| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC BAIKUNTHAPUR S T K K ROAD TRIBENI HOOGHLY 712503 | TRIBENI | HOOGHLY | WEST BENGAL | 712503 | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.2 L+₹3.1 L (18.2%)Rejected-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L2 | Rejected-AOC L2 |
Tender Value
₹17.7 L
EMD Value
₹35,477
Closing Date
2 May 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM SgTPP
Admin building Manigram Murshidabad SGTPP WBPDCL PIN 742237
Overhauling of UNIT II AHP Mechanical System Under Stage I at SgTPP
2022_WBPDC_374501_1
WBPDCL/SGTPP/NIT/E1824/21-22
Open Tender
Support/Maintenance Service
Lump-sum
21 days
SGTPP WBPDCL
As per NIT.
3 documents required · 3 mandatory
₹0
₹35,477
Yes
Admin building Manigram Murshidabad
28 Jun 2022
8 Apr 2022
5 May 2022
8 Apr 2022
2 May 2022
8 Apr 2022
15 Apr 2022
120 days
BA Feed gate actuator cylinder dismantling cylinder seal kit checking if required replacement, gasket fitting and cylinder fitting if required cylinder replacement
BA Feed gate allignment, checking/ replacement of side guide angles, rollers, wedges including water leakage arrest from enclosure body, checking/replacement of enclosure and checking/welding of joints inside enclosure
BA Clinker grinder overhauling (Dismantling of Crusher, checking/replacement of Shaft Structure, Cam Segments, Wear Plates, Bearings, Sprocket etc) and/or replacement of complete assembly of Crusher
BA Clinker Grinder gear box & fluid coupling checking, oil replacement, Alignment of motor to gear box to clinker grinder. Gear box bearing replacement if necessary
BA Jet Pulsion pumps overhauling by dismantling the whole assembly & checking/replacement of damaged parts like nozzle, combine tube, Tail pipe, nozzle insert and replacement of MS pipe after the jet pump up to KGV
BA Hopper four side trough seal nozzle checking, welding of nozzle pipe. Seal trough cleaning & water flushing. Replacement of seal trough header pipe upto 30 Mtrs
Checking of BA area CI bend(45 °, 90° bend & 45° lateral) after dismantling of both side coupling and if required replacement.
BA Clinker grinder chute checking, repairing, welding, painting and refitting
BA hopper all wall jetting nozzles and emergency door jetting nozzles dismantling, cleaning and replacement if required
BA hopper looking glass, water nozzle & inlet pipe checking and if required replacement
Checking & Replacement of coupling gasket below BA hopper. Replacement of coupling if any found damageed
Checking,servicing/replacement of 200NB KGV of BA area
Checking and servicing/replacement of water line valves(Gate, Globe, and Plug) at BA area & FAE tower area
Checking and replacement of economizer hopper knife gate valve after dismantling from its position and also checking/replacement of adaptor below KGV
Checking of economizer area all water line & its valves and replacement wherever is required
Replacement/repairing of flushing apparatus of Economizer Hopper. Also replacement of drop pipe below the flushing apparatus
Replacement/reparing of seal box of Economizer Hopper
Dry & wet cleaning of 04 nos. Economizer Hoppers and removal of ash & debris by bagging or by water. Also cleaning of economizer platform area and disposal of ash to dumping yard
Dry & wet cleaning of ash & debris from inside of 08 nos. Air Preheater hoppers & adjacent ducts by bagging and disposal at dumping yard
Vacuum line Gasket checking and replacement of vertical & horizontal portion of 8" & 10" line of A, B & C stream including Air Preheater line. Replacement of coupling if any found damaged.
Checking and servicing/Replacement of Seat, Disc Fluidizing tiles, Bearings, Gaskets of ESP Diffuser intake valves and Ash intake valves
ESP hopper fluidizing tiles dismantling checking, repairing/replacement and refitting
Checking/repairing/replacement of vacuum breakers
Cleaning of bag filters, surge hoppers, nuva feeders of A, B & C stream and disposal of ash to the dumping yard
Each Nuvafeeder top gate & bottom gate seat, disc & fluidizing tiles & other parts checking and servicing/replacement and cleaning.
Checking of each nuvafeeder vent valve, equalizing valve. Replacement of venting line to surge hopper, equalizing line and vent hose. Checking of nuvafeeder body fluidizing pad and replacement if necessary.
Surge hopper wall body welding checking, repairing and strengthening for A, B & C stream
Checking and Replacement of each Transfer Hopper Fluidizing Tiles.Checking and servicing/replacement of Top & Bottom Swing Disc gate valve and Vent & Equalizing valve, Swing Disc gate valve both side bearing.
Checking and Replacement of Square Fluidizing Tiles with gasket of Surge Hopper for A, B & C stream
Checking, Cleaning/Replacement and Refitting of total filter bag of FAE tower of A, B & C stream including pulse jet bar.
Checking/Replacement of wetting head nozzles, internals of collector tank and tailpiece for A, B & C stream
Wet mode air washer nozzle checking/ replacement of A, B & C stream. Ash cleaning inside air washer
Dry mode air washer nozzle checking/ /replacement. Ash cleaning inside of air washer
Checking & replacement of Double Disc Swing Gate valve at inlet of air washer (Wet & Dry) and at Dry mode vacuum relief valve
Replacement of Collector Tank Cone
Flushing/cleaning of Fluidizing air line of ESP hopper & FAE Tower-Surge Hopper, Transfer Hopper & Nuva Feeder
Checking/servicing/replacement of 8" & 10" TERSG valve and associated match piece & coupling
Checking and Servicing/Replacement of Air Intake valves of vacuum line.
Fly Ash line bend,elbow,match piece, wear piece & Tee checking/replacement of A, B & C stream
Replacement of 8" & 10" C.I pipe of Fly Ash vacuum line
Replacement of different size (up to 300 NB size) pipelines including bend, nipple, union, Tee, Coupling etc. of FAE tower, Bottom Ash & Eco hopper area
Dismantling and re-installation of all of the 56 nos. Diffuser Intake valve / Ash Intake valve adapter of ESP hoppers and replacement of gaskets if required and necessary action towards protection of vacuum lines during water jetting inside ESP.
A, B & C stream vacuum line dismantling,checking and cleaning after water jetting and re-installation below ESP hopper and water cleaning of vacuum line from Air washer to Vacuum Pump house
Castable Refractory Linking work inside Bottom Ash Hopper of Unit#II during O/H, including supply of refractory material [Fire Crete Special Castable ( TRL CAST FH-45), Recommended service temperature:13500C, Dry density (Kg/M3):2250, Cold Crushing Strength (Kg/cm2): 400 (at 1100C) & 300 (at 13500C)] & refractory S.S. anchors.
TECHNO ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .