| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 CrAccepted-AOC 0239 B L ARORA NEAR GOHANA CHOWK GOHANA ROAD GOHANA ROAD PANIPAT HARYANA 132103 UDYAM HR 14 0009176 | PANIPAT | HARYANA | 132103 | ₹15.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹15.3 CrRejected-Finance | ₹15.3 Cr | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹15.3 CrRejected-Finance | ₹15.3 Cr | L3 | Rejected-Finance Not L1 bidder |
| 4 | L4₹15.3 CrRejected-Finance | ₹15.3 Cr | L4 | Rejected-Finance Not L1 Bidder |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance System rejected due to Highest value quoted |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
23 Aug 2024, 2:00 pmClosed
BUH, HURL Sindri
BUH Office, Technical Building, HURL Sindri, Dhanbad
Bagging of Neem Coated Urea, Loading of Urea Bags for Wagon/Truck dispatch and other related services at HURL Sindri
2024_HURL_819579_1
HURL/Sindri/CnM/24-25/225
Open Tender
Miscellaneous Services
365 days
HURL Sindri
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹20 L
Yes
24 Sept 2024
2 Aug 2024
24 Aug 2024
2 Aug 2024
23 Aug 2024
2 Aug 2024
2 Aug 2024 - 20 Aug 2024
Amount
Bagging of Neem Coated Urea, Loading of Urea Bags for Wagon/Truck dispatch and other related services at HURL Sindri
BAGGING & STITCHING OF 45KG BAGS-(DOUBLE SPOUT) : Urea product handling, bagging & stitching of 45kg bags with double spout machine including cross-checking of filled bag weight. { Fixed supervisors deployment round the clock 24x7 at Bagging machine floor - 02 (Two) Supervisor in each shift }
WAGON DIRECT LOADING OF 45KG UREA BAGS : Receiving of 45kg urea bags from wagon loader at rail wagon door in covered wagon and on top in open wagon and stacking into rail wagon in approved pattern.
WAGON STACK LOADING OF 45KG UREA BAGS : Receiving of 45kg urea bags from 50 feet or less wagon loader and stacking on platform and stacking these urea bags into rail wagon in an approved pattern.(including Additional platform) { Fixed supervisiors deployment round the clock 24x7 at Loading and Additional platform - 02 (Two) Supervisor in each shift for entire wagon and truck loading/unloading/stacking operation}
WAGON STACK MANUAL LOADING OF 45KG UREA : Receiving of 45kg urea bags from wagon loader and stacking on platform loading of these stacked urea bags from 50 feet and above distance into rail wagon in stacked position.(including Additional platform)
TRUCK DIRECT LOADING OF 45KG UREA BAGS : Direct loading of 45kg urea bags into trucks/trolley in stacked position through truck loaders in approved pattern.
TRUCK STACK LOADING OF 45KG UREA BAGS : Stacking of 45kg urea bags at platform and loading into trucks/trolley in stacked position in approved pattern.
UNLOADING OF WAGON/TRUCK OF 45KG UREA BAGS : Unloading of 45kg urea bags from trucks/trolley or rail wagon and stacking on platform or transfer into another truck/trolley or wagon as directed by UPH plant.
RELOADING OF WAGON/TRUCK OF 45KG UREA BAGS : Unloading of filled 45kg urea bags from trucks/wagons and reloading.
LOADING RAKE,WITHIN FREE TIME LESS1H,45KG : For rake completion through direct/stack loading within period free time allowed by railways as per criteria mentioned.
STANDARDISATION OF 45KG DAMAGE BAGS : Handling of torn bags (10a and 10b) (a) Collection of filled torn bags from any location of bagging building and there transport to prilling tower and theer reclamation on prilling tower belt N-2002. Estimated Quantity - 11800 Ton (b) To transfer urea of acceptable quality from torn/damaged bags into new bags at platform including weight adjustment and stiching as required by UPH palnt. Estimated Quantity - 1200 Ton
HIRING OF SERVICES OF TALLY CLERK,45KG : Urea product handling and bagging of 45kg bags: hiring of services of tally clerk at all loading points.
EMPTY HDPE/PP BAGS UNLOADING : To unload,transfer and inspection empty HDPE/PP bag bales from tranport vehicle into empty bag storage including stacking of bales as desired by UPH plant. (500 bags per bale)
EMPTY HDPE/PP BAGS LIFTING AND DISTRIBUTION : To transfer empty HDPE/PP bag bales from main store to sub store at slat floors including distribution to various slats with the help of EOT crane/hoist/manually as desired by UPH plant (100 bags per bale)
WAGON CLEANING : Wagon cleaning and removing debris from the track area and dunnage and wall sheet spreading including other miscellaneous work.(Including Material as per annexure-4)
WAGON COVERING WITH TARPAULINE-SINGLE : Tarpauline covering (single) and tieing with rope on all sides for open wagon
WAGON SEALING : Rivet/bolt removal from door,door opening and closing the door after loading,riveting back,tying the seal card,applying LAC. Including Materials as per Annexure-1A and putting HURL siding seal for covered wagons.
HOUSEKEEPING AND CLEANING OF RAILWAY TRACKS : House keeping and cleaning of tracks to keep tracks free from urea,torn bags,debris and unwanted waste material.
MANPOWER ASSISTANCE FOR MISC.JOBS,8 HRS : Manpower assistance for misc. cleaning and housekeeping jobs in UPH facilities. * [NOTE - BIDDERS ARE REQUIRED TO QUOTE CONTRACTOR PROFIT/SERVICE CHARGES IN RS./MANDAY. IT MUST NOT BE LESS THAN RS. 27.79/MANDAY]
ADDITIONAL MANPOWER FOR HOLD BAG REMOVAL : Additional manpower supply for hold bag removal in uph operations. * [NOTE - BIDDERS ARE REQUIRED TO QUOTE CONTRACTOR PROFIT/SERVICE CHARGES IN RS./MANDAY. IT MUST NOT BE LESS THAN RS. 27.79/MANDAY]
ADDITIONAL MANPOWER FOR FC CONVEYOR CLEAN : Additional manpower assistance for FC conveyor gantry cleaning, bag removal and bag guiding in UPH plants platform* [NOTE - BIDDERS ARE REQUIRED TO QUOTE CONTRACTOR PROFIT/SERVICE CHARGES IN RS./MANDAY. IT MUST NOT BE LESS THAN RS. 27.79/MANDAY]
ADDITIONAL MANPOWER FOR MISC SHUTDOWN/ OTHER JOBS : Additional manpower assistance for MISC. Shutdown/other jobs to be carried out as per instruction of EIC at bagging building UPH * [NOTE - BIDDERS ARE REQUIRED TO QUOTE CONTRACTOR PROFIT/SERVICE CHARGES IN RS./MANDAY. IT MUST NOT BE LESS THAN RS. 27.79/MANDAY]
UNLOADING OF LDPE SHEET FROM TRUCK : Unloading of LDPE sheet from trucks and transfer to store as designated by S/I UPH.
UNLOADING OF THREAD BOX FROM TRUCK : Unloading of thread box from truck and transfer to store as designated by S/I UPH.
RAIN PROTECTION OF FILLED RAILWAY WAGON : Complete RAIN PROTECTION of filled railway wagon ( including materials as per Annexure-1B)in all respect
HOUSEKEEPING OF UPH PLANTS : Housekeeping and cleaning of HURL bagging plants, buildings,conveyors,neem oil spray system,neen oil loading and storage tank,neem oil seperation system,dedusting system,compressor area,platform and additional platform,track and surrounding area,conveyor gantry,shifting of urea lumps,torn bags packing material etc to the location marked by HURL's representative and other related jobs.(Minimum 16 manpower along with House keeping supervisor to be deployed by contractor per shift)
LDPE SHEET : LDPE sheet fixing in bottom and doors of all wagons of rack.
Spilled/Swept Urea : Shifting of spilled/swept urea to dissolving area (in Urea plant)
Bidder Name
Amount in Words
Bishamber Lal Arora H and T Contractor
LKL CONSTRUCTION CO.
PERFECT HANDLERS
CE INDUSTRIAL SERVICES PRIVATE LIMITED
PERFECT HANDLERS
Bishamber Lal Arora H and T Contractor
LKL CONSTRUCTION CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid