Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,600Accepted-AOC | L1 | Accepted-AOC Being lowest tenderer | |
| 2 | L2₹97,250+₹650 (0.67%)Rejected-Finance WANIAWAD BHUJ KUTCH 370001 | BHUJ | KUTCH | GUJARAT | 370001 | L2 | Rejected-Finance Not L1 |
Tender Value
₹96,900
Closing Date
10 Aug 2020, 3:00 pmClosed
Shri Anuraj Singh Rana, AE (Civ), Offg GE (AF)Bhuj
Bhuj-Kutch PIN-370001
Annual Maint and repair works are required to be carried out to EOT Crane 2.0 Ton Capacity SM No 341/7003-CN/10 installed at PMS-I at AF Stn Bhuj
2020_MES_363617_1
3020/eQ/21/20-21/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
The firm must be registered with HQ CWE (AF) Bhuj as approved supplier to carryout general order supply and job work
1 document required · 1 mandatory
₹0
Exempted
30 Sept 2020
24 Jul 2020
11 Aug 2020
24 Jul 2020
10 Aug 2020
24 Jul 2020
Amount
1. M and L for carrying out the following scheduled preventive maintenance for EOT crane SM No. 341/7003-CN/10 : - (a) Inspect for wear of bridge and trolley wheel, flat sports and check in flange. Ensure drive wheels are of the same diameter. (b) Check for worm collector shoes, sag in main runway wiring, ensuring contact to be kept through the entire length runway. Check alignment and relocation. (c) Servicing, cleaning and maintenance of gear box assy and repair of main gear box with spares such as seal for gear box and replacement of fresh gear oil. (24 Litrs) (d) Checking, cleaning the contacts of the contactors including replacement of contactors.(Each 4). (e) Checking the pin and bushes for wear of flexible coupling and proper adjusting. (f) Lubrication of all moving parts and applies fresh grease. (g) Cleaning the plumber blocks and applying fresh grease for lubrication. (h) Cleaning and greasing the wrinch assy including maintenance of rope wire complete. (j) Servicing, aligning, adjusting and replacement of the limit switches. (Each set 6) (k) Replacement of the cable guide with rollers.(32 Each) (l) Servicing, cleaning and replacement of speed control unit with minor components. (m) Checking the break system and repair of break liner pulley and replacement of the wear out break liners and alignment complete.(3 sets) 2. Checking for proper functioning of cranes and carrying out alignment if required. 3. Load testing of crane after complection of complete main work. Note : (a) All material, labor and T&P required for complete the job is responsibility of the firm. (b) All old retrieved cable shall be property of firm.
M/s Bombay Novelty Stores
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_405880.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .