Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 66 2 48A SRIRAMNAGAR SRIHARIPURAM SRIHARIPURAM VISAKHAPATNAM ANDHRA PRADESH 530011 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
23 Mar 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Propeller and Rudder Routines on MV Skipper II
2022_HSL_89430_1
20 / 20015 / Propeller and Rudder / 244 / 2021-22
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
25 Mar 2022
18 Mar 2022
23 Mar 2022
18 Mar 2022
23 Mar 2022
18 Mar 2022
120 days
Amount
Routines / Overhauling / Servicing are to be carried out on Propeller Shafts, Stern Tube, Rudders, Steering System as per Scope of Work. Satisfactory trials to be offered to ship staff, Class Surveyor & HSL post completion of routines. Defects if any observed by Ship staff to be liquidated and trials to be reoffered. And Finally, Satisfactory trials to be shown to ship staff, Class & HSL. All measuring instruments, Consumables are covered in Contractor's Scope
The following Propeller and Rudder works to be carried out
Rudder wear down reading to be measured, recorded and shown to MMD surveyor
Rudder seal to be renewed (spares to be supplied by contractor) Oil float coat to be applied to Rudder
a) Removal & Refixing of Rudder
b) seal renewal
c) Pressure testing and float coat
d) Disconnect steering gear, lowering of Rudder stock to check spindle bush and fit back the Rudder stock and reconnect steering gear
Steering gear hydraulic cylinders 2no to be procured and Commissioned, old Hydraulic cylinders seals to be renewed (New Hydraulic cylinders and Seals to be supplied by contractor)
For Spares, Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items, material and fitted in its place. Contractor has to quote lumpsum cost for materials/spares for above entire SoW (S.No.2 to 9). The cost of spares quoted by the contractor will be considered "on not exceeding basis of total lumpsum cost mentioned in the BOQ" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (S.No.10) against third party / OEM invoice.
Propeller shaft rope guard to be removed wear down reading to be measured and Recorded, DP test & MPT to be carried out and shown to MMD Surveyor. DP test and MPT to be done by NDT Level II certified technician and to be arranged by contractor
Remove and refitting rope guard
Taking wear down reading & recording
Stern tube seal's (Inboard & Outboard) to be renewed with available spares on board
a) Removal & Refixing of Shaft
b) Dismantle of propeller
Stern tube to be pressure tested if any leak found same to be rectified
Propeller to be cleaned and varnished, DP test to be carried out and shown to MMD Surveyor after renewing of its seals
a) Scrapping & removing the marine growth from Propeller blades b) Light polishing of propeller blades c) DP test on blades
RAO ELECTRICAL ENGINEERIONG WORKS
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
avisan engineering enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .