Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹5.1 L+₹18,484.84 (3.74%)Rejected-Finance GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | 2 | Rejected-Finance L2 | |
| 3 | 3₹5.3 L+₹35,942.76 (7.27%)Rejected-Finance 60 HILL VIEW COLONY INDIRA NAGAR DEHRADUN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | 3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical LANE NO 03 PRAGATI VIHAR RISHIKESH | - | Not Admitted-Fee/PreQual/Technical Others-tender fees and emd not submitted. Schedule C, Stamp paper not notarized by notary |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
29 Jan 2022, 5:00 pmClosed
SE(OSUPERINTENDING ENGINEER, O anANDM) CR DEHRADUN
SUPERINTENDING ENGINEER, O and M CIRCLE OFFICE, PTCUL, Yamuna Colony, Dehradun
AMC of 132KV Majra- Lal Tappar-Rishikesh Line under OANDM Division, Yamuna Colony, Dehradun
2021_PTCUX_41216_1
T-08/SE (O and M)/CR/D.Dun/2021-22
Open Tender
Miscellaneous Services
Lump-sum
365 days
DEHRADUN
AS BER BID
3 documents required · 3 mandatory
₹295
Executive Engineer (O and M), Division, PTCUL Dehr
₹15,000
15 Sept 2023
1 Jan 2022
31 Jan 2022
2 Jan 2022
29 Jan 2022
2 Jan 2022
Amount
Work of patrolling for one year of 132KV Majra Laltappar and Laltappar Rishikesh Transmission lines tower to tower and submitting the patrolling report in prescribed Performa to Majra /Laltappar Sub Division quarterly basis in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 27 meter wide gallery. Checking Points are given as below:- 1. Position of disc insulator. 2. Identification and number of missing tower parts. 3. Dislocation of dampers. 4. Condition of the conductor. 5. Condition of the earth wire. 6. Identification of week joints, deterioration of Jumpers, hot points and clamps etc 7. Position of tower earthlings. 8. Position of tower foundation. 9. Position of Danger plate, number plate and name plate.
Note:- The Contractor will provide 06 person team (01 number Supervisor, 02 number skilled lineman and 03 number semiskilled labour) along with 01 number Jeep at 132KV Substation Majra. All the required T&P and it's transporation will be provided by the contractor. Line T&P store of contractors must be located within 05 Km from 132KV Substation Majra
Lopping and chopping of trees and its branches near & under the gallery of 132 KV Majra Laltappar Rishikesh Transmission lines in fields or crops by removing one by one all branches & stems developing towards the line & removing the same from the 27 meter wide gallery of the line safely with rope for safety of line conductors and to minimize future tripping. (Quarterly basis in a year). Note:1. For detail BoQ check tebder document. 2. GST will be paid extra as applicable.
m/s star power solutions
Shiv Shakti Construction
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .