Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.7 LAccepted-AOC | ₹68.7 L Quoted ₹32,707.84 | L1 | Accepted-AOC At average L1 rate |
| 2 | L1₹68.7 LAccepted-AOC | ₹68.7 L Quoted ₹32,707.84 | L1 | Accepted-AOC At average L1 rate |
| 3 | L1₹68.7 LAccepted-AOC | ₹68.7 L Quoted ₹32,707.84 | L1 | Accepted-AOC At average L1 rate |
| 4 | L1₹68.7 LAccepted-AOC | ₹68.7 L Quoted ₹32,707.84 | L1 | Accepted-AOC At average L1 rate |
| 5 | L1₹68.7 LAccepted-AOC | ₹68.7 L Quoted ₹32,707.84 | L1 | Accepted-AOC At average L1 rate |
Tender Value
₹11.8 Cr
EMD Value
₹23.6 L
Closing Date
3 Apr 2023, 5:00 pmClosed
Superintending Engineer CCP-II
Victoria Cross Vijeta Gabar Singh Urja Bhawan
Repairing of 11/0.433KV 16kVA to 250kVA Aluminium wound damage distribution transformer
2023_UPCLC_56541_1
CCP-II/41/2022-2023
Open Tender
Repair and Maintenance Services
Item Rate
730 days
As per tender specification
Please refer Tender documents.
5 documents required · 5 mandatory
₹29,500
Yes
Executive Engineer Electricity Store Division UPCL
₹23.6 L
Yes
11 Jun 2024
21 Mar 2023
5 Apr 2023
21 Mar 2023
3 Apr 2023
23 Mar 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of 16KVA Transformer | |||||
| 1.01 | HV leg coils complete with insulation, vacuum impregnated in oil or fully dried out in “Air Drying Oven” SE Aluminum wire.(The rate shall be Variable) | 12 | Kg | - | - |
| 1.02 | LV coils complete with insulation, vacuum impregnated in oil or fully dried out in “Air Drying Oven” DPC Aluminum Strip.(The rate shall be Variable) | 8 | Kg | - | - |
| 1.03 | Fresh transformer oil of standard quality as per IS:335/83 and latest amendment thereof.(The rate shall be Variable) | 41 | Ltr | - | - |
| 1.04 | HV/LV bushing, Metal parts, Terminal connectors, Set of gaskets, Air type Breather with fresh silicagel, Oil level gauge, Tapping switch with handle, Oil drain and filter valve, Arcing horns, Air release valve, Dial type thermometer of 100 mm dia, Sundry items and any other item required for proper working of the transformer (The rate shall be Firm) | 1 | Lum sum per T/f | - | - |
| 1.05 | LABOUR CHARGES
(i) Cleaning and washing of dust and dirt from all parts including core, tank, cooling tubes, radiators, minor repair of core & tank, if required (ii)Painting inside with two coats of zinc chromate paint and outside of transformer with suitable primer and two coats of Bus Green paint and marking etc. (iii) Fitting/ fixing of new parts, making connections and assembly complete in all respects, re-tanking after repairs, filling fresh transformer oil, making transformer ready for test, testing for all routine tests as in case of new transformers as per IS:2026/ 1977 and any amendments thereof. (The rate shall be Firm) | 1 | Job | - | - |
| 1.06 | Transportation charges from any site in Uttarakhand / workshop to contractor works & from contractor works to UPCL site / Store center including, packing, forwarding, loading, unloading, stacking and transit insurance. (The rate shall be Firm) | 1 | Lum sum per T/f | - | - |
stage.html
html • 0.12 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
PQR41.xls
BOQ Document • 0.13 MB
BOQ_69066.xls
BOQ Document • 0.64 MB
117396947.pdf
Tender Document • 0.05 MB
Tenderspecs41.pdf
Tender Document • 0.41 MB
117396949.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .