| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.2 LAccepted-AOC | ₹46.2 L | L1 | Accepted-AOC accepted |
| 2 | L2₹46.7 LRejected-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | ₹46.7 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹49.5 LRejected-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | ₹49.5 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Saun Engineering and Construction Co P Ltd L3 | SHRI MOOLNARAYAN ELECTRICAL L1 | GURUKRIPA ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (Supply) | ||||||
| 2.00 | E-clamp for 11 KV | 159 | Nos | 130 ₹20,670 | 125 ₹19,875 Lowest | 125 ₹19,875 Lowest |
| 3.00 | Stay clamp for SP-23 Single end | 76 | Nos | 219 ₹16,644 Lowest | 220 ₹16,720 | 220 ₹16,720 |
| 4.00 | Stay clamp for SP-23 Double end | 106 | Nos | 280 ₹29,680 | 275 ₹29,150 Lowest | 275 ₹29,150 Lowest |
| 5.00 | Holding clamp for SP-23 without N/B | 166 | Nos | 148 ₹24,568 Lowest | 150 ₹24,900 | 150 ₹24,900 |
| 6.00 | LT Clamp with N&B ST pole SP-21 | 200 | Nos | 192 ₹38,400 Lowest | 195 ₹39,000 | 195 ₹39,000 |
| 7.00 | LT Clamp with N&B ST pole SP-10 | 300 | Nos | 178 ₹53,400 Lowest | 180 ₹54,000 | 180 ₹54,000 |
| 8.00 | Earth wire clamp for SP-10 with N/B | 185 | Nos | 220 ₹40,700 | 210 ₹38,850 Lowest | 210 ₹38,850 Lowest |
| 9.00 | Stay clamp for SP-21 with Nut & Bolt | 50 | Nos | 220 ₹11,000 | 210 ₹10,500 Lowest | 210 ₹10,500 Lowest |
| 10.00 | Stay clamp for SP-10 with Nut & Bolt | 150 | Nos | 198 ₹29,700 | 195 ₹29,250 Lowest | 195 ₹29,250 Lowest |
Tender Value
₹46.2 L
EMD Value
₹92,000
Closing Date
16 Dec 2024, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Kuwari under Capital (C.M. Ghosna No. 1675/2021)
2024_UPCL9_77713_1
EDC(R)-35/2024-25
Open Tender
Electrical Works
Item Rate
180 days
Bageshwar
As per Tender Document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹92,000
7 Aug 2026
11 Nov 2024
17 Dec 2024
11 Nov 2024
16 Dec 2024
11 Nov 2024
Amount
NON-CENTRALIZED MATERIAL (Supply)
E-clamp for 11 KV
Stay clamp for SP-23 Single end
Stay clamp for SP-23 Double end
Holding clamp for SP-23 without N/B
LT Clamp with N&B ST pole SP-21
LT Clamp with N&B ST pole SP-10
Earth wire clamp for SP-10 with N/B
Stay clamp for SP-21 with Nut & Bolt
Stay clamp for SP-10 with Nut & Bolt
Earth wire clamp for SP-23 with N/B
Earth wire clamp for SP-21 with N/B
PG clamp Rabbit to Rabbit
Shackle Insulator 100x115 mm with N&B
Stay Insulator 65x90 mm
LT spacer single phase three wire
Spacer 3 Phase 4 wire
Bracing clamp Top for SP-23 with N/B
Bracing clamp Bottom for SP-23 with N/B
11 KV Fuse set
MS clamp with N&B for Suspension Clamp
TPMO LT DB Holding Clamp for SP-23 with N&B
AL. Crimping Typer Lugs 70 Sq.mm
LABOUR PART
Chemical Earthing
Erection of Earthing Rod
Fabrication of Steel
Excavation of PIT for Stay Set
Erection of LT Stay Set
Erection of 11 KV Stay Set
Grouting of Stay Set
Excavation of PIT for Pole
Erection of Single SP-10 Pole
Erection of Single SP-21 Pole
Erection of Single SP-23 Pole
Erection of SP-23 Double Pole
Grouting of Pole
Muffing of Pole
Dismantling of LT line 1 P 2 w (weasel)
Painting of SP-10 Pole
Painting of SP-21/23 Pole
Laying of LT PVC Cables (Upto 150 Sqmm)
Inst. Of 25 KVA DTR on Pole Structure
Fixing of TPMO
Fixing of Fuse Set
Fixing of Lightning Arrestor
Laying of rabbit Conductor in HT line
Laying of 3P 4W LT line (Weaserl)
Laying of 1P 2W LT line (Weaserl)
Guarding of LT/11 KV line
Lopping & Chopping of tree Branches
Const. Inst of Danger Board/Number Plate
Cartage SP-10 Pole, 21-50 KM
Cartage SP-10 Pole, 100-150 KM
Cartage SP-21/23 Pole, 21-50 KM
Cartage SP-21/23 Pole, 100-150 KM
Cartage of petty material 21-50 Km
Cartage of petty material 100-150 Km
Cartage of petty material 150-200 Km
Cartage of 16/25 KVA DTr, 21-50 Km
Cartage of 16/25 KVA DTr, 100-150 Km
Headload cartage SP-10 Pole(1-3 Km)
Headload cartage SP-21/23 Pole(1-3 Km)
Headload Cartage of material (1-3Km)
Headload Cartage of 25 KVA DTR (1-3Km)
Erection Charges of Structure
Supply N Fixing of MS Plate B work
GURUKRIPA ENGINEERS AND CONTRACTORS (BID ID -346786)
Saun Engineering and Construction Co P Ltd (BID ID -347813)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].