The Licensee hereby covenants with the Board to complete the work of in
conformity in all respects, with the provisions of the contract.
2. The Board hereby covenants to pay the Licensee in consideration of such completion
of the works, the contact price of Rs. (Rupees
only) at the time and in the manner prescribed of the contract.
IN WITHNESS WHERE of the parties here unto have set their hands and seals the day and year first
above written signed and sealed by the Licensee in the presence of:
1. Name & Address
Signature of Licensee & Seal
2. Name & Address Seal
Signed, sealed and delivered by Shri on behalf of the Board in presence of
(Chief Mechanical Engineer)
Deendayal Port Authority
The common seal of the Board of Authorities of the Port of affixed in the presence of:
Deendayal Port Authority
SPECIMEN BANK GUARANTEE FOR PERFORMANCE GUARANTEE /
SECURITY DEPOSIT
(To be executed on Rs. 300/- non-judicial Stamp Paper& to be submitted after entering by issuing
Branch in their online system for generating Bank Guarantee in SFMS Mode)
The Board of Authorities of the Port of Kandla, Deendayal Port Authority
A.O. Building, P.O. Box No.50, Gandhidham -Kutch.
In consideration of the Board of Deendayal Port Authority incorporated by the Major Port Authority
Act, 2021 (hereinafter called “The Board” which expression shall unless excluded by or repugnant
to the context or meaning thereof be deemed to include the Board of Deendayal Port Authority, its
successors and assigns) having agreed to release Secured Deposit payment to hereinafter called the
(Name of the contractor/s) Under the terms and conditions of the contract, vide
’s letter No (Name of the
Date made between the contractors and the Board for execution of
covered under Tender No.
dated (hereinafter called “the said contract”) for the
payment of Security Deposit in cash or Lodgment of Government Promissory Loan Notes for the due
fulfilment by the said contractors of the terms and conditions of the said contract, on production
of a bank Guarantee for Rs. (Rupees
) only we, the (Name of the Bank and
(hereinafter referred to as “the
Bank”) at the request of the contractors do hereby undertake to pay to the Board
an amount not exceeding Rs.
(Rupees ) only against any loss or damage caused to
or suffered or which would be caused to or suffered by the Board by reasons of any breach by the
contractors of any of the terms and conditions of the said contract.
2. We, , do hereby
(Name of Bank) (Name of Branch)
Undertake to pay the amount due and payable under this guarantee without any demur merely on
a demand from the Board stating that the amount claimed is due by way of loss or damage caused
to or which would be caused to or suffered by the Board by reason of any breach by the contractors
of any of the terms and conditions of the said contract or by reason of contractor’s failure to perform
the said contract. Any such demand made on the Bank shall be conclusive as regards the amount
due and payable by the Bank under this Guarantee. However, our liability under this guarantee shall
be restricted to any amount not exceeding Rs. -
(Rupees ) only.
3 We, , undertake to pay to the (Name of Bank and
Board any money so demanded notwithstanding any dispute or disputes raised by the
contractor(s) in any suit or proceeding pending before any Court or Tribunal relating thereto our
liability under this present being absolute and unequivocal. The payment so made by us under this
bond shall be a valid discharge of our liability for payment thereunder and the Contractor(s) shall
have no claim against us for making such payment.
4. We, further agree with the Board that the (Name of Bank and Branch)
guarantee herein contained shall remain in full force and effect during the period that would be
taken for performance of the said contract and that it shall continue to be enforceable till all the
dues of the Board under or by virtue of the said contract have been fully paid and its claims
satisfied or discharged or till the
(Name of the user department)
of the said certifies that the terms and conditions of the said contract have been fully and properly
carried out by the said Contractors and accordingly discharge this guarantee. PROVIDED HOWEVER
that the Bank shall be the request of the Board but at the cost of the Contractors, renew or extend
this guarantee for such further period or periods as the Board may require from time to time.
5. We, further agree with the Board that the (Name of Bank
Board shall have the fullest liberty without our consent and without affecting in any manner our
obligations hereunder to vary any of the terms and conditions of the said contract or to extend the
time of performance by the said contract or to extend the time of performance by the said
Contractors from time to time or to postpone for any time or from time to time any of the powers
exercisable by the board against the said Contractors and to forebear or enforce any of the terms
and conditions relating to the said contract and we shall not be relieved from our liability by reason
of any such variation or extensions being granted to the contractors or for any forbearance, act or
omission on the part of the Board or any indulgence shown by the board to the Contractors or by
any such matter or thing whatsoever which under the law relating to sureties would, but for this
provision, have effect of so relieving us.
6. This guarantee will not be discharged due to the change in the constitution of the Bank or the
7. It is also hereby agreed that the Courts in Gandhidham would have exclusive jurisdiction
in respect of claims, if any, under this Guarantee.
8. We, Bank lastly undertake not to revoke this guarantee during its currency
except with the previous consent of the Board in writing.
9. Notwithstanding anything contained herein:
(a) Our liability under this Bank Guarantee shall not exceed Rs.
(b) This Bank Guarantee shall be valid upto ; and
(c) We are liable to pay the guarantee amount or any part thereof under this Bank Guarantee
only and only if you serve upon us a written claim or demand on or before
(date of expiry of Guarantee).”
10. (i) Name of Beneficiary’s Bank is State Bank of India, Gandhidham.
(ii) IFSC No. of Beneficiary’s Bank is SBIN0060239.
(iii) Bank Account No. of Beneficiary is10316591671. Date
For (Name of Bank) (Name) Signature
SPECIMEN FORMAT FOR DECLARATION
(To be executed on bidder’s letter head)
Ref: (Project Title)
The undersigned, having studied the pre-qualification submission for the above mentioned project,
(a) The information furnished in our bid is true and accurate to the best of my knowledge.
(b) That, in case of being pre-qualified, we acknowledge that the Employer may invite us to
participate in due time for the opening of Price bid of the Tender on the basis of provisions
made in the Tender Documents to follow.
(c) When the call for Tenders is issued, if the legal, technical or financial conditions, or the
contractual capacity of the contractor changes, we commit ourselves to inform you and
acknowledge your sole right to review the pre-qualification made.
(d) We enclose all the required pre-qualification data format and all other documents and
supplementary information required for the pre-qualification evaluation.
(e) We also state that no changes have been made by us in the downloaded tender formats and
understand that in the event of any discrepancies observed, the tender hoisted on website
of (n) procure is full and final for all legal/contractual obligations.
(f) We also declare that, our contractor has not been banned / de-listed by any government or
(g) We also give an undertaking that, we have not made any payment or illegal gratification to
any person / authority connected with the bid process so as to influence the bid process and
have not committed any offence under the PC Act in connection with the bid.
Name of the Bidder:
Represented by (Name & Capacity)
SPECIMEN LETTER OF AUTHORITY FROM BANK
(To be executed on Bank’s Letter Head)
The Board of Trustees of Port [insert port],
Sub: Our Bank Guarantee No. dated for Rs. favoring
yourselves issued on a/c of
M/s. (Name of Licensee)
We confirm having issued the above-mentioned guarantee favouring yourselves,
issued on account of M/s. validity for expiry upto date
and claim expiry date upto
We also confirm 1) 2) is/are
empowered to sign such Bank Guarantee on behalf of the Bank and his/their signatures is/are
binding on the Bank.
Name of signature of Bank Officer
EXCEPTIONS AND DEVIATIONS
Bidder is requested to refer the relevant Tender conditions along with clause no. 31 under Section-
I, for submission of bid without any deviation. Bidder shall certify that there is no deviation to the
standard tender conditions and document.
Sr. No. Page No. of Bid Clause No. of Bid Subject
Document Document Deviation
I/We hereby certify that there is no deviation made in the standard tender document
Duly authorized to sign this authorization on behalf of: [insert complete name of Bidder]
Date on day of , [insert date of
Deendayal Port Authority (DPA) hereinafter referred to as "The Principal"
................................................. (Name of The bidders and consortium members) hereinafter
referred to as "The Bidder / Contractor"
The Principal intends to award, under laid down organizational procedures, contract(s) /
concession(s) for Tender No. ............................. The Principal values full compliance with all relevant
laws of the land rules, regulations, economic use of resources and of fairness / transparency in its
relations with its Bidder(s) and / or Contractor(s).
In order to achieve these goals, the Principal will appoint Independent External Monitors (IEMs),
who will monitor the tender process and the execution of the contract for compliance with the principles
mentioned above.
Section 1 - Commitments of the Principal
(1) The Principal commits itself to take all measures necessary to prevent corruption and to observe
the following principles: -
(a) No employee of the Principal, personally or through family members, will in connection with
the tender for, or the execution of a contract, demand, take a promise for or accept, for self
or third person, any material or immaterial benefit which the person is not legally entitled to.
(b) The Principal will, during the tender process treat all Bidder(s) with equity and reason. The
Principal will in particular, before and during the tender process, provide to all Bidder(s) the
same information and will not provide to any Bidder(s) confidential / additional information
through which the Bidder(s) could obtain an advantage in relation to the tender process or
the contract execution.
(c) The Principal will exclude from the process all known prejudicial persons.
(2) If the Principal obtains information on the conduct of any of its employees which is a criminal
offence under the IPC / PC Act, or if there be a substantive suspicion in this regard, the Principal
will inform the Chief Vigilance Officer and in addition can initiate disciplinary actions.
Section 2 - Commitments of the Bidder(s) / Contractor(s)
(1) The Bidder(s) / Contractor(s) commits themselves to take all measures necessary to prevent
corruption. The Bidder(s) / Contractor(s) commits themselves to observe the following principles
during participation in the tender process and during the contract execution.
a. The Bidder(s) / Contractor(s) will not, directly or through any other person or firm, offer,
promise or give to any of the Principal's employees involved in tender process or the
execution of the contract or to any third person any material or other benefit, which he / she
is not legally entitled to, in order to obtain in exchange of advantage of any kind whatsoever
during the tender process or during the execution of the contract.
b. The Bidder(s) / Contractor(s) will not enter with other Bidders into any undisclosed
agreement or understanding, whether formal or informal. This applies in particular to prices,
specifications, certifications, subsidiary contracts, submission or non- submission of bids, or
any other actions to restrict competitiveness or to introduce cartelization in the bidding
c. The Bidder(s) / Contractor(s) will not commit any offence, under the relevant Prevention of
Corruption Act / Indian Penal Code / PC Act; further the Bidder(s) / Contractor(s) will not use
improperly, for purposes of competition, or personal gain, or pass on to others, any
information or document provided by the Principal, as part of the business relationship,
regarding plans, technical proposals and business details, including information contained or
transmitted electronically.
d. The Bidder(s) / Contractor(s) of foreign origin shall disclose the name and address of the
Agents / Representatives in India, if any. Similarly, the Bidder(s) / Contractor(s) of Indian
Nationality shall furnish the name and address of the foreign principals, if any. Further details
as mentioned in the "Guidelines on Indian Agents of Foreign Suppliers" shall be disclosed by
the Bidder(s) / Contractor(s). Further, as mentioned in the Guidelines all the payments made
to Indian agent / representative have to be in Indian Rupees only.
e. The Bidder(s) / Contractor(s) will, when presenting their bid, disclose any and all payments
made, is committed to or intends to make to agents, brokers or any other intermediaries, in
connection with the award of the contract.
f. Bidder(s) / Contractor(s) who have signed the Integrity Pact shall not approach the Courts
while representing the matter to IEMs and shall wait for their decision in the matter.
(2) The Bidder(s) / Contractor(s) will not instigate third persons to commit offences outlined above or
be an accessory to such offences.
Section 3 - Disqualification from tender process and exclusion from future contracts.
If the Bidder(s) / Contractor(s), before award or during execution has committed a
transgression through a violation of Section-2 above, or in any other form, such as to put their
reliability or credibility in question, the Principal is entitled to disqualify the Bidder
(s) / Contractor(s), from the tender process, or take action as per the procedure mentioned in the
"Guidelines on Banning of business dealings".
Section 4 - Compensation for Damages
(1) If the Principal has disqualified the Bidder(s), from the tender process prior to the award, according
to Section 3, the Principal is entitled to demand and recover the damages equivalent to Earnest
Money Deposit / Bid Security.
(2) If the Principal has terminated the contract according to Section 3, or if the Principal is entitled to
terminate the contract according to Section 3, the Principal shall be entitled to demand and recover
from the Contractor, liquidated damages of the Contract Value or the amount equivalent to Security
Deposit / Performance Bank Guarantee, whichever is higher.
(3) The Bidder(s) agrees and undertakes to pay the said amounts, without protest or demur, subject
only to condition that, if the Bidder(s) / Contractor(s) can prove and establish that the termination
of the contract, after the contract award has caused no damage or less damage than the amount
of the liquidated damages, the Bidder/Contractor shall compensate the principal, only to the extent
of the damage in the amount proved.
Section 5 - Previous transgression
(1) The Bidder declares that, no previous transgressions occurred in the last three years with any
other company in any country confirming to the anti-corruption approach or with any other
Public Sector Enterprises in India, that could justify his exclusion from the tender process.
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender
process or action can be taken as per the procedure mentioned in "Guidelines on Banning of
Business dealing".
Section 6 - Equal treatment of all Bidders / Contractors
(1) In case of a Joint Venture, all the partners of the Joint Venture will enter into agreement with
identical conditions as this on which all Bidder
(2) There is no provision of sub-contract in the tender, any violation of the same, Contractor shall be
held solely responsible for the same.
Section 7 - Criminal charges against violating Bidders / Contractors
If the principal obtains knowledge of conduct of a Bidder or Contractor or of an employee, or a
representative, or an associate of a Bidder or Contractor, which constitutes corruption, or if the
Principal has substantive suspicion, in this regard, the Principal will inform the same to the Chief
Vigilance Officer (CVO) and the CVO will take further necessary action as deemed fit in accordance
with the CVC Manual.
Section 8 - External Independent Monitor
(1) The Principal appoints competent and credible Independent External Monitor for this Pact after
approval by Central Vigilance Commission. The task of the Monitor is to review independently and
objectively, whether and to what extent the parties comply with the obligations under this
(2) The Monitor is not subject to instructions by the representative of the parties and performs his /
her functions neutrally and independently. The Monitor would have access to all Contact
documents, whenever required. It will be obligatory for him / her to treat the information and
documents of the Bidders / Contractors as confidential. He / she reports to the Chairperson of the
Board of the Principal.
(3) The Bidder(s) / Contractor(s) accepts that the Monitor has the right to access without restriction
to all Project documentation of the Principal including that provided by the Contractor. The Bidder
/ Contractor will also grant the Monitor, upon his / her request and demonstration of a valid interest,
unrestricted and unconditional access to the project documentation. The Monitor is under
contractual obligation, to treat the information and documents of the Bidder / Contractor with
(4) The Monitor is under contractual obligation to treat the information and documents of the Bidder(s)
/ Contractor(s) with confidentiality. The Monitor has also signed declaration on "Non- Disclosure
of Confidential Information" and of "Absence of Conflict of Interest". In case of any conflict of
interest arising at a later date, the IEM shall inform Chairman, DPA and recues himself
/ herself from that case
(5) The Principal will provide to the Monitor sufficient information about all meetings among the parties
related to the Project provided such meetings could have an impact on the contractual relations
between the Principal and the Bidder / Contactor. The parties offer to the Monitor the option to
participate in such meetings.
(6) As soon as the Monitor notices, or believes to notice, a violation of this agreement, he / she will so
inform the Management of the Principal and request the management to discontinue, or take
corrective action. The Monitor can in this regard submit non-binding recommendations. Beyond
this, the Monitor has no right to demand from the parties that they act in a specific manner, refrain
from action or tolerate action.
(7) The Monitor will submit a written report to the Chairperson of the Board of the Principal, within
to 10 weeks from the date of reference or intimation to him by the Principal and, should the
occasion arise, submit proposals for correcting problematic situations.
(8) If the Monitor has reported to the Chairperson of the Board of the Principal, a substantiated
suspicion of an offence under relevant IPC / PC Act and the Chairperson of the Board of the Principal
has not, within reasonable time taken visible action to proceed against such offence or reported it
to the Chief Vigilance Officer, the Monitor may also transmit this information directly to the Central
Vigilance Commissioner, Government of India.
(9) The word "Monitor" would include both singular and plural.
Section 9 - Pact Duration
9.1 This Pact shall be operative from the date of signing of IP by both the parties till the final completion
of contract of successful bidder and for all other bidders six months after the contract has been
awarded. Issues like warranty, guarantee, etc. should be outside the purview of IEMs.
9.2 If any claim is made / lodged during this time, the same shall be binding and continue to be valid
despite the lapse of this pact, as specified above unless it is discharged /determined by the
Chairperson, DPA.
Section 10 - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the Registered
Office of the Principal, i.e., Gandhidham, Gujarat.
(2) Changes and supplements as well as termination notices need to be made in writing. Side
agreements have not been made.
(3) If the Bidder / Contractor is a partnership or a consortium, this agreement must be signed by all
partners or consortium member
SPECIMEN LETTER OF AUTHORITY FOR
SUBMISSION OF BID
(To be executed on Rs.300/- non Judicial Stamp Paper)
The (PORT Address)
designation and Address) is/are authorized to represent us to bid, negotiate and conclude the
agreement on our behalf with you against tender no------------------------------------- and
his specimen signature is appended here to ..
We confirm that we shall be bound by all and whatsoever our said signatory shall commit.
We understand that the communication made with him by the Employer/Board shall be deemed to
have been done with us in respect of this Tender.
[Specimen signature]
Yours faithfully,
Signature: Name &
Designation: For & on behalf of:
FORMAT OF BID SECURITY DECLARATION FROM BIDDERS
(On Bidders Letter head)
Bid Security Declaration Form
Date: Tender No.
To (insert complete name and address of the Employer/ Purchaser) I/We. The undersigned, declare
I/We understand that, according to your conditions, bids must be supported by a Bid Securing
I/We accept that I/We may be disqualified from bidding for any contract with you for a period of
three years from the date of notification if I am /We are in a breach of any obligation under the bid
conditions, because I/We
a) have withdrawn/modified/amended, impairs or derogates from the tender, my/our Bid
during the period of bid validity specified in the form of Bid; or
b) having been notified of the acceptance of our Bid by the purchaser during the period of bid
validity (i) fail or reuse to execute the contract, if required, or (ii) fail or refuse to furnish the
Performance Security, in accordance with the Instructions to Bidders.
I/We understand this Bid Securing Declaration shall cease to be valid if I am/we are not the
successful Bidder, upon the earlier of (i) the receipt of your notification of the name of the successful
Bidder; or (ii) thirty days after the expiration of the validity of my/our Bid.
Signed: (insert signature of person whose name and capacity are shown) in the capacity of (insert
legal capacity of person signing the Bid Securing Declaration)
Name: (insert complete name of person signing the Bid Securing Declaration)
Duly authorized to sign the bid for an on behalf of (insert complete name of Bidder)
Dated on day of (insert date of signing)
EVIDENCE TOWARDS SITE VISIT
I, Shri authorized representative of M/s.
(Authorization letter issued by the firm with my specimen signature
and passport size photo and Aadhaar card are enclosed) have visited the site on with DPA
representative, Shri (Designation) for the work of “Urgent hiring of 02 Nos. of Harbour Mobile
Cranes (HMCs) of 100 MT or above capacity & 01 no. of Material Handler of 35 meter or above reach
on Revenue sharing basis for a period of 10 years, extendable up to 02 years at DPA”. and inspected
the site and other issues related to tender to my satisfaction.
Name, Signature and Seal Name, Designation and Name, Signature and Seal
of the Bidder Signature of DPA of Executive Engineer
representative who assisted (Mechanical)
bidder during the
Format of Insurance Surety Bond for Earnest Money Deposit
(To be executed on Non-Judicial Stamp Paper of Appropriate value)
Insurance Surety Bond No.............
(Name of Contract)
To: (Name and address of Employer)
WHEREAS (name of Bidder) (hereinafter called "the Bidder") has submitted its Bid dated (date
of bid) for the performance of the above named Contract (hereinafter called "the Bid")
KNOW ALL PERSONS by these present that We (name of Insurance Company) of............. KNOW
ALL PERSONS by these present that We (name of Insurance Company) of........... (address of
Insurance Company) (hereinafter called "the Surety"), are bound unto the Board of Deendayal Port
Authority (hereinafter called "the Employer") for the sum of. (amount), for which payment well and
truly to be made to the said Employer, the Surety binds itself, its successors and assigns by these
THE CONDITIONS of this obligation are as follows:
1. If the Bidder (a) withdraws or modifies its Bid during the period of bid validity, or (b) adopts corrupt
or collusive or coercive or fraudulent practices or defaults under Integrity Pact.
2. If the Bidder, having been notified of the acceptance of its Bid by the Employer during the period
of bid validity.
(a) fails or refuses to sign the Contract Agreement when required, or
(b) fails or refuses to submit the performance security in accordance with the Tender Documents.
We undertake to pay to the Employer up to the above amount upon receipt of its first written
demand, without the Employer having to substantiate its demand, provided that in its
demand the Employer will mention that the amount claimed by it is due, owing to the occurrence of
one or both of the two above-named CONDITIONS, and specifying the occurred condition or conditions.
The Surety declares that this Insurance Surety Bond is issued by the .................... (name of
Insurance Company) as per the applicable rules and regulations of Insurance Regulatory Development
Authority of India (IRDAI).
This Insurance Surety Bond will remain in force up to and including (date 90 days after the period
of bid validity), and any demand in respect thereof must reach the Surety not later than the above date.
For and on behalf of the Insurance Company in the capacity of
Common Seal of the Insurance Company with complete address including Tel. Nos./e-Mail Id. Staff
Authority No. of the officer of the Insurance Company/Signatory
INSTRUCTIONS FOR EXECUTION OF INSURANCE SURETY BOND FOR EANEST MONEY DEPOSIT
1. Insurance Surety Bond for Earnest Money Deposit should be executed on non-judicial Stamp
papers of requisite value in accordance with the stamp Act if applicable to that particular state of
Indian Union country of executing Insurance Company, where executed. In case the same is
issued by an International Insurance Company (it should be registered under insurance Act
or as amended from time to time and approved by the Insurance Regulatory Development
Authority of India (IRDAI)) the law prevalent in the country of execution shall prevail for the
purpose of Stamp Duty on the Insurance Surety Bond. However, in such a case, the Insurance
Surety Bond for Earnest Money Deposit shall be got confirmed by the Bidder through any Indian
Scheduled/Nationalized Insurance Company.
2. The executing officers of the Insurance Surety Bond for Earnest Money/Bid Security shall clearly
indicate in (block letters) his name, designation, Power of Attorney No./Signing Power No. as well
as telephone/ fax numbers with full correspondence address of the issuing Guarantee etc.
3. Each page of the Insurance Surety Bond for Earnest Money Deposit shall be duty signed/initialled
by the executing officers and the last page shall be signed in full, indicating the particulars as
aforesaid (sub-para 2) under the seal of the Insurance Company
4. Stamp paper shall be purchased in the name of Insurance Company counting the Insurance
Surety Bond, after the date ‘Notice Inviting Tender’, not more than six months prior to
execution/issuance of the Insurance Surety Bond. The name of the purchaser should appear at
the back side of stamp paper in the Vendors Sing. The issuing insurance Company shall be
requested independently for verification/confirmation of the Insurance Surety Bond issued, non-
confirmation of which may lead to rejection of ‘Insurance Surety Bond’.
5. Irrevocable, valid and fully enforceable Insurance Surety Bond in favour of the Employer (Name
of Employer) issued by any Insurance Company registered under insurance Ac amended from time
to time and approved by the insurance Regulatory Development Authority of India (IRDA) in Indian
currency (INR) only is acceptable to the Employer.
6. Insurance Surety and for Bid security in original shall be submitted along with the Bid. However,
the issuing Insurance Company shall submit an unstamped duplicate copy of Insurance Surety
Bond directly by registered post (A.D.) to the Employer (authority inviting tenders) with forwarding
FORMAT FOR INSURANCE SURETY BOND FOR PERFORMANCE GUARANTEE
(To be execute on Non-Judicial Stamp paper of appropriate value)
(Insurance Surety Bond No ....................... )
(Name of the Contract)
The Board of Authorities of
the Port of Kandla, Deendayal Port Authority A.O. Building,
Gandhidham – Kutch.
In consideration of the Board of Deendayal Port Authority of the Port of DEENDAYAL PORT
AUTHORITY (hereinafter called “ The Board” which expression shall unless excluded by or
repugnant to the context or meaning thereof be deemed to include the Board of Deendayal Port Authority
of the Port of [DEENDAYAL PORT AUTHORITY], its successors and assigns) having awarded to M/s
Registered/Head Office at .................................. (hereinafter referred to as the ‘Contractor’, which
expression shall unless repugnant to the context or meaning thereof, include its successors
administrators, executors and assigns), a Contract by issue of Employer’s Letter of Acceptance No.
................ dated.................... and the same having been acknowledged by the Contractor, for
…………… [Contract sum in figures and words] for ...................... [Name of the work] and the Contractor
having agreed to provide a Contract Performance Guarantee for the faithful performance of the entire
Contract equivalent to ……..(*) ........of the said value of the aforesaid work under the Contract to the
We ...............[Name & Address of the Insurance Company] ..’........ having its Head Office at
................... (hereinafter referred to as the ‘Surety’, which expression shall, unless repugnant to the
context of meaning thereof, include its successors, administrators, executors and assigns) do hereby
guarantee and undertake to pay the Employer, on demand any and all monies payable by the Contractor
to the extent of .............. (*) ............... as aforesaid at any time upto ................ (@) ...............
[days/month/year] without any demur, reservation, contest, recourse or protest and/or without any
reference to the Contractor. Any such demand made by the Employer on the Insurance Company shall
be conclusive and binding notwithstanding any difference between the Employer and the Contractor or
any dispute pending before any Court, Tribunal, Arbitrator or any other authority. The Surety undertakes
not to revoke this guarantee during its currency without previous consent of the Employer and further
agrees that the guarantees herein contained shall continue to be enforceable till the Employer discharges
this guarantee or till .................... [days/month/year] whichever is earlier.
The Employer shall have the fullest liberty, without affecting in any way the liability of the
Insurance company under this guarantee, from time to time to extend the time for performance of the
Contract by the Contractor. The Employer shall have the fullest liberty, without affecting this guarantee,
to postpone from time to time the exercise of any powers vested in them or of any right which they
might have against the Contractor, and to exercise the same at any time in any manner, and either to
enforce or to forbear to enforce any covenants, contained or implied, in the Contract between the
Employer and the Contractor or any other course or remedy or security available to the Employer. The
Insurance company shall not be released of its obligations under these presents by any exercise by the
Employer of its liberty with reference to the matters aforesaid or any of them or by reason of any other
act or forbearance or other acts of omission or commission on the part of the Employer or any other
indulgence shown by the Employer or by any other matter or thing whatsoever which under law would,
but for this provision have the effect of relieving the Insurance Company.
The Surety declares that this Insurance Surety Bond is issued by the .................. (name of
Insurance Company) as per applicable rules and regulations of insurance regulatory development
authority of India (IRDAI), and also agrees that the Employer at its option shall be entitled to enforce
this Guarantee against the Insurance Company as a principal debtor, in the first instance without
proceeding against the Contractor and notwithstanding any security or other guarantee the Employer
may have in relation to the Contractor’s liabilities.
i) Our liability under this Insurance Surety Bond shall not exceed ………(*)……
ii) This Insurance Surety Bond shall be valid up to ……………….(+)…………….
iii) We are liable to pay the guaranteed amount or any part thereof under this Insurance Surety Bond
only and only if Employer serve upon Insurance Company a written claim or demand on or before
WITNESS Signed for and on behalf of the Insurance
1. (*) This sum shall be Five percent (5%) of the accepted tender value for minimum validity period
of 03 years before signing the agreement denominated in the types and proportions of currencies.
(@) This date will be sixty (60) days, claim period of three months, same shall be
extended or renewed for same period, before 03 months of expiry of the previous
Performance Guarantee.
(+) This date will be the date of issue of defect liability Certificate.
Insurance Surety Bond should be executed on appropriate stamp paper of requisite value, such stamp
paper should be purchased in the name of Issuing Insurance Company, not more than six (6) months
prior to execution / issuance of Insurance Surety Bond. The name of the purchaser should appear at the
back side of stamp paper in the Vendors Stamp. Insurance Surety Bond should contain rubber stamp of
the authorized signatory of the Insurance Company indicating the name, designation and signature/
power of attorney number as well as telephone numbers / e-Mail Id with full correspondence address of
the Insurance Company. In case the same is issued by an International Insurance Company (it should
be registered under Insurance Act 1938 or as amended from time to time and approved by the Insurance
Regulatory Development Authority of India (IRDAl)), the law prevalent in the country of
execution shall prevail for the purpose of Stamp Duty on the Insurance Surety Bond.
However, in such a case, the Insurance Surety Bond shall be got confirmed through any
Indian Scheduled/Nationalized Insurance Company.
3. Insurance Surety Bond is required to be submitted directly to the Employer by the issuing
Insurance Company (on behalf of Contractor) under registered post (A.D.). The Contractor
can submit an advance copy of Insurance Surety Bond to the Engineer.
4. The issuing Insurance Company shall write the name of Insurance Company's controlling
branch/ Head Office along with contact details like telephone no., e-Mail Id and full
correspondence address in order to get the confirmation of Insurance Surety Bond from that
branch/ Head office, if so required.
(1) SOR applicable for Break Bulk cargo:
(2) SOR applicable for dry cargo:
(1) Cargo handling statistics at DPA:
https://www.deendayalport.gov.in/wp- content/uploads/2025/04/Traffic-
Handled-by-DPA-during-Last- 10-Years-2.pdf
(2) Available cargo handling infrastructure owned by Port and Berth occupancy
are available in Administrative Report:
https://www.deendayalport.gov.in/en/downloads/reports/
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-Tender.pdf
Corrigendum-I.pdf
Clarification HMC and MH 19 12 2025.pdf
Corrigendum AHMC.pdf
Corrigendum B.pdf
Corriendume -III (FOR UPLOADING).pdf
F Corrigendum 4 09 01 2026.pdf
Corrigendum-V.pdf
Corrigendum-5.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .