Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC 472 C 1 TOCOL MACHINE TOOLS PRIVATE LIMITED 13TH CROSS 4TH PHASE PEENYA INDUSTRIAL AREA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | ₹1.6 Cr Quoted ₹1.7 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹26.1 Cr+₹24.5 Cr (1450.7%)Rejected-AOC 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | ₹26.1 Cr+₹24.5 Cr (1450.7%) | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
6 Jan 2025, 2:00 pmClosed
DGM(SRM)
Ship Repair Materials Department Cochin Shipyard LTD Perumanoor PO
FCBT JOBS IN NAVY VESSEL RM0807
2024_CSL_221695_1
CSL/SR1/VKD366
Open Tender
Marine Services
Works
90 days
Karwar/CSL/Cochinport
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Feb 2025
27 Dec 2024
7 Jan 2025
27 Dec 2024
6 Jan 2025
27 Dec 2024
27 Dec 2024 - 6 Jan 2025
Amount
FCBT (Feed Condensate and Booster Pump) - FCBT 1 (SERVICE COST)
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing.
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
(f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
(g) Overhauling of HP drain 3-way valve view not holding.
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
(i) Gland packing renewal and tightening of feed pump and condensate pump.
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(k) Operationalization of axial float mechanism of turbine.
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
(n) Operationalization of FCBT RPM indicator.
(o) Hot SDCs of the FCBT pump to be proved.
(p) Ultrasonic thickness gauging of Turbine Casing.
FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3 (SERVICE COST)
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required.
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04.
(e) Overhauling of HP drain 3-way valve view not holding.
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
(g) Gland packing renewal and tightening of feed pump and condensate pump.
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
(k) Operationalization of FCBT RPM indicator.
(l) Hot SDCs of the FCBT pump to be proved.
FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (SERVICE COST)
(a) High vibrations observed during operation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary.
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
(e) Overhauling of HP drain 3-way valve view not holding.
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
(g) Gland packing renewal and tightening of feed pump and condensate pump.
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
(k) Operationalization of FCBT RPM indicator.
(l) Hot SDCs of the FCBT pump to be proved.
FCBT (Feed Condensate and Booster Pump) - FCBT 5 (SERVICE COST)
(a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required.
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(c) Repair renewal of sentinel valve followed by setting and hot trials.
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04.
(e) Overhauling of HP drain 3-way valve view not holding.
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
(g) Gland packing renewal and tightening of feed pump and condensate pump.
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
(k) Operationalization of FCBT RPM indicator.
(l) Hot SDCs of the FCBT pump to be proved.
FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (SERVICE COST)
(a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing.
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
(f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04.
(g) Overhauling of HP drain 3-way valve view not holding.
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
(i) Gland packing renewal and tightening of feed pump and condensate pump.
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(k) Operationalization of axial float mechanism of turbine.
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
(n) Operationalization of FCBT RPM indicator.
(o) Hot SDCs of the FCBT pump to be proved.
(p) Ultrasonic thickness gauging of Turbine Casing.
Hot Lagging & Cladding (SERVICE COST)
1. 42. 5 Cladding over Steam auxiliary machineries 1.42.5.3 FCBT
Boilers and TD Auxiliaries (SERVICE COST)
1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs)
FCBT (Feed Condensate and Booster Pump) - FCBT 1 (MATERIAL COST)
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing.
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
(f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
(g) Overhauling of HP drain 3-way valve view not holding.
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
(i) Gland packing renewal and tightening of feed pump and condensate pump.
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(k) Operationalization of axial float mechanism of turbine.
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
(n) Operationalization of FCBT RPM indicator.
(o) Hot SDCs of the FCBT pump to be proved.
(p) Ultrasonic thickness gauging of Turbine Casing.
FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3 (MATERIAL COST)
(a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required.
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04.
(e) Overhauling of HP drain 3-way valve view not holding.
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
(g) Gland packing renewal and tightening of feed pump and condensate pump.
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
(k) Operationalization of FCBT RPM indicator.
(l) Hot SDCs of the FCBT pump to be proved.
FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (MATERIAL COST)
(a) High vibrations observed during operation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary.
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(c) Repair/ renewal of sentinel valve followed by setting and hot trials.
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04.
(e) Overhauling of HP drain 3-way valve view not holding.
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
(g) Gland packing renewal and tightening of feed pump and condensate pump.
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
(k) Operationalization of FCBT RPM indicator.
(l) Hot SDCs of the FCBT pump to be proved.
FCBT (Feed Condensate and Booster Pump) - FCBT 5 (MATERIAL COST)
(a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required.
(b) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(c) Repair renewal of sentinel valve followed by setting and hot trials.
(d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04.
(e) Overhauling of HP drain 3-way valve view not holding.
(f) Tuning and setting to work of PDR to achieve automatic and remote operation.
(g) Gland packing renewal and tightening of feed pump and condensate pump.
(h) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(i) Renewal of cooling manifold including diamond flange followed by application of putty.
(j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay.
(k) Operationalization of FCBT RPM indicator.
(l) Hot SDCs of the FCBT pump to be proved.
FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (MATERIAL COST)
(a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required.
(b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing.
(c) Overhauling of regulating wheel along with auto/ manual change over mechanism.
(d) Repair/ renewal of sentinel valve followed by setting and hot trials.
(e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required.
(f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04.
(g) Overhauling of HP drain 3-way valve view not holding.
(h) Tuning and setting to work of PDR to achieve automatic and remote operation.
(i) Gland packing renewal and tightening of feed pump and condensate pump.
(j) Overhauling of manipulators inclusive of electrical backplane and securing cover.
(k) Operationalization of axial float mechanism of turbine.
(l) Renewal of cooling manifold including diamond flange followed by application of putty.
(m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay.
(n) Operationalization of FCBT RPM indicator.
(o) Hot SDCs of the FCBT pump to be proved.
(p) Ultrasonic thickness gauging of Turbine Casing.
Hot Lagging & Cladding (MATERIAL COST)
1. 42. 5 Cladding over Steam auxiliary machineries 1.42.5.3 FCBT
Boilers and TD Auxiliaries (MATERIAL COST)
1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs)
YEOMAN MARINE SERVICES PVT. LTD. (BID ID -801148)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .