| 1 | L1₹10.4 LAccepted-AOC 204 208 GAURI COMPLEX ABOVE BANK OF BARODA VASAI EAST MUMBAI MAHARASHTRA 401210 UDYAM MH 17 0013130 27AAACA3331K1ZX R M MSME STATUS AS VERIFIED | 401210 | ₹10.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.5 LRejected-AOC MALL ROAD GONIANA MANDI 151201 BATHINDA PUNJAB | GONIANA MANDI | BATHINDA | PUNJAB | 151201 | ₹10.5 L | L2 | Rejected-AOC L2 |
| 3 | L3₹10.9 LRejected-AOC | ₹10.9 L | L3 | Rejected-AOC L3 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹11,330
Closing Date
8 Jan 2026, 11:00 amClosed
SE(PEC, Cell ) O/o CE(Gen) SUNDER NAGAR
ER. Gagan SE (PEC Cell) O/o CE(Generation) HPSEB Ltd Sunder Nagar
CRYOGENIC CLEANING OF STATOR OF UNIT III of 3x42MW LARJI HEP
2025_HPSEB_124009_1
HPSEBL/SEPEC/CryogenicLarji/25
Open Tender
Miscellaneous Services
10 days
Larji Power House
Please refer tender document
2 documents required · 2 mandatory
₹590
₹11,330
3 Feb 2026
22 Dec 2025
8 Jan 2026
22 Dec 2025
8 Jan 2026
27 Dec 2025
CRYOGENIC CLEANING OF STATOR IN UNIT-III OF 3X42MW LARJI POWER HOUSE UNDER RESIDENT ENGINEER, LARJI POWER HOUSE DIVISION, HPSEBL, THALOUT DISTT MANDI (HP)
The scope of works involves execution of CO2 dry-ice jet cleaning on the complete stator assembly of Unit-III to remove embedded dust, carbon deposits, oil vapours and moisture contaminants affecting insulating integrity and cooling efficiency. Cleaning shall be performed through the access created after removal of two rotor poles (De-brazing and brazing in the scope of vendor) and from the back side of Stator (from the stator air cooler side), enabling reach to the stator core, winding overhangs, slot entry regions, and axial/radial ventilation ducts. The contractor shall deploy an industrial grade CO2 cleaning system with calibrated high-pressure nozzles, moisture traps, flow regulators, anti-static grounding and controlled pressure operation to ensure no mechanical abrasion or thermal stress to the insulation system. All equipment, dry ice/CO2 cylinders, hoses, scaffolding, protection sheets, illumination, consumables and technical manpower shall be arranged by the contractor. The work includes pre-cleaning inspection and joint recording of insulation Resistance (IR) and polarization Index (PI) values, followed by systematic CO2 blasting to achieve complete removal of conductive dust and contaminants from stator laminations, winding surfaces, end-winding bracings and internal cooling ducts. Humidity, dew point and electrostatic charge shall be monitored throughout the job. Post-cleaning, a joint inspection shall be carried out to verify surface cleanliness, intact insulation and clearance paths, IR and PI readings shall again be taken to confirm measurable improvements in insulation condition. The contractor shall ensure removal of all dislodged debris, restoration of the generator floor, and demobilization of all tools and equipment. A detailed completion report, including pre- and post cleaning test results procedure adopted equipment settings and photographic evidence shall be submitted to the Engineer-in-charge for technical record.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
CryVol1.pdf
Tender Documents • 3.58 MB
CryVol2.pdf
Tender Documents • 0.96 MB
CryVol3.pdf
Tender Documents • 0.40 MB
BOQ_182241.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid