Tender Value
₹1.4 L
Closing Date
31 Dec 2019, 1:00 pmClosed
Maj GS Pandey, GE (AF) Bhuj
GE (AF) Bhuj Bhuj-Kutch PIN - 370001
Repair/replacement and maintenance of transformer of capacity 100 KVA installed in sub stn No 13 (SM No 341/3013-TR/06) at AF Stn Bhuj
2019_MES_308393_1
3020/eQ/65/19-20/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
The firm must be registered with HQ CWE (AF) Bhuj as approved supplier to carry out general order supply and job work
1 document required · 1 mandatory
₹0
Exempted
23 Feb 2021
21 Dec 2019
1 Jan 2020
21 Dec 2019
31 Dec 2019
21 Dec 2019
Amount
(vii) Supply and fixing in replacement of porcelain transformer bushing on HT 11KV side including brass stems conical bush and gasket for transformer. (Each 03) (viii) M&L for preparation of old painted surfaces, by brushing /cleaning stains, greasy spot with thinner applying two coats synthetic enamel paint by spray painting complete. (Each Job 01). (ix) Supply and fixing of inreplacement of new silica gel breather assembly for transformer complete. ( Each 01). (x) Topping up of fresh transformer oil having di-electric strength not less than 50 KV/mm of Transformer chamber and conservator with new transformer oil up to the required level in it. (70 Per Litre). (xi) M & L for Dehydration/filtration and cleaning of transformer oil to be carried out till the di- electric strength reaches value of 50 KV/mm or above in one minute by dehydration machine including pre and post testing of transformer oil.( 130 Per Litre). (xii) Loading of serviceable transformer from workshop and unloading at work site. (Each Job 01). (xiii) Connection of transformer with HT side and LT side at work site place. (Each Job 01) (xiv) Final testing of transformer carry out at work site with giving existing load on it complete all as directed by in prescence of Enger-in -Charge. Note:- a) All material, labor and T & P required for complete the job is responsibility of the firm. (b) Old retrieved material shall be contractor property.
Jyoti Refrigeration
Hi-Tech Systems
M/s Samarpan Enterprise
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_345588.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .